# Raleigh Finlayson

Executive Chair

## Career chronology

- **Managing director prior to January 2026; executive chair from 29 January 2026: Genesis Minerals** — Executive Chair; previously Managing Director. [Leadership restructure](<https://announcements.asx.com.au/asxpdf/20260129/pdf/06vphcjdvvj6sn.pdf>) (Page 1 leadership restructure)

- **Managing director April 2013 to February 2021; previously operations: Saracen Mineral Holdings** — Managing Director and previously Chief Operating Officer. [Annual Report FY2026](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03123696-6A1339483>) (Page 14 board biography); [Northern Star Resources Annual Report 2022](<https://company-announcements.afr.com/asx/nst/f224ade7-2725-11ed-ad6a-8684da8a0e99.pdf>) (Directors report, outside directorship table)

## Education and qualifications

### Issuer-reported qualifications [gmd_finlayson_education]

FY2026 annual report · issuer reported · low materiality

Genesis lists the abbreviated qualifications AdMineSurvey, BSc (Mine &amp; Engineering), GradDipMinEng and GradCertAppFin. These qualifications were not independently verified.

**Attribution:** Responsibility not applicable. The issuer lists these qualifications; independent institutional confirmation was not obtained.

**Relevance:** Relevant to mining operations and executive leadership.

[Annual Report FY2026](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03123696-6A1339483>) (Printed page 14, Raleigh Finlayson biography)

## Contributions and company outcomes

### Genesis operating growth [fin_performance]

FY2025–FY2026 · issuer reported · medium materiality

Genesis reported FY2026 gold production of 285,402 ounces versus 214,311 in FY2025, with all-in sustaining costs of A$2,670/oz versus A$2,398/oz. These are company-wide outcomes, influenced by acquisitions and gold prices.

**Attribution:** Role overlaps event; causation unproven. Finlayson chaired or led the company; the contribution of individual executives is not separately measured.

**Relevance:** Shows operating growth and rising unit costs.

[Annual Report FY2026](<https://asx.api.markitdigital.com/asx-research/1.0/file/2924-03123696-6A1339483>) (Printed pages 10–11 shareholder letter)

## Industrial safety

### Fatality and later safety convictions at Saracen mine [fin_fatal]

2020; sentencing 2023 · documented · high materiality

In July 2020 a Byrnecut worker died at Saracen’s Whirling Dervish mine. WorkSafe reports that in December 2023 Northern Star (Carosue Dam) and Byrnecut pleaded guilty and were fined A$700,000 and A$850,000; a mine supervisor was separately fined. The separate 2020 Saracen announcement identifies Finlayson as managing director and reported the company response. The cited record does not establish personal wrongdoing by him.

**Attribution:** Role overlaps event; causation unproven. Finlayson was Saracen managing director in 2020; the cited convictions are against companies and the supervisor, not him.

**Relevance:** A material mine-safety outcome during executive oversight.

[Fatality at Dervish mine](<https://announcements.asx.com.au/asxpdf/20200714/pdf/44kj8vlnpmnf8d.pdf>) (Page 1: Saracen fatality announcement); [Safety prosecution updates May 2024](<https://safetyline.wa.gov.au/wp-content/uploads/241358_NL_ThinkSafe_May24.pdf>) (Safety prosecution updates, Whirling Dervish); [Companies and supervisor fined over mine worker death](<https://www.abc.net.au/news/2023-12-18/northern-star-byrnecut-australia-fined-over-death-of-mine-worker/103243318>) (Court report, paragraphs on guilty pleas and sentencing)

## Evidence gaps

- Independent university, professional membership and credential verification remains incomplete.

- Past-employer dates, individual contributions and a comprehensive search of courts and regulators remain incomplete.

- Personal causal responsibility for the 2020 fatality was not established; the regulator proceedings concern the companies and supervisor.
