# Evren Oeren

Chief Operating Officer, Saloro

## Career chronology

- **Named in July 2026 issuer presentation; exact role start not established: Saloro** — Chief Operating Officer. [EQR investor presentation July 2026](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03110733-2A1684305>) (PDF page 5, leadership slide)

## Education and qualifications

### Issuer-reported qualifications [evren_oeren_edu]

Issuer disclosure 2025–2026 · issuer reported · low materiality

The issuer reports an MSc in mining engineering and an MBA. These have not been verified with the institutions.

**Attribution:** Responsibility not applicable. Credential claims are issuer-reported; direct confirmation was not obtained.

**Relevance:** Background relevant to the stated role.

[Annual report 2025](<https://announcements.asx.com.au/asxpdf/20250930/pdf/06px30r3y5npl3.pdf>) (Printed page 3)

## Industrial safety

### Barruecopardo safety frequency [evren_oeren_barr_safety]

FY2025–September 2026 · issuer reported · high materiality

EQR reported Barruecopardo lost-time injury frequency declined from 22.5 in FY2025 to 15.8 in FY2026, then increased to 22.3 at September 2026. The company reports continued safety sessions and environmental monitoring.

**Attribution:** Role overlaps event; causation unproven. Site-level outcomes overlap the person’s reported role; the evidence does not establish personal causation or responsibility for any particular injury.

**Relevance:** Relevant context for operating oversight.

[Annual report FY2026](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03141730-2A1700403>) (Physical PDF page 6, printed page 4, safety section); [September 2026 quarterly activities](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03154247-2A1706584>) (PDF page 3, Health and Safety)

## Environmental record

### Restoration-plan non-compliance remained open [evren_oeren_restore]

October 2026 · issuer reported · medium materiality

The October quarterly says a risk of temporary suspension at Barruecopardo linked to partial non-compliance with the restoration mining plan had been mitigated after engagement with Salamanca’s industry authority. EQR said it continued work to address the non-compliance; the final regulator disposition was not established.

**Attribution:** Role overlaps event; causation unproven. This is the company’s account of the site issue; individual decisions and fault are not established, and the regulator notice was not independently inspected.

**Relevance:** Relevant environmental compliance and continuity context.

[September 2026 quarterly activities](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03154247-2A1706584>) (PDF page 3, final processing paragraph)

## Evidence gaps

- This is a partial public-source screen; independent credentials, exact role and employer tenure, and person-specific prior-employer outcomes remain incompletely verified.

- Separate person-specific searches for all required subject topics and targeted court/regulator checks remain incomplete.

- The detailed source and search record is not a criminal, sanctions, regulatory or professional-credential clearance.

- The exact start date and continuation of the stated role at 31 October 2026 are not independently established.
