OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TOK ASX

Tolu Minerals Limited

Care And Maintenance · Gold · PG Rating locked: sign in to view v8.1 · tok-20261104t223126-full
Last 2026-11-06
A$1.09
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$306.3M
EV
A$281.8M
Cash
A$56.5M
Debt
A$31.4M

Portfolio detail

Assets

4 assets

Core asset

Tolukuma Gold Mine (ML104) restart and near-mine resource

PG

Care And Maintenance100% ownedGold

Restart underway: CIL plant refurbishment (complete Q4 2026 target), underground development and ore stockpile; first gold targeted Q1 2027, full-rate H1 2028; no feasibility study or ore reserve.

Care and maintenance · Care and maintenance
Nameplate capacity
2.2e+05 tpa
Restart capex
—
Contained metal (attributable)
909.2k ozd
Last production year
2,015 year
Target restart
2027-03-31

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated199.1K oz7.33 g/t AuGold2026-06-30
Mineral ResourceInferred710.1K oz6.38 g/t AuGold2026-06-30
Tenements2
ml104Granted7.71 km2 · 2032-08-28
el2531Renewal Pending101.38 km2 · 2025-02-24
Milestones5
  1. CIL plant refurbishment complete (Q4 2026 target)

    Pending · High materiality

  2. Major Infrastructure Project and Hydro contract announcements (Q4 2026)

    Pending · High materiality

  3. First gold from the restart (Q1 2027)

    Pending · High materiality

  4. Full-rate production (H1 2028)

    Pending · High materiality

  5. Next Tolukuma resource update (planned 2027)

    Pending · Medium materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
ML104 mining lease (granted; described as fully permitted)PNG (Mineral Resources Authority)Granted2032-08-28No
Underground tailings facility design and approval (geotube dewatering in use; TMF under design)PNG (Mineral Resources Authority)Pending—Yes
Review of 2017 Memorandum of Agreement with Tolukuma Landowner AssociationPNGPending—No

Material

Mt Penck gold-copper project (EL2662, New Britain)

PG

Resource Stage100% ownedGoldCopper

Maiden Inferred resource (Sep 2026) from historical drilling only; staged two-year programme proposed; funding options under board review.

Resource / scoping · Resource stage
Contained metal (attributable)
293.0k ozd
Resource grade
1.2 g/t Au
% Measured + Indicated
0%d
Resource tonnes
7.30 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred293K oz1.2 g/t AuGold2026-09-20
Tenements1
el2662Renewal Pending102.6 km2 · 2025-10-25
Milestones1
  1. Staged two-year programme: Kavola and Peni Creek infill and first deep porphyry drill holes

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
EL2662 renewal application (to October 2027) pendingPNG (Mineral Resources Authority)Pending—No

Other

Saki gold prospect (Saki-Yava system, EL2531 area)

PG

Resource Stage100% ownedGold

Inferred resource reported in 2022 (Frontier Resources); not re-estimated; near-mine growth target.

Resource / scoping · Resource stage
Contained metal (attributable)
128.0k ozd
Resource grade
2 g/t Au
% Measured + Indicated
0%d
Resource tonnes
2.00 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred128K oz2.0 g/t AuGold2022-02-25
Tenements1
el2531-sakiRenewal Pending101.38 km2 · 2025-02-24

Other

Regional exploration licences (Ipi River, Namo, Etasi, Mt Kebea, Oro and others)

PG

Early Explorer100% ownedGoldCopper

About 2,226 km2 of exploration licences and applications; field programmes running (soil and stream sampling, Kimono drilling mobilisation); no resource.

Exploration · Early explorer
Ownership
10,000.0%
Commodity
Aur
Country
PGr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements4
el2780-ipiGranted395.56 km2 · 2026-12-02
el2866-namoGranted201.8 km2 · 2028-06-07
el2723-etasiRenewal Pending183.3 km2 · 2026-11-07
ela2890-kebeaApplication228.47 km2 · No expiry supplied
Milestones1
  1. Ipi River stream sediment program and field camp (2026)

    Pending · Low materiality

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)