OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor MLX ASX

Metals X Limited

Producer · Tin · Australia Rating locked: sign in to view v8.1 · mlx-20261031t172751-full
Last 2026-11-06
A$1.52
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$1.3B
EV
A$913.5M
Cash
A$434.9M
Debt
A$0

Portfolio detail

Assets

2 assets

Core asset

Renison Tin Operation

Australia

Producer50% ownedTinCopper

Producing underground tin mine in Tasmania, 50% owned through the Bluestone Mines Tasmania Joint Venture; 2,663 t Sn produced in September 2026 quarter (100%); dewatering, power and winder projects under way.

Producer · Producer
Production annualised (attributable)
5.3k td
Production (last FY, 100%)
10.7k t
AISC (latest quarter)
A$39,463/t
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
9.6 yrsd
Head grade
2.02% Sn
Published study economicsIssuer or study metrics
Operating cost26,247AUD/t Sn LOM all-in cost (2023 plan)

100% basis; no NPV or IRR is published for the operating mine plan

Resources & reserves7
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured3.7 Mt1.73% SnTin2026-03-31
Mineral ResourceIndicated14.9 Mt1.34% SnTin2026-03-31
Mineral ResourceInferred3.1 Mt1.15% SnTin2026-03-31
Mineral ResourceTotal21.8 Mt1.38% SnTin2026-03-31
Ore ReserveProved2.5 Mt1.43% SnTin2025-03-31
Ore ReserveProbable5 Mt1.34% SnTin2025-03-31
Ore ReserveProved and Probable7.5 Mt1.37% SnTin2025-03-31
Milestones3
  1. 2026 Renison life-of-mine plan and Ore Reserve update (guided for Q3 CY2026, not published by 31 October 2026)

    Delayed · High materiality

  2. Winder control system installation with four to six week hoist shutdown, Q1 CY2027

    Pending · Medium materiality

  3. Mine dewatering: 1900 pump station wet commissioning and 1087 vertical dam construction

    At Risk · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Renison operating approvals (fully permitted for life of mine)TasmaniaGranted—No
Economic studies1
StudyStageStatusDateSummary
Renison life-of-mine plan (December 2023, reaffirmed with 2025 reserve at 10.9 years)Operating PlanCurrent2023-12-19Mine life to about 2035; first ten years average 10,191 t Sn per year; LOM all-in cost A$26,247/t Sn at 2023 prices; the 2025 reserve update shows a 10.9-year LOM schedule including 1.88 Mt Inferred at 1.18% Sn; a 2026 update is pending.

Material

Rentails tailings retreatment project

Australia

Resource Stage50% ownedTinCopper

Development option: FEED for a 2.4 Mtpa tailings reprocessing plant now due H1 CY2027 (was late CY2026); EIS and Commonwealth PER lodged; environmental offsets on the critical path; no current capital cost, NPV or ore reserve (reserve withdrawn April 2024 pending DFS update); final investment decision follows FEED and approvals.

Resource / scoping · Resource stage
Contained metal (attributable)
59.6k td
Resource grade
0.43% Sn
% Measured + Indicated
100%d
Resource tonnes
27.50 Mt
Our value per attrib. contained unit
Locked
Mining method
Tailings retreatment (2.4 Mtpa reprocessing plant, FEED stage)
Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured27.5 Mt0.43% Sn, 0.23% CuTin2024-11-04
Milestones1
  1. Rentails FEED completion, environmental approvals and final investment decision (H1 CY2027, previously late CY2026)

    Delayed · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Rentails EIS (Tasmanian EPA) and EPBC Public Environment Report (DCCEEW)Tasmania and CommonwealthPending—Yes
Economic studies1
StudyStageStatusDateSummary
Rentails DFS update (in progress; reserve withdrawn)Updated FeasibilitySuperseded2024-04-02The 2017 DFS and Ore Reserve are withdrawn pending a DFS update; the FEED now under way will report capital cost on completion. No NPV or capital cost is available to the cutoff.

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Stock database

Other assets

Plants, holdings and assets valued inside a project
Elementos Limited (15.91%) · Equity investment · Held
Investee
Elementos Limited
Holding
15.9%
Shares held
69.09m
Market value
—
% of holder's market cap
—
Cost basis
A$7.8m
First Tin PLC (29.95%) · Equity investment · Held
Investee
First Tin PLC
Holding
29.9%
Shares held
162.31m
Market value
—
% of holder's market cap
—
Cost basis
A$16.9m
Stellar Resources Limited (16.34%) · Equity investment · Held
Investee
Stellar Resources Limited
Holding
16.3%
Shares held
55.58m
Market value
—
% of holder's market cap
—
Cost basis
A$18.4m