OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TLG ASX

Talga Group Ltd

DFS Unfunded Developer · Graphite · Sweden Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.2
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$102.2M
EV
A$91M
Cash
A$18.7M
Debt
A$0
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

6 assets

Core asset

Vittangi Anode Project

Sweden

DFS Unfunded Developer100% ownedGraphite

Permitted integrated graphite mine and Lulea active-anode platform. Demonstration plant commercial deliveries have begun, but the staged 5,000 tpa plant remains pre-FID and the full project capital stack is incomplete.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Initial capex€560MPublished capital estimate
Initial capex€527.7MPublished capital estimate
Operating cost134EUR/t ore
Initial capex€1.1BPublished capital estimate
Operating cost119EUR/t ore

AACE Class 3 FEED capital excluding EUR39 million contingency; no refreshed NPV or IRR was disclosed.

Preliminary 0.6 Mtpa mining and processing case at plus or minus 50 percent accuracy, excluding contingency and owners costs.

Preliminary 2.0 Mtpa mining and processing case at plus or minus 50 percent accuracy, excluding contingency and owners costs.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated26.7M t ore24.3% graphitic carbonGraphite2025-06-30
Mineral ResourceInferred8.3M t ore22.1% graphitic carbonGraphite2025-06-30
Ore ReserveProbable2.3M t ore24.1% graphitic carbonGraphite2025-06-30
Tenements8
ten.nunasvaara4Granted1,057.06 ha · No expiry supplied
ten.nunasvaara3Granted64.79 ha · No expiry supplied
ten.vittangi2Granted1,713.73 ha · No expiry supplied
ten.vittangi6Granted1,145.01 ha · No expiry supplied
ten.concession.nunasvaara-sodraGranted37.92 ha · No expiry supplied
ten.concession.nunasvaara-norraGranted18.54 ha · No expiry supplied
ten.concession.niska-sodraGranted5.68 ha · No expiry supplied
ten.concession.niska-norraGranted9.5 ha · No expiry supplied
Milestones7
  1. Complete remaining stakeholder, IP and risk FEED work

    Pending · High materiality

  2. Target conditional Japanese offtake term sheets

    Pending · High materiality

  3. Target definitive Japanese offtake agreements

    Pending · High materiality

  4. Final investment decision after offtakes and capital stack

    Pending · High materiality

  5. Target start of commercial-scale plant construction

    Pending · High materiality

  6. Target EAS binding term sheet

    Pending · Medium materiality

  7. Target EAS definitive supply agreement

    Pending · High materiality

Permits & approvals4
PermitJurisdictionStatusExpiryCritical path
Nunasvaara South Environmental PermitSwedenGranted—No
Nunasvaara South Exploitation ConcessionSwedenGranted—No
Nunasvaara South Detailed PlanSwedenGranted—No
Lulea Anode Refinery Environmental PermitSwedenGranted—No
Economic studies3
StudyStageStatusDateSummary
Vittangi Anode Project Detailed Feasibility StudyDFSReaffirmed2021-07-01Initial integrated 19,500 tpa design; later issuer documents state material production assumptions continue to apply, subject to the 2024 FEED capex update.
Vittangi Anode Project FEED StudyFeedCurrent2024-04-15AACE Class 3 design for 19,500 tpa with EUR560 million capital excluding EUR39 million contingency.
Vittangi Expansion Interim Scoping StudyScoping StudyCurrent2024-06-11Preliminary underground expansion mining study at plus or minus 50 percent accuracy; downstream integration and further study remain required.

Other

Aero Project

Sweden

Early Explorer100% ownedLithiumRare EarthsOthers

100% owned again after the conditional SQM Aero lithium earn-in was mutually terminated in January 2026; lithium exploration remains pre-resource and partner discussions are uncommitted.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements5
ten.nilivaara1Granted5,273.11 ha · No expiry supplied
ten.suorravaara6Granted4,007.04 ha · No expiry supplied
ten.suorravaara7Granted4,259.3 ha · No expiry supplied
ten.suorravaara3Granted2,800 ha · No expiry supplied
ten.suorravaara5Granted10,560.73 ha · No expiry supplied

Other

Jalkunen Graphite Project

Sweden

Resource Stage100% ownedGraphite

Historical resource-stage graphite project without a current reserve, economic study or development plan.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred31.5M t ore14.9% graphitic carbonGraphite2025-06-30
Tenements2
ten.jalkunen1Granted459.04 ha · No expiry supplied
ten.jalkunen4Granted2,194.45 ha · No expiry supplied

Other

Raitajarvi Graphite Project

Sweden

Resource Stage100% ownedGraphite

Historical JORC 2004 graphite resource without a current reserve, study or development plan.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated3.4M t ore7.3% graphitic carbonGraphite2025-06-30
Mineral ResourceInferred900K t ore6.4% graphitic carbonGraphite2025-06-30
Tenements2
ten.raitajarvi5Granted169.74 ha · No expiry supplied
ten.raitajarvi7Granted234.97 ha · No expiry supplied

Other

Kiskama Copper-Cobalt Project

Sweden

Divested0% ownedCopperCobalt

The Kiskama exploration tenement expired after 15 years and was not renewed due to limited development outlook; the historical resource is retained only as evidence and assigned no value.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred historical7.7M t ore0.25% copper and 0.04% cobalt (0.36% CuEq)Copper · Cobalt2025-06-30
Tenements1
ten.kiskama1Expired1,807.16 ha · 2026-03-31

Other

Vittangi Iron Project

Sweden

Resource Stage100% ownedIron Ore

Historical iron resource in the wider Vittangi area. The 2025 annual review reduced the resource after one tenement expired; no current study, reserve or development priority is disclosed.

Project location

Site imagery

Sentinel-2 · 10 m

Association needs review before imagery can be linked to this project.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred46.1M t ore28.7% ironIron Ore2025-06-30