# Marc Henderson

President / Chief Executive Officer / Director

## Career chronology

- **Since May 1995: Laramide Resources Ltd.** — President / Chief Executive Officer / Director. [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 67; director/officer appointment table)

- **Earlier career; exact dates not fully disclosed: Previous employers and professional roles as summarized in issuer disclosure** — CEO since 1995; former CEO/President of Aquiline Resources (sold to Pan American Silver in 2009) and former President of MineFinders. [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

- **1998–2009; company sold to Pan American Silver in 2009: Aquiline Resources Inc.** — President and Chief Executive Officer. [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 67; director biography)

- **2010–2021; interim CEO May 2017–November 2019: Cypherpunk Holdings Inc. (formerly Khan Resources Inc.)** — Interim Chief Executive Officer (2017–2019); director (2010–2021). [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 67; director biography)

- **August 2007–June 2022: Treasury Metals Inc. (now NexGold Mining Corp.)** — Chair (2007–2020); director (2007–2022). [Annual Information Form 2025](<https://company-announcements.afr.com/asx/lam/51d05f10-61e3-11f0-a321-6ea984ec502e.pdf>) (PDF p. 67; director biography)

## Education and qualifications

### Education and professional credentials [lam_marc_henderson_education]

Not dated · issuer reported · low materiality

CFA; economics degree, University of Colorado. Credentials are reported in the cited issuer or secondary biography; the issuing institutions were not independently queried in this pass.

**Attribution:** Individual involvement documented. The cited biography names the qualification; independent verification of award records was not available.

**Relevance:** Relevant professional preparation for the current position.

[Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

## Contributions and company outcomes

### Company-level project and delivery record [lam_marc_henderson_company_record]

Most recent report through cutoff · issuer reported · low materiality

Laramide advanced Churchrock-Crownpoint permitting to public notice in June 2026; project permitting progress is an issuer-reported milestone, not production or a completed permit.

**Attribution:** Role overlaps event; causation unproven. The individual held the stated role during some or all of the reported period; available evidence does not isolate personal contribution.

**Relevance:** Provides the company outcome against which the executive’s delivery record should be assessed.

[Annual Report 2025 / Annual Information Form](<https://financialfilings.com/filings/laramide-resources-ltd/annual-report/2026/37852548/>) (directors’ report / operating update)

## Litigation and enforcement

### New Mexico AG petition challenges NuFuels license-renewal application [lam_marc_henderson_legal_context]

2026-07 · documented · high materiality

The NRC has accepted NuFuels’ renewal application for technical review; that does not constitute a decision to renew the license. New Mexico filed a hearing request on July 27, 2026, and the NRC established an Atomic Safety and Licensing Board on August 6. The state’s petition challenges groundwater restoration, financial assurance, permit compliance, and reliance on an environmental-justice analysis more than 25 years old. The NRC’s official calendar showed the contested oral argument rescheduled from September 8 to October 5, 2026; no subsequent Board ruling was located by the October 9 cutoff. A separate NRC mandatory hearing concerning the renewal also formed part of the procedural calendar. The Navajo EPA publicly reiterated opposition to the never-built project in September 2026. These are unresolved licensing and stakeholder issues, not findings of wrongdoing by Henderson. His role overlaps the company’s filing, but no evidence establishes personal responsibility for the petition’s claims.

**Attribution:** Employer context; no individual link established. Marc Henderson is CEO and Josh Leftwich leads US operations during the application; their roles overlap the review but the record does not show they authored deficient submissions or bear personal responsibility.

**Relevance:** Groundwater permitting and community impacts are directly relevant to uranium development.

[Crownpoint Uranium Project – License Renewal Status](<https://www.nrc.gov/materials/uranium-recovery/license-apps/crownpoint>) (NRC license-renewal status page; accepted for technical review and application status); [Attorney General Raúl Torrez Files Petition to Intervene in Crownpoint Licensing Matter to Protect New Mexico’s Groundwater](<https://nmdoj.gov/press-release/attorney-general-raul-torrez-files-petition-to-intervene-in-crownpoint-licensing-matter-to-protect-new-mexicos-groundwater/>) (release dated Aug. 6, 2026, lines 115–126; summary of filed petition); [NuFuels, Inc.; Establishment of Atomic Safety and Licensing Board](<https://www.govinfo.gov/content/pkg/FR-2026-08-06/pdf/2026-15962.pdf>) (Federal Register notice; hearing request and board establishment); [ASLBP 2026 Proceedings – NuFuels](<https://www.nrc.gov/documents-reports/document-collections/aslbp/proceedings/2026>) (ASLBP proceedings calendar; Oct. 5 oral argument listing); [NuFuels Crownpoint license renewal oral argument meeting notice](<https://www.nrc.gov/public-meetings-hearings/public-meeting-schedule/20260733>) (Official calendar; Oct. 5 rescheduled argument and linked memorandum accession); [Navajo EPA opposes Church Rock uranium project as New Mexico challenges license renewal](<https://navajotimes.com/reznews/navajo-epa-opposes-church-rock-uranium-project-as-new-mexico-challenges-license-renewal/>) (Sept. 17, 2026; Navajo EPA opposition and project/license status); [NuFuels, Inc.; Establishment of Atomic Safety and Licensing Board](<https://www.govinfo.gov/content/pkg/FR-2026-08-06/pdf/2026-15962.pdf>) (Federal Register, 6 Aug. 2026; board establishment and September mandatory-hearing notice)

## Suitability for the current role

### Professional fit for President / Chief Executive Officer / Director [lam_marc_henderson_role_fit]

Current role as of cutoff · analyst inference · medium materiality

Role fit is an analytical inference from the documented position and the listed experience. The current role aligns with the function stated in the title; demonstrated personal outcomes are not inferred from employer results.

**Attribution:** Responsibility not applicable. Analyst assessment based on the cited role and career record; it does not establish performance causation.

**Relevance:** Assesses documented capability against the current role and company stage.

[Annual Report 2025 / Annual Information Form](<https://financialfilings.com/filings/laramide-resources-ltd/annual-report/2026/37852548/>) (Current executive roster); [Management Team](<https://laramide.com/about/management-team/>) (Management Team biography)

## Evidence gaps

- No NRC Atomic Safety and Licensing Board post-argument ruling on intervention or the challenged license-renewal contentions was located by 2026-10-09; the official meeting calendar gave the October 5 schedule but not an outcome.
