OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor ASM ASX

Australian Strategic Materials Limited

PFS Developer · Rare Earths · Australia · South Korea · United States Rating locked: sign in to view v6
Last 2026-09-02
A$1.17
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$317.9M
EV
A$263.1M
Cash
A$57.6M
Debt
A$2.8M
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

3 assets

Core asset

Dubbo Project

Australia

PFS Developer100% ownedRare EarthsOthers

Wholly owned polymetallic deposit near Dubbo, NSW. A rare-earth-focused heap-leach PFS is evaluating separated oxides and a lower-capex mixed rare earth hydroxide precipitate pathway.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVA$570M8% discount
IRR14.8%Published return
Initial capexA$740MPublished capital estimate
Operating cost93,000,000AUD per annum
NPVA$921M8% discount
IRR18.4%Published return
Initial capexA$740MPublished capital estimate
Operating cost93,000,000AUD per annum

Post-tax NPV under blended Project Blue and Adamas pricing; Class 5 scoping estimate.

Post-tax NPV under Adamas pricing; Class 5 scoping estimate.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured42.8 Mt7,400 ppm TREO; 1.89% ZrO2; 0.45% Nb2O5; 0.04% HfO2Rare Earths · Others2017-12-31
Mineral ResourceInferred32.4 Mt7,400 ppm TREO; 1.90% ZrO2; 0.44% Nb2O5; 0.04% HfO2Rare Earths · Others2017-12-31
Ore ReserveProven18.9 Mt2021 OFS product suite; not the current heap-leach routeRare Earths · Others2021-10-01
Tenements3
ml1724Granted3,456 hectares of owned project land · 2036-12-18
el5548Granted— None · No expiry supplied
el7631Granted— None · No expiry supplied
Milestones2
  1. Complete both Heap Leach Option PFS product cases

    Pending · High materiality

  2. Develop a reserve estimate for the heap-leach route

    Pending · High materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
NSW Development Consent SSD-5251 as modifiedNew South WalesGranted—Yes
Federal EPBC environmental approvalAustraliaGranted—Yes
Further consent modification for Heap Leach OptionNew South WalesRequired—Yes
Economic studies2
StudyStageStatusDateSummary
Dubbo Project Heap Leach Scoping StudyScoping StudyCurrent2025-07-11Rare-earth-focused 1.0 Mtpa first phase over 42 years, based on Measured resources and Class 5 cost accuracy.
Dubbo Project Optimisation Feasibility StudyUpdated FeasibilitySuperseded2021-12-07Broader product-suite study with A$1.678 billion capital cost, superseded for current planning by heap-leach PFS work.

Core asset

Korean Metals Plant

South Korea

Ramping Producer100% ownedRare Earths

Operating rare-earth metals and alloy plant ramping NdFeB and NdPr volumes while expanding nameplate NdFeB alloy capacity to approximately 3,600 tpa and developing Tb/Dy capability.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Milestones2
  1. Receive operating permit for newly installed furnaces

    Pending · High materiality

  2. Complete Phase 2 capacity ramp

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Operating permit for newly installed furnacesSouth KoreaPending—Yes

Other

American Metals Plant

United States

Early Explorer100% ownedRare Earths

Planned rare-earth metals and alloys plant of up to 4,000 tpa nameplate alloy capacity; site selection and permitting depend on transaction implementation, funding and approvals.

Milestones1
  1. Finalise US site selection and progress permitting

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Site-specific development and operating permitsUnited StatesRequired—Yes