Medallion Metals Limited

Construction · Gold · AU Rating locked: sign in to view v8.1 · mm8-20261104t223134-full
Last 2026-11-06
A$0.38
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$352.7M
EV
A$256.3M
Cash
A$96.9M
Debt
A$0

Portfolio detail

Assets

2 assets

Core asset

Ravensthorpe Gold Project - Kundip Mining Centre underground with Cosmic Boy processing

AU

Construction100% ownedGoldCopperSilver

FID approved Feb 2026; all regulatory approvals received by Q1 FY27; underground development commenced at KMC; EPC for Cosmic Boy awarded; commissioning targeted Q2 CY2027.

Developer · Construction
Study
feasibility study
Post-tax NPV (study prices, attributable)
A$443.0md
NPV restated at our deck (attributable)
Locked
IRR
8,700.0%
Initial capex (100%)
A$138.0m
Capital intensity
A$1,792/(oz/yr)d
LoM AISC
A$2,279/oz
Mine life
5.7 yrs

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVA$443M8% discount
IRR87%Published return
Initial capexA$138MPublished capital estimate
Operating cost2,279AUD/oz AISC

Post-tax NPV at 8%, base case gold US$3,380/oz, A$:US$ 0.65, copper US$9,300/t

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated6.4M t3.3 g/t AuGold2025-08-28
Mineral Resourceinferred3.8M t3.5 g/t AuGold2025-08-28
Mineral Resourcesulphide subset total5.7M t4.6 g/t AuGold · Copper2025-08-28
Ore Reserveprobable2.1M t3.54 g/t AuGold · Copper · Silver2025-12-12
Tenements1
rgp-e74-0311Granted— None · No expiry supplied
Milestones3
  1. Underground decline and box cut at KMC (December 2026 quarter focus)

    Pending · High materiality

  2. Commissioning of modified CBC on Kundip ore (Q2 CY2027)

    Pending · High materiality

  3. Steady-state production (H2 CY2027)

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
EPBC Act approval (Commonwealth)CommonwealthGranted—Yes
Mining Development and Closure Proposal (WA)Western AustraliaGranted—Yes
Economic studies1
StudyStageStatusDateSummary
KMC underground with Cosmic Boy processing feasibility study (Dec 2025)DFSCurrent2025-12-12Base case: 5.7-year LOM, 3.45 Mt production inventory at 4.0 g/t AuEq, 416 koz AuEq produced, pre-production capital A$138m, post-tax NPV8 A$443m (base) and A$668m (spot), IRR 87%/125%, AISC A$2,279/oz.

Material

Forrestania Gold Project exploration (Lounge Lizard, Teddy Bear, 53 regional targets)

AU

Discovery Drill Stage100% ownedGold

Acquired from IGO 27 Feb 2026 (asset sale; A$1m exclusivity fee and deferred NSR royalty of up to 1.5% on future production from the acquired tenements). Cosmic Boy plant is in the KMC valuation; no Forrestania mineral resource yet.

Exploration · Discovery drill stage
Ownership
100%r
Commodity
Aur
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
fgp-e74-470Granted— None · No expiry supplied
Milestones1
  1. Lounge Lizard maiden Mineral Resource Estimate (in progress)

    Pending · Medium materiality

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Stock database

Other assets

Plants, holdings and assets valued inside a project
Cosmic Boy Concentrator (Forrestania), refurbishment for KMC ore · Processing plant / refinery · Construction
Product and spec
copper-gold concentrate (Trafigura concentrate offtake) and gold dore
Nameplate capacity
6.5e+05 tpa
Throughput (12M)
6.5e+05 tpa
Utilisation
100%d
Capital intensity (capex / tpa)
A$75.38/(tpa)d
Feed source
Ravensthorpe sulphide ore (KMC) and third-party ore under toll agreement
Offtake contracted
—