# Marcelo de Carvalho

Executive Director / Chief Geologist

## Career chronology

- **Since 2021-07-20: Meteoric Resources Limited** — Executive Director / Chief Geologist. [Half Yearly Report and Accounts, 30 June 2026](<https://financialfilings.com/filings/meteoric-resources-nl/interim-quarterly-report/2026/59425332/>) (Directors’ report / current executive roster)

- **Earlier career; exact dates not fully disclosed: Previous employers and professional roles as summarized in issuer disclosure** — exploration geologist at AngloGold and Vale; Greenfields Exploration Manager at Yamana Gold; founded Target Latin America consultancy. [Leadership Team](<https://meteoric.com.au/our-leadership/?lang=pt-pt>) (leadership biography)

- **Early career; before joining Yamana Gold: AngloGold Ashanti; Vale** — Exploration geologist, gold and base metals exploration in Brazil. [Brazilian at company leadership](<https://revistaminerios.com.br/brasileiro-na-direcao-da-empresa/>) (career profile)

- **Joined after PhD in 2004; left in 2012: Yamana Gold** — Greenfields Exploration Manager. [Brazilian at company leadership](<https://revistaminerios.com.br/brasileiro-na-direcao-da-empresa/>) (career profile)

- **After leaving Yamana in 2012; exact start date not confirmed: Target Latin America** — Co-founder / exploration consultant. [Brazilian at company leadership](<https://revistaminerios.com.br/brasileiro-na-direcao-da-empresa/>) (career profile)

- **Director appointed 20 July 2021; current as of cutoff: Meteoric Resources NL** — Executive Director and Chief Geologist. [Annual Report 2025](<https://financialfilings.com/filings/meteoric-resources-nl/annual-report/2025/37905877/>) (director biography and appointment date)

## Education and qualifications

### Education and professional credentials [mei_marcelo_de_carvalho_education]

Not dated · issuer reported · low materiality

BGeology, State University of São Paulo; PhD metallogenesis, UWA. Credentials are reported in the cited issuer or secondary biography; the issuing institutions were not independently queried in this pass.

**Attribution:** Individual involvement documented. The cited biography names the qualification; independent verification of award records was not available.

**Relevance:** Relevant professional preparation for the current position.

[Leadership Team](<https://meteoric.com.au/our-leadership/?lang=pt-pt>) (leadership biography)

## Contributions and company outcomes

### Company-level project and delivery record [mei_marcelo_de_carvalho_company_record]

Most recent report through cutoff · issuer reported · medium materiality

Meteoric’s 2026 half-year report documents Caldeira project advancement, and the issuer announced a proposed Lynas scheme on 1 October 2026. The scheme remains conditional; no completed acquisition is counted as delivery.

**Attribution:** Role overlaps event; causation unproven. The individual held the stated role during some or all of the reported period; available evidence does not isolate personal contribution.

**Relevance:** Provides the company outcome against which the executive’s delivery record should be assessed.

[Half Yearly Report and Accounts, 30 June 2026](<https://financialfilings.com/filings/meteoric-resources-nl/interim-quarterly-report/2026/59425332/>) (operations / Caldeira project progress)

## Environmental record

### Caldeira licensing challenged; MPF inquiry and suspension requests unresolved [mei_marcelo_de_carvalho_environment_context]

2026-06 · documented · high materiality

The Caldeira project is subject to unresolved environmental and radiological licensing challenges. In December 2025 the Federal Public Prosecutor’s Office (MPF) opened a civil inquiry into possible irregularities in processing state licensing case 00911/2024; that is an inquiry, not a finding of wrongdoing. The state granted a Preliminary Licence (LP) in December 2025, but a separate Installation Licence (LI) is still required. In June 2026 a federal-court proceeding required an ANSN technical opinion before licensing could advance, according to local reporting. On 10 September 2026, local reporting said civil-society organizations had filed a civil public action questioning Caldeira and another project; the MPF, as legal watchdog rather than plaintiff, supported suspension pending a conclusive ANSN opinion. The article did not report a court order suspending the Caldeira process. Meteoric responded that ANSN had issued a final report in late August classifying its pilot facility as exempt from radiological control and said the MPF opinion was not a judgment. On 17 September, a local alliance separately asked MPF/FEAM to suspend the installation-license process until cumulative-impact and water studies were completed; Meteoric replied that it considered its technical, environmental and social studies robust and remained open to dialogue. As of the 9 October 2026 cutoff, no final court disposition, suspension order, or final LI award was identified. These are project- and company-level proceedings and stakeholder objections, not findings of misconduct by any named executive; the reviewed record does not establish individual responsibility.

