OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor BCN ASX

Beacon Minerals Limited

Ramping Producer · Gold · AU Rating locked: sign in to view v8.1 · bcn-20261104t223132-full
Last 2026-11-06
A$2.73
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$317.7M
EV
A$297.9M
Cash
A$27.7M
Debt
A$7.9M

Portfolio detail

Assets

3 assets

Core asset

Lady Ida JV: Iguana deposit (Beacon 50% JV economics until 72,500 oz recovered, then 100% with 4% NSR to GL)

AU

Ramping Producer100% ownedGold

Open-pit mining and Jaurdi milling since Apr 2026; 4,566 oz JV production Apr-Jun 2026; PFS Aug 2026; the 50% GL share before transfer is a bridge claim.

Producer · Ramping producer
Production annualised (attributable)
12.5k ozd
Production (last FY, 100%)
—
AISC (latest quarter)
—
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
—
Head grade
1.20 g/ts

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Initial capexA$2.5MPublished capital estimate
Operating cost3,283AUD/oz
Discount rate8%Published study basis

Study: A$5,500/oz, 100% basis, pre-tax, undiscounted cash flow A$841m; NPV at 8% not published. Analyst cash flows reproduce the undiscounted figure within A$1m.

Resources & reserves5
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcemeasured130K t0.87 g/t Au (4 koz)Gold2026-06-30
Mineral Resourceindicated10.1M t1.41 g/t Au (457 koz)Gold2026-06-30
Mineral Resourceinferred1.3M t1.71 g/t Au (73 koz)Gold2026-06-30
Ore Reserveproved135K t0.80 g/t Au (3.5 koz)Gold2026-06-30
Ore Reserveprobable10.9M t1.21 g/t Au (426.8 koz)Gold2026-08-20
Tenements1
lady-ida-tenementsGranted— None · No expiry supplied
Milestones1
  1. Transfer of 100% title to Beacon after 72,500 oz recovered through the Jaurdi mill (about 1.7 years at study rates)

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Iguana mining approvals (ore reserve states key mining approvals granted)Western AustraliaGranted—No
Economic studies2
StudyStageStatusDateSummary
Iguana Pre-Feasibility Study (Aug 2026, 100% basis)PFSCurrent2026-08-209-year open-pit mine, 11.06 Mt ore at 1.20 g/t, 88.1% recovery, 379,190 oz; A$5,500/oz; pre-tax undiscounted cash flow A$841m; AISC A$3,283/oz; establishment capital A$2.5m; 8% discount rate; NPV not published.
Iguana Pre-Feasibility Study (Feb 2025, superseded)PFSSuperseded2025-02-243.4 Mt reserve, 132 koz; A$3,600/oz; undiscounted A$177.1m; superseded by the Aug 2026 study.

Core asset

Jaurdi processing hub (Jaurdi mill, Geko, Black Cat South, Golden Slipper, Lightning and stockpiles)

AU

Producer100% ownedGold

Operating mill at about 1.05 Mtpa run rate with tank farm expansion commissioning (Oct-Nov 2026); mill also processes JV ore; Geko water pipeline under construction.

Producer · Producer
Production annualised (attributable)
1.4k ozd
Production (last FY, 100%)
24.9k oz
AISC (latest quarter)
A$4,531/oz
AISC margin at spot
22.6%m
Delivery vs guidance
—
Reserve life
1.9 yrsd
Head grade
0.97 g/t

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves7
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcemeasured925K t1.28 g/t Au (38 koz)Gold2026-06-30
Mineral Resourceindicated268K t1.29 g/t Au (11 koz)Gold2026-06-30
Mineral Resourceinferred185K t1.34 g/t Au (8 koz)Gold2026-06-30
Mineral Resourceindicated629K t1.35 g/t Au (27 koz)Gold2026-06-30
Mineral Resourceinferred389K t1.24 g/t Au (16 koz)Gold2026-06-30
Ore Reserveproved1.5M t1.00 g/t Au (48.1 koz)Gold2026-06-30
Ore Reserveprobable656K t1.97 g/t Au (41.5 koz)Gold2026-06-30
Tenements1
jaurdi-tenementsGranted— None · No expiry supplied
Milestones2
  1. Jaurdi tank farm expansion commissioning (wet commissioning from 13 Oct 2026)

    Pending · High materiality

  2. Geko paleochannel water pipeline commissioning

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Geko water road and pipeline approval (received; construction commenced)Western AustraliaGranted—No

Material

Mt Dimer (Golden Slipper and Lightning reserves carried in Jaurdi hub)

AU

Resource Stage100% ownedGold

Resource-stage; non-core tenements sold to FRS (Dec 2025); drilling of new prospects planned Q4 FY27 after heritage surveys.

Resource / scoping · Resource stage
Contained metal (attributable)
51.0k ozd
Resource grade
3.65 g/t
% Measured + Indicated
56.9%d
Resource tonnes
0.44 Mt
Our value per attrib. contained unit
Locked
Mining method
—
Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated215K t4.25 g/t Au (29 koz)Gold2026-06-30
Mineral Resourceinferred226K t3.07 g/t Au (22 koz)Gold2026-06-30
Tenements1
mt-dimer-tenementsGranted— None · No expiry supplied
Milestones1
  1. Mt Dimer drilling program (after heritage surveys in Q3 FY27)

    Pending · Medium materiality

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)