OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor EL8 ASX

Elevate Uranium Ltd

Resource Stage · Uranium · Namibia · Australia Rating locked: sign in to view v8 · el8-20261009t155722-first-fill
Last 2026-11-06
A$0.22
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$103.6M
EV
A$75.9M
Cash
A$28.8M
Debt
A$0
7 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

10 assets

Core asset

Koppies Uranium Project

Namibia

Resource Stage100% ownedUranium

Pre-development resource-stage project comprising Koppies, Hirabeb and Namib IV; renewal applications for key EPLs were pending at 30 June 2026.

Resource / scoping · Resource stage
Contained metal (attributable)
76.2m lbd
Resource grade
186 ppm U3O8
% Measured + Indicated
57.2%d
Resource tonnes
186.20 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated98 Mt200 ppm U3O8 at 100 ppm cut-offUranium2026-06-30
Mineral ResourceInferred35.4 Mt160 ppm U3O8 at 100 ppm cut-offUranium2026-06-30
Mineral ResourceInferred23.3 Mt200 ppm U3O8 at 100 ppm cut-offUranium2026-06-30
Mineral ResourceInferred29.5 Mt155 ppm U3O8 at 100 ppm cut-offUranium2026-04-15
Tenements4
epl-6987Renewal Pending— None · 2026-04-08
epl-7278Renewal Pending— None · 2026-06-08
epl-7279Renewal Pending— None · 2026-06-08
epl-7662Granted— None · 2027-11-27
Milestones2
  1. Commence technical studies after pilot-plant data are available

    Pending · High materiality

  2. Test Koppies ore through the U-pgrade Pilot Plant

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Koppies-area EPL renewalsNamibiaPending—Yes

Core asset

Marenica Uranium Project

Namibia

Scoping Study Developer85% ownedUranium

Current ownership remains 85% as confirmed in the 25 September annual report; final 5% acquisition is conditional with extended 30 September 2026 close. Resource figures are on a 100% project basis, while the company headline 181 Mlb portfolio total uses prospective 90% Marenica ownership.

Resource / scoping · Scoping study developer
Contained metal (attributable)
44.9m lbd
Resource grade
180 ppm U3O8
% Measured + Indicated
14.2%d
Resource tonnes
134.50 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics

No numeric study economics were published.

Bench-scale U-pgrade testing indicated about 98% mass rejection and potential approximately 50% capex and opex reduction, but no current study-level economics were disclosed.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated16.8 Mt205 ppm U3O8 at 100 ppm cut-offUranium2026-06-10
Mineral ResourceInferred117.7 Mt175 ppm U3O8 at 100 ppm cut-offUranium2026-06-10
Tenements1
mdrl-3287Granted— None · 2027-10-02
Milestones4
  1. Release U-pgrade pilot plant results

    Achieved · High materiality

  2. Complete acquisition of remaining 5% to reach 90% ownership

    Pending · Medium materiality

  3. Achieve integrated steady-state operation and optimise all five U-pgrade stages

    Pending · High materiality

  4. Commence Marenica Scoping Study

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Future project development and mining approvalsNamibiaRequired—Yes
Economic studies1
StudyStageStatusDateSummary
2017 Marenica Scoping StudyScoping StudySuperseded2017-04-18Historical scoping study predates the current JORC 2012 resource and the pilot-scale validation program; it is not used as current NAV evidence.

Material

Angela Uranium Project

Australia

Resource Stage100% ownedUranium

High-grade Northern Territory resource with exploration below the known lens; no current economic study or reserve.

Resource / scoping · Resource stage
Contained metal (attributable)
30.8m lbd
Resource grade
1,310 ppm U3O8
% Measured + Indicated
0%d
Resource tonnes
10.70 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Site imagery

Sentinel-2 · 10 m
Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred10.7 Mt1,310 ppm U3O8 at 300 ppm cut-offUranium2026-06-30
Tenements1
el-25758Granted— None · 2026-10-02
Milestones1
  1. Assess deep-hole results and define follow-up drilling

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
EL 25758 renewal or extensionNorthern Territory, AustraliaRequired2026-10-02Yes

Material

Napperby Uranium Project

Australia

Resource Stage100% ownedUranium

Shallow Northern Territory resource acquired in December 2025; prior testwork indicated U-pgrade amenability and a 1% net smelter royalty applies.

