OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor AII ASX (delisted September 1 2026); Nasdaq ALM; Frankfurt ALI1

Almonty Industries Inc.

Ramping Producer · Tungsten · KR · PT · ES · US · RW Rating locked: sign in to view v8 · aii-20261024t184304-full
Last 2026-09-02
A$25.89
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$7.4B
EV
A$7.4B
Cash
A$1.3B
Debt
A$827.9M

Portfolio detail

Assets

8 assets

Core asset

Sangdong Tungsten Mine

KR

Ramping Producer100% ownedTungsten

Ramping concentrate producer with September processing certification

Producer · Ramping producer
Production annualised (attributable)
—
Production (last FY, 100%)
—
AISC (latest quarter)
—
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
—
Head grade
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVUS$282.7M8% discount
IRR49.5%Published return
Operating cost136.3USD/MTU WO3 AISC study

Onwards 2025-2037 after tax; whole project IRR49.5%; NPV5 onwards343.7m; 14year horizon; average production231,200MTU excludes final year, true total3,071,900MTU.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated8M t ore0.51% WO3; 0.06% MoS2Tungsten2025-02-28
Mineral ResourceInferred50.7M t ore0.43% WO3; 0.05% MoS2Tungsten2025-02-28
Ore ReserveProbable8.6M t ore0.42% WO3Tungsten2025-02-28
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Processing and crushing mining facility inspection certificatesSouth KoreaGranted—Yes
Economic studies1
StudyStageStatusDateSummary
NI43-101 updated technical report February28 2025Updated FeasibilityCurrent2025-02-2814-year Phase I mine plan; onward 2025-2037 base NPV8 US282.7m at APT450;78% realized-price factor;85% recovery; excludes corporate and finance costs.

Material

Panasqueira Mine

PT

Producer100% ownedTungsten

Operating producer; absolute latest output and mine-life update absent

Producer · Producer
Production annualised (attributable)
—
Production (last FY, 100%)
—
AISC (latest quarter)
—
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
—
Head grade
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceHistorical Measured + Indicated10M t ore0.23% WO3Tungsten2016-09-30
Ore ReserveHistorical Proven + Probable2M t ore0.20% WO3Tungsten2016-09-30

Material

Los Santos Mine

ES

Care And Maintenance100% ownedTungsten

Tailings restart proposed; new offtake announced; readiness unproven

Care and maintenance · Care and maintenance
Nameplate capacity
—
Restart capex
—
Contained metal (attributable)
—
Last production year
—
Target restart
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Material

Gentung Tungsten Project

US

Resource Stage100% ownedTungsten

Undeveloped optionality; no complete current funded economic plan

Resource / scoping · Resource stage
Contained metal (attributable)
—
Resource grade
—
% Measured + Indicated
—
Resource tonnes
—
Our value per attrib. contained unit
Locked
Mining method
—

Other

Valtreixal Project

ES

PFS Developer100% ownedTungstenTin

Undeveloped optionality; no complete current funded economic plan

Developer · PFS developer
Study
—
Post-tax NPV (study prices, attributable)
—
NPV restated at our deck (attributable)
Locked
IRR
—
Initial capex (100%)
—
Capital intensity
—
LoM AISC
—
Mine life
—

Other

Sangdong Molybdenum Project

KR

Resource Stage100% ownedOthers

Undeveloped optionality; no complete current funded economic plan

Resource / scoping · Resource stage
Contained metal (attributable)
—
Resource grade
—
% Measured + Indicated
—
Resource tonnes
—
Our value per attrib. contained unit
Locked
Mining method
—

Other

Tungsten Oxide Plant

KR

PFS Developer100% ownedTungsten

Undeveloped optionality; no complete current funded economic plan

Processing plant / refinery · Study
Product and spec
—
Nameplate capacity
—
Throughput (12M)
—
Utilisation
—
Capital intensity (capex / tpa)
—
Feed source
—
Offtake contracted
—

Other

Rwanda Tungsten Platform

RW

Early Explorer75% ownedTungsten

Undeveloped optionality; no complete current funded economic plan

Exploration · Early explorer
Ownership
75%r
Commodity
WO3r
Country
RWr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)