**Attribution:** Role overlaps event; causation unproven. The executive team oversees Caldeira, but the order addresses project review and does not establish personal responsibility or misconduct.

**Relevance:** Radiological permitting is central to the flagship rare-earth project.

[Federal court orders further radiological review for Caldeira](<https://www.broadcast.com.br/agencia-minera/justica-analise-radioatividade-projetos-terras-raras/>) (lead paragraph); [Half Yearly Report and Accounts, 30 June 2026](<https://financialfilings.com/filings/meteoric-resources-nl/interim-quarterly-report/2026/59425332/>) (operations and compliance sections); [Caldeira Project Licensing Update](<https://www.marketindex.com.au/asx/mei/announcements/caldeira-project-licensing-update-6A1329936>) (issuer update on court-directed ANSN review); [Lynas Takeover Offer](<https://meteoric.com.au/lynas-takeover-offer/>) (scheme timeline and outstanding approvals); [Portaria 107/2025 opens civil inquiry into environmental licensing process](<https://transparencia.mpf.mp.br/conteudo/diarios-e-boletins/diario-eletronico-dmpf-e/2025/DMPF-EXTRAJUDICIAL-2025-12-19.pdf>) (Portaria 107/2025, p. 12; inquiry scope and target licensing case); [Environmental licensing case 00911/2024 – Preliminary License](<https://sistemas.meioambiente.mg.gov.br/licenciamento/site/view-externo?id=45157>) (FEAM licensing registry; LP granted 20 Dec 2025; LI is separate); [Civil Public Action questions rare-earth licensing; MPF seeks suspension pending ANSN opinion](<https://pocosja.com.br/noticia/cidade/2026/09/10/acao-civil-publica-questiona-licenciamento-de-terras-raras-em-pocos-e-regiao/>) (paras. 88–100, 122–133; MPF position, procedural status, company response and ANSN claim); [Community alliance asks MPF and FEAM to suspend installation-license processes](<https://pocosja.com.br/noticia/meio-ambiente/2026/09/19/alianca-pela-pedra-branca-aciona-mpf-e-feam-para-suspender-licenciamentos-de-terras-raras-na-regiao/>) (paras. 90–110 and 132–135; community requests, study issues and company response); [Caldeira Project Licensing Update](<https://www.marketindex.com.au/asx/mei/announcements/caldeira-project-licensing-update-6A1329936>) (18 June issuer licensing update; LI timetable)

## Suitability for the current role

### Professional fit for Executive Director / Chief Geologist [mei_marcelo_de_carvalho_role_fit]

Current role as of cutoff · analyst inference · medium materiality

Role fit is an analytical inference from the documented position and the listed experience. The current role aligns with the function stated in the title; demonstrated personal outcomes are not inferred from employer results.

**Attribution:** Responsibility not applicable. Analyst assessment based on the cited role and career record; it does not establish performance causation.

**Relevance:** Assesses documented capability against the current role and company stage.

[Half Yearly Report and Accounts, 30 June 2026](<https://financialfilings.com/filings/meteoric-resources-nl/interim-quarterly-report/2026/59425332/>) (Current executive roster); [Leadership Team](<https://meteoric.com.au/our-leadership/?lang=pt-pt>) (leadership biography); [Half Yearly Report and Accounts, 30 June 2026](<https://financialfilings.com/filings/meteoric-resources-nl/interim-quarterly-report/2026/59425332/>) (Directors’ report / current executive roster); [Brazilian at company leadership](<https://revistaminerios.com.br/brasileiro-na-direcao-da-empresa/>) (career profile); [Annual Report 2025](<https://financialfilings.com/filings/meteoric-resources-nl/annual-report/2025/37905877/>) (director biography and appointment date)

## Evidence gaps

- The Brazilian nuclear authority’s final technical opinion following the June 2026 court-ordered review was not located by the cutoff.
