Southern Palladium Limited

DFS Unfunded Developer · Platinum Group Metals · Others · South Africa Rating locked: sign in to view v6.2
Last 2026-11-06
A$1.6
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$211.7M
EV
A$187.8M
Cash
A$23.9M
Debt
A$0
4 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

1 assets

Core asset

Bengwenyama

South Africa

DFS Unfunded Developer70% ownedPlatinum Group MetalsOthersGoldCopperNickel

Mining right granted 7 August 2026; DFS due Q1 2027; water-use and waste-management approvals, construction finance and final investment decision remain outstanding.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVUS$857M8% discount
IRR26.4%Published return
Initial capexUS$219MPublished capital estimate

100% project after-tax OPFS, pre-DFS; peak funding US$279m.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred combined with 4E-only extension241.9 Mt4E 4.66 g/t for combined tonnes; 7E only partly assayedPlatinum Group Metals2024-10-23
Ore ReserveProbable31.7 Mt6E 6.17 g/tPlatinum Group Metals2024-10-28
Tenements1
eerstegeluk-nooitverwachtGranted5,280 ha · No expiry supplied
Milestones3
  1. 30-year mining right granted

    Achieved · High materiality

  2. Early box-cut and decline development subject to approvals

    Pending · High materiality

  3. Definitive feasibility study

    Pending · High materiality

Permits & approvals4
PermitJurisdictionStatusExpiryCritical path
Bengwenyama mining rightSouth AfricaGranted—Yes
Environmental authorisationSouth AfricaGranted—Yes
Water-use approval for early worksSouth AfricaPending—Yes
Waste-management approval for early worksSouth AfricaPending—Yes
Economic studies2
StudyStageStatusDateSummary
Optimised prefesibility studyPFSReaffirmed2025-07-10Staged 100 ktpa to 200 ktpa PGM output concept, 100% after-tax NPV8 US$857m and US$279m peak funding. August 2026 release reaffirmed material assumptions pending DFS.
Bengwenyama prefeasibility studyPFSSuperseded2024-10-28Earlier full-scale PFS superseded by staged OPFS.