Resource / scoping · Resource stage
Contained metal (attributable)
8.0m lbd
Resource grade
382 ppm U3O8
% Measured + Indicated
0%d
Resource tonnes
9.50 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred9.5 Mt382 ppm U3O8 at 200 ppm cut-offUranium2025-12-23
Tenements1
el-31449Granted— None · 2027-09-06
Milestones1
  1. Design infill drilling across the wider mineralised envelope

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Future development approvalsNorthern Territory, AustraliaRequired—No

Material

Thatcher Soak Uranium Project

Australia

Resource Stage100% ownedUranium

Western Australian resource-stage project; no current development study or reserve is disclosed.

Resource / scoping · Resource stage
Contained metal (attributable)
10.9m lbd
Resource grade
425 ppm U3O8
% Measured + Indicated
0%d
Resource tonnes
11.60 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred11.6 Mt425 ppm U3O8 at 150 ppm cut-offUranium2026-06-30
Tenements1
r-38-1Granted— None · 2028-12-03
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Future uranium development approvalsWestern AustraliaRequired—Yes

Material

Bigrlyi Uranium Joint Venture

Australia

Resource Stage20.82% ownedUraniumOthers

Energy Metals-operated Ngalia Basin joint venture; the latest resource contains measured, indicated and inferred material and potential vanadium by-product value.

Resource / scoping · Resource stage
Contained metal (attributable)
5.0m lbd
Resource grade
1,370 ppm U3O8
% Measured + Indicated
69.5%d
Resource tonnes
7.90 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Site imagery

Sentinel-2 · 10 m
Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured1.7 Mt1,300 ppm U3O8 at 500 ppm cut-offUranium · Others2025-02-25
Mineral ResourceIndicated3.8 Mt1,410 ppm U3O8 at 500 ppm cut-offUranium · Others2025-02-25
Mineral ResourceInferred2.5 Mt1,340 ppm U3O8 at 500 ppm cut-offUranium · Others2025-02-25
Tenements1
elr-32552Granted— None · 2030-11-15
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Future development approvalsNorthern Territory, AustraliaRequired—No

Material

Attributable Ngalia JV resource basket

Australia

Resource Stage100% ownedUranium

Portfolio of Walbiri, Sundberg, Hill One, Karins and Malawiri resources with differing interests of approximately 20.82% to 23.97%; valued conservatively as a portfolio rather than as one ownership percentage. For valuation only, 100% refers to the already-attributable 2.35 Mlb basket; underlying legal JV percentages differ by prospect.

Resource / scoping · Resource stage
Contained metal (attributable)
2.4m lbd
Resource grade
612 ppm U3O8d
% Measured + Indicated
0%d
Resource tonnes
1.75 Mtd
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred attributable portfolio— Noneapproximately 980 ppm U3O8 on the reported attributable aggregateUranium2026-06-30
Tenements3
elr-45Granted— None · 2029-07-17
elr-41Granted— None · 2029-07-17
elr-31319Granted— None · 2027-06-14

Material

Namibia Exploration Portfolio

Namibia

Discovery Drill Stage100% ownedUranium

Capri and surrounding Central Erongo and Koppies-area exploration licences and applications; no current JORC resource is disclosed outside projects separately recorded.

Exploration · Discovery drill stage
Ownership
100%r
Commodity
U3O8r
Country
NAr
Best recent intercept (grade x width)
—
Metres drilled (12M)
1,878 m
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements3
epl-7508Granted— None · 2027-03-01
epl-8098Application— None · No expiry supplied
epl-8791Application— None · No expiry supplied
Milestones1
  1. Define a maiden Capri resource when drilling density supports estimation

    Pending · Medium materiality

Material

Australian Exploration Portfolio

Australia

Discovery Drill Stage100% ownedUranium

Minerva, Fitton, Entia and adjacent wholly owned exploration tenements with high-grade historical intersections or targets but no current JORC resources separately disclosed.

Exploration · Discovery drill stage
Ownership
100%r
Commodity
U3O8r
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—
Tenements4
el-32400Granted— None · 2027-04-17
el-6574Granted— None · 2031-09-19
el-29347Granted— None · 2027-09-12
el-29389Granted— None · 2027-09-12
Milestones1
  1. Prioritise follow-up drilling at Minerva, Fitton and Entia

    Pending · Medium materiality

Other

Oobagooma Uranium Project

Australia

Early Explorer100% ownedUranium

Elevate remains legal owner while the conditional sale to Orpheus is incomplete; consideration includes cash, ORP shares and milestones, and access, heritage and Western Australian uranium-policy constraints are material.

Exploration · Early explorer
Ownership
100%r
Commodity
U3O8r
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
e-04-2297Granted271 km2 · 2027-02-20
Milestones1
  1. Satisfy conditions and complete sale to Orpheus

    Delayed · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Defence-land access and heritage agreementsWestern AustraliaRequired—Yes

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)