OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor CBE ASX

Cobre Limited

Ramping Producer · Copper · CL · BW · AU Rating locked: sign in to view v8.1 · cbe-20261104t223127-full
Last 2026-11-06
A$0.225
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$292.9M
EV
A$225.6M
Cash
A$67.3M
Debt
A$0

Portfolio detail

Assets

5 assets

Core asset

Sierra Atacama copper project (SX-EW plant, underground mine, Antofagasta Chile)

CL

Ramping Producer62.86% ownedCopper

Operating under Cobre control from 12 Oct 2026 (62.86%); staged expansion targets; foreign resource not JORC

Producer · Ramping producer
Production annualised (attributable)
2.1k td
Production (last FY, 100%)
—
AISC (latest quarter)
—
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
—
Head grade
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured+Indicated+Inferred, foreign NI 43-101 (not JORC)109.6 Mt0.67% CuTCopper2025-08-15
Ore ReserveProven and probable ore, foreign NI 43-101 (not JORC)43.3 Mt0.67% CuTCopper2025-08-15
Tenements1
sa-concessionsGranted— None · No expiry supplied
Milestones3
  1. Stage 1 SX refurbishment and EW recommissioning tender award (c18 ktpa target)

    Pending · High materiality

  2. Maiden JORC-compliant mineral resource from the 40,000 m drilling program

    Pending · High materiality

  3. Ramp to 700 t/month cathode (company target, not guidance)

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Declaracion de Impacto Ambiental (DIA) for expanded operation (Stage 2)ChileRequired—Yes

Material

Ngami copper project (Comet deposit, ISCR demonstration, Kalahari Copper Belt, Botswana)

BW

Resource Stage100% ownedCopperSilver

JORC maiden resource at Comet; ISCR well-field completed; EIA for demonstration SX-EW plant in progress; no compliant study

Resource / scoping · Resource stage
Contained metal (attributable)
60.3k td
Resource grade
52.0%
% Measured + Indicated
960.0%d
Resource tonnes
11.50 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceTotal (Indicated 1.1 Mt + Inferred 10.4 Mt), JORC 2012, 0.2% Cu cut-off11.5 Mt0.52% Cu, 11.6 g/t AgCopper · Silver2025-06-11
Tenements1
ngami-plGranted— None · 2028-06-30
Milestones1
  1. Complete hydrogeological test work at Ngami ISCR well-field

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
EIA approval for construction of the ISCR SX-EW demonstration plantBotswanaPending—Yes
Economic studies1
StudyStageStatusDateSummary
Ngami scoping study (retracted 25 Oct 2024)Scoping StudySuperseded2024-10-17Retracted at ASX request: production targets and forecast financial information were based on exploration targets. Not used for valuation.

Other

Okavango copper project (joint venture with Sinomine, Botswana)

BW

Early ExplorerCopper

Partner-funded target drilling; Cobre share not stated as a percentage in documents read

Exploration · Early explorer
Ownership
—
Commodity
Cur
Country
BWr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Milestones1
  1. Complete target drilling (about 1.6 km of ~3 km completed)

    Pending · Low materiality

Other

Kitlanya East and West (BHP earn-in, Kalahari Copper Belt, Botswana)

BW

Early Explorer100% ownedCopper

BHP can earn 75% of Kitlanya Pty Ltd by spending up to US$25m; earn-in amounts received are a A$7.14m liability

Exploration · Early explorer
Ownership
10,000.0%
Commodity
Cur
Country
BWr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
kitl-plGranted2,354.4 km2 · 2028-06-30

Other

Perrinvale (Australia, exploration licences held by Toucan Gold)

AU

Early Explorer100% ownedOthers

No substantive work in FY26 or the September quarter

Exploration · Early explorer
Ownership
10,000.0%
Commodity
—
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—
Tenements2
pv-e29-938Granted13 blocks · 2027-07-07
pv-e29-986Granted12 blocks · 2027-10-10

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)