OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor BHM ASX

Broken Hill Mines Limited

Producer · Silver · Lead · Zinc · Australia Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.415
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$164.4M
EV
A$157.2M
Cash
A$33.7M
Debt
A$26.4M
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

2 assets

Core asset

Rasp Mine

Australia

Producer100% ownedSilverLeadZincCopperGold

Operating underground silver-lead-zinc mine and 750,000 tpa design-capacity plant; Western Mineralisation, Main Lode and initial Pinnacles feed were online by June 2026.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured1.2M tonnes6.3% Zn, 3.9% Pb, 59.8 g/t AgZinc · Lead · Silver2024-02-29
Mineral ResourceIndicated2.6M tonnes5.0% Zn, 3.9% Pb, 58.3 g/t AgZinc · Lead · Silver2024-02-29
Mineral ResourceInferred6.3M tonnes5.8% Zn, 2.7% Pb, 42.3 g/t AgZinc · Lead · Silver2024-02-29
Tenements7
ten.rasp.cml7Granted— None · 2047-12-31
ten.rasp.ml1249Granted— None · 2036-01-06
ten.rasp.mpl183Granted— None · 2047-12-31
ten.rasp.mpl184Granted— None · 2047-12-31
ten.rasp.mpl185Granted— None · 2047-12-31
ten.rasp.mpl186Granted— None · 2047-12-31
ten.rasp.el5818Granted— None · 2029-03-08
Milestones2
  1. Commission Tailings Dewatering Plant

    Pending · High materiality

  2. Release updated Rasp mineral resource

    Pending · High materiality

Material

Pinnacles Mine

Australia

Ramping ProducerSilverLeadZincGoldCopper

BHM is exclusive operator and receives approximately 70% of operating net smelter returns; it does not own the tenements. Edwards open-pit mining restarted and first ore reached Rasp by June 2026.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured168K tonnes4.2% Zn, 2.4% Pb, 89 g/t Ag, 0.24 g/t AuZinc · Lead · Silver · Gold2024-06-30
Mineral ResourceIndicated847K tonnes4.7% Zn, 2.7% Pb, 102 g/t Ag, 0.37 g/t AuZinc · Lead · Silver · Gold2024-06-30
Mineral ResourceInferred5M tonnes4.7% Zn, 3.5% Pb, 139 g/t Ag, 0.53 g/t AuZinc · Lead · Silver · Gold2024-06-30
Tenements6
ten.pinnacles.ml870Granted— None · 2040-06-20
ten.pinnacles.ml4436Granted— None · 2040-06-20
ten.pinnacles.ml5627Granted— None · 2040-06-20
ten.pinnacles.ml5835Granted— None · 2040-06-20
ten.pinnacles.ml5836Granted— None · 2040-06-20
ten.pinnacles.ml5849Granted— None · 2040-06-20
Milestones1
  1. Release updated Pinnacles mineral resource

    Pending · High materiality