OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor MGX ASX

MGX Resources Limited (formerly Mount Gibson Iron Limited)

Resource Stage · Gold · Iron Ore · AU Rating locked: sign in to view v8.1 · mgx-20261104t223124-full
Last 2026-11-06
A$0.29
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$342.3M
EV
A$1.2M
Cash
A$332.2M
Debt
A$0

Portfolio detail

Assets

4 assets

Core asset

Central Tanami Project Joint Venture (50%, with Tanami Gold NL)

AU

Resource Stage50% ownedGold

Acquired from Northern Star for A$50m cash (completed 5 February 2026). Groundrush decline under construction; resource definition and metallurgy under way; development decision targeted within 12 months of 29 October 2026.

Resource / scoping · Resource stage
Contained metal (attributable)
1.4m ozd
Resource grade
2.80 g/t
% Measured + Indicated
51.3%d
Resource tonnes
31.00 Mt
Our value per attrib. contained unit
Locked
Mining method
open pit and underground

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcemeasured1.3M t0.8 g/t AuGold2026-06-30
Mineral Resourceindicated15M t2.8 g/t AuGold2026-06-30
Mineral Resourceinferred14M t3.1 g/t AuGold2026-06-30
Mineral Resourcetotal31M t2.8 g/t AuGold2026-06-30
Tenements2
ml22934Granted— None · No expiry supplied
ml33760Granted— None · No expiry supplied
Milestones2
  1. Groundrush exploration decline completion (3.5 km, about 14 months from September 2026)

    Pending · High materiality

  2. CTPJV development decision (company target within 12 months)

    Pending · High materiality

Material

Koolan Island iron ore operation (sale to Crestlink pending)

AU

Care And Maintenance100% ownedIron Ore

Mining ceased after the October 2025 Main Pit rockfall. Low-grade stockpile shipments finished in July 2026; rehabilitation largely complete; sale to Crestlink conditional (FIRB and ACCC approvals received), completion targeted late 2026 with longstop 31 March 2027.

Care and maintenance · Care and maintenance
Nameplate capacity
—
Restart capex
—
Contained metal (attributable)
3.3m td
Last production year
2026 (final low-grade shipments, July 2026)
Target restart
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated2.1M t59.9% FeIron Ore2026-06-30
Mineral Resourceinferred1.2M t58.2% FeIron Ore2026-06-30
Mineral Resourcetotal3.3M t59.3% FeIron Ore2026-06-30
Milestones1
  1. Crestlink settlement and transfer of rehabilitation obligations

    Pending · High materiality

Other

Central Tanami wholly owned regional exploration tenure

AU

Early Explorer100% ownedGold

About 3,600 sq km acquired with the CTPJV; regional geological model under review; no drilled resource.

Exploration · Early explorer
Ownership
100%
Commodity
Aur
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Other

Western Australia Mid-West and Edmund Basin exploration

AU

Early Explorer100% ownedGold

Early exploration; about 1,650 sq km in the Edmund Basin; a A$180k WA government Exploration Incentive Scheme commitment was received for one drilling location.

Exploration · Early explorer
Ownership
100%d
Commodity
Aur
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Stock database

Other assets

Plants, holdings and assets valued inside a project
AIC Mines Limited (minority holding) · Equity investment · Held
Investee
AIC Mines Limited
Holding
3.8%
Shares held
—
Market value
—
% of holder's market cap
—
Cost basis
—
Fenix Resources Limited (minority holding) · Equity investment · Held
Investee
Fenix Resources Limited
Holding
9.4%
Shares held
—
Market value
—
% of holder's market cap
—
Cost basis
—
Maronan Metals Limited (minority holding) · Equity investment · Held
Investee
Maronan Metals Limited
Holding
4.6%
Shares held
—
Market value
—
% of holder's market cap
—
Cost basis
—