# Tony Green

Chief Operating Officer

## Career chronology

- **From 2018-11-01: Nickel Industries** — Chief Operating Officer. [2025 Annual Report](<https://announcements.asx.com.au/asxpdf/20260424/pdf/06ytpyf3cfjq10.pdf>) (management biography and governance)

## Personal achievements

### Reported career and role [tony-green_background]

Career and current role · issuer reported · low materiality

The issuer reports that Green has led Hengjaya operations and previously held mining management roles in Guinea and Queensland; prior-employer dates remain unverified.

**Attribution:** Individual involvement documented. The issuer describes the role and background; independent verification is limited.

**Relevance:** Relevant to the person’s present remit.

[2025 Annual Report](<https://announcements.asx.com.au/asxpdf/20260424/pdf/06ytpyf3cfjq10.pdf>) (pp. 15–18 director and management biographies); [Board and Management](<https://nickelindustries.com/about-us/board-management/>) (Tony Green profile); [Nickel Industries and UPN Yogyakarta welcome scholarship recipients](<https://en.antaranews.com/amp/news/434589/nickel-industries-upn-yogyakarta-welcome-2026-scholarship-recipients>) (8 October 2026 scholarship report)

## Industrial safety

### ENC contractor fatality and mine suspension [tony-green_fatal]

March–April 2026 · issuer reported · high materiality

A contractor engaged by Fajar Metal Industry died during ENC transmission-line construction on the Hengjaya haul road in March 2026. Nickel said the energy ministry investigation had concluded and mining resumed on 9 April; the authority’s detailed findings were not obtained. ENC was equity accounted and excluded from the controlled-entity lost-time injury rate, so a zero rate did not encompass this death.

**Attribution:** Role overlaps event; causation unproven. Management oversight and an incident during tenure do not establish personal fault or control of the third-party contractor.

**Relevance:** Relevant to operational and contractor safety oversight.

[Fatality during construction activities](<https://announcements.asx.com.au/asxpdf/20260325/pdf/06xsrcjlm9nbl2.pdf>) (p. 1); [Hengjaya mine operations recommenced](<https://announcements.asx.com.au/asxpdf/20260409/pdf/06y9brrq8h7dbs.pdf>) (p. 1); [March 2026 quarterly activities report](<https://links.sgx.com/FileOpen/Quarterly%20Activities%20Report.ashx?App=Announcement&FileID=886562>) (p. 3 safety and footnote 2)

## Evidence gaps

- Independent confirmation of credentials and complete employment dates remains incomplete.

- Targeted open-web searches are limited; original court, regulator, prior-employer and Indonesian-language records were not exhaustively obtained.

- The issuer leadership page is undated; exact role continuity at the evidence cutoff is not independently confirmed.

- The ESDM investigation’s original detailed report and responsibility findings were not obtained.