# Josh Leftwich

Vice President, Operations &amp; Strategic Development, USA

## Career chronology

- **Current as of 2026-09-26; exact start date not supplied: Laramide Resources Ltd.** — Vice President, Operations &amp; Strategic Development, USA. [Annual Report 2025 / Annual Information Form](<https://financialfilings.com/filings/laramide-resources-ltd/annual-report/2026/37852548/>) (Directors’ report / current executive roster)

- **Earlier career; exact dates not fully disclosed: Previous employers and professional roles as summarized in issuer disclosure** — Cameco radiation safety/licensing; UEC regulatory work; Mesteña/Alta Mesa start-up and permitting responsibilities. [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

- **Earlier career; exact dates not disclosed: Cameco** — Director of Radiation Safety and Licensing; oversight of operational compliance, tribal relations and regulatory communications. [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 70; executive biography)

- **Five years before joining Laramide in August 2024: Texas Aggregates &amp; Concrete Association** — President and Chief Executive Officer. [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 70; executive biography); [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

- **Earlier career; dates not disclosed: Cameco Resources; Uranium Energy Corp.; Mestena Uranium** — Senior leadership roles. [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

## Contributions and company outcomes

### Company-level project and delivery record [lam_josh_leftwich_company_record]

Most recent report through cutoff · issuer reported · low materiality

Laramide advanced Churchrock-Crownpoint permitting to public notice in June 2026; project permitting progress is an issuer-reported milestone, not production or a completed permit.

**Attribution:** Role overlaps event; causation unproven. The individual held the stated role during some or all of the reported period; available evidence does not isolate personal contribution.

**Relevance:** Provides the company outcome against which the executive’s delivery record should be assessed.

[Annual Report 2025 / Annual Information Form](<https://financialfilings.com/filings/laramide-resources-ltd/annual-report/2026/37852548/>) (directors’ report / operating update)

## Litigation and enforcement

### New Mexico AG petition challenges NuFuels license-renewal application [lam_josh_leftwich_legal_context]

2026-07 · documented · high materiality

Leftwich is a public-facing VP who spoke at a NuFuels community meeting on August 6, 2026. New Mexico filed a hearing request on NuFuels’ renewal and challenged the groundwater-restoration showing; the NRC assigned an Atomic Safety and Licensing Board. The NRC’s official calendar showed the contested oral argument rescheduled from September 8 to October 5, 2026; no subsequent Board ruling was located by the October 9 cutoff. A separate NRC mandatory hearing concerning the renewal was also scheduled in September. Navajo EPA reiterated opposition to the never-built project in September 2026. Local reporting documents Leftwich’s exchange with attendees and attributed statements, but this is community engagement/pending-process evidence, not misconduct or an adjudicated violation. His public-facing role overlaps the license process; the reviewed record does not show he authored any challenged submission or establish personal responsibility.

**Attribution:** Individual involvement documented. Marc Henderson is CEO and Josh Leftwich leads US operations during the application; their roles overlap the review but the record does not show they authored deficient submissions or bear personal responsibility.

**Relevance:** Groundwater permitting and community impacts are directly relevant to uranium development.

[Crownpoint Uranium Project – License Renewal Status](<https://www.nrc.gov/materials/uranium-recovery/license-apps/crownpoint>) (NRC license-renewal status page; accepted for technical review and application status); [Anti-uranium advocates wrest control of public hearing on proposed mine near Navajo Nation](<https://sourcenm.com/2026/08/10/anti-uranium-advocates-wrest-control-of-public-hearing-on-proposed-mine-near-navajo-nation/>) (Aug. 10 report, lines 34–66; direct account and attributed statements); [Attorney General Raúl Torrez Files Petition to Intervene in Crownpoint Licensing Matter to Protect New Mexico’s Groundwater](<https://nmdoj.gov/press-release/attorney-general-raul-torrez-files-petition-to-intervene-in-crownpoint-licensing-matter-to-protect-new-mexicos-groundwater/>) (Aug. 6 release, lines 115–126; contentions summarized by petitioner); [NuFuels, Inc.; Establishment of Atomic Safety and Licensing Board](<https://www.govinfo.gov/content/pkg/FR-2026-08-06/pdf/2026-15962.pdf>) (Federal Register, Aug. 6, 2026); [ASLBP 2026 Proceedings – NuFuels](<https://www.nrc.gov/documents-reports/document-collections/aslbp/proceedings/2026>) (official calendar; oral argument status as listed by cutoff); [NuFuels Crownpoint license renewal oral argument meeting notice](<https://www.nrc.gov/public-meetings-hearings/public-meeting-schedule/20260733>) (Official calendar; Oct. 5 rescheduled argument and linked memorandum accession); [Navajo EPA opposes Church Rock uranium project as New Mexico challenges license renewal](<https://navajotimes.com/reznews/navajo-epa-opposes-church-rock-uranium-project-as-new-mexico-challenges-license-renewal/>) (Sept. 17, 2026; Navajo EPA opposition and project/license status); [NuFuels, Inc.; Establishment of Atomic Safety and Licensing Board](<https://www.govinfo.gov/content/pkg/FR-2026-08-06/pdf/2026-15962.pdf>) (Federal Register, 6 Aug. 2026; board establishment and September mandatory-hearing notice)

## Suitability for the current role

### Professional fit for Vice President, Operations &amp; Strategic Development, USA [lam_josh_leftwich_role_fit]

Current role as of cutoff · analyst inference · medium materiality

Role fit is an analytical inference from the documented position and the listed experience. The current role aligns with the function stated in the title; demonstrated personal outcomes are not inferred from employer results.

**Attribution:** Responsibility not applicable. Analyst assessment based on the cited role and career record; it does not establish performance causation.

**Relevance:** Assesses documented capability against the current role and company stage.

[Annual Report 2025 / Annual Information Form](<https://financialfilings.com/filings/laramide-resources-ltd/annual-report/2026/37852548/>) (Current executive roster); [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

## Evidence gaps

- No NRC Atomic Safety and Licensing Board post-argument ruling on intervention or the challenged license-renewal contentions was located by 2026-10-09; the official meeting calendar gave the October 5 schedule but not an outcome.
