OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor NMG ASX

New Murchison Gold Limited

Producer · Gold · AU Rating locked: sign in to view v8.1 · nmg-20261102t225750-full
Last 2026-11-06
A$0.057
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$619.3M
EV
A$400M
Cash
A$220.4M
Debt
A$64K

Portfolio detail

Assets

3 assets

Core asset

Crown Prince open pit complex (Crown Prince OP, Cloudkicker OP, stockpiles)

AU

Producer100% ownedGold

Ore sold since September 2025 to Westgold Bluebird under the OPA. Crown Prince Stage 1/2 pit integrating into one pit (Oct 2026); Cloudkicker open pit started late June 2026 under the M51/886 approval, expected to add about 20koz over 12-18 months. Crown Prince underground and Lydia/Abbotts open pit studies targeted early 2027.

Producer · Producer
Production annualised (attributable)
43.3k ozd
Production (last FY, 100%)
55.0k oz
AISC (latest quarter)
A$4,972/oz
AISC margin at spot
15.1%m
Delivery vs guidance
—
Reserve life
1.3 yrsd
Head grade
2.2 g/t Au

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVA$83M8% discount
IRR321%Published return

Study Table 2 at A$3,250/oz; the JORC text quotes A$63m for the same reserve case (conflict recorded in documents.json); initial capex not read from the page image.

Resources & reserves5
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal incl stockpiles827K t2.7 g/t AuGold2026-06-30
Mineral Resourcemeasured+indicated+inferred499K t1.9 g/t AuGold2026-06-30
Ore Reserveprobable640K t3.1 g/t AuGold2026-06-30
Ore Reserveproved190K t0.8 g/t AuGold2026-06-30
Ore Reserveprobable310K t2.2 g/t AuGold2026-06-30
Tenements2
m51_886Granted— km2 · No expiry supplied
m51_0926Granted— km2 · No expiry supplied
Milestones2
  1. Crown Prince Stage 1 and Stage 2 pit integrated at 420mRL (October 2026)

    Achieved · Medium materiality

  2. Cloudkicker open pit two-stage operation to Q3 calendar 2027

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
M51/886 mining proposal (includes Cloudkicker)WAGranted—No
Economic studies1
StudyStageStatusDateSummary
Crown Prince open pit maiden reserve and feasibility study (Feb 2025)DFSSuperseded2025-02-03Open pit only, 30-month life, 0.89 Mt ore at 4.8 g/t, 140koz LOM; AISC A$2,221/oz at A$3,250/oz. Superseded by the 2026 reserve, Cloudkicker and depletion.

Material

Garden Gully extensions: Crown Prince underground, Lydia, Abbotts and Cloudkicker non-reserve resource

AU

Resource Stage100% ownedGold

Crown Prince underground, Lydia and Abbotts are resources only (JORC 2026). Studies on underground and Lydia open pit are targeted for early 2027. No development decision, capex or mine plan has been published.

Resource / scoping · Resource stage
Contained metal (attributable)
—
Resource grade
1.8 g/t Au
% Measured + Indicated
0%d
Resource tonnes
789.0k t
Our value per attrib. contained unit
Locked
Mining method
Conventional open pit (proposed)
Resource / scoping · Resource stage
Contained metal (attributable)
150.4k ozd
Resource grade
3.2 g/t Au
% Measured + Indicated
85.1%d
Resource tonnes
1.45 Mt
Our value per attrib. contained unit
Locked
Mining method
Long hole stoping, underground loaders and haul trucks
Resource / scoping · Resource stage
Contained metal (attributable)
55.1k ozd
Resource grade
1.8 g/t Au
% Measured + Indicated
49.9%d
Resource tonnes
0.96 Mt
Our value per attrib. contained unit
Locked
Mining method
Conventional open pit (proposed)

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated+inferred+measured1.5M t3.2 g/t AuGold2026-06-30
Mineral Resourcemeasured+indicated+inferred961K t1.8 g/t AuGold2026-06-30
Mineral Resourceinferred789K t1.8 g/t AuGold2026-06-30
Tenements2
m51_889Granted— km2 · No expiry supplied
m51_390Granted— km2 · No expiry supplied
Milestones1
  1. Crown Prince underground and Lydia open pit studies complete (early 2027)

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Crown Prince underground mining approvals and ventilation portalWARequired—Yes

Other

Garden Gully regional exploration (619 km2 tenure, Abbernethy and Airstrip)

AU

Early Explorer100% ownedGold

Active drilling at Airstrip (155 holes, 12,110 m), Abernethy South JV ground (90%), Garden Gully regional targets. No defined resource beyond the project above.

Exploration · Early explorer
Ownership
100%
Commodity
Aur
Country
AUr
Best recent intercept (grade x width)
—
Metres drilled (12M)
—
Exploration spend (12M)
—
Tenements1
garden_gully_619km2Granted619 km2 · No expiry supplied

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Stock database

Other assets

Plants, holdings and assets valued inside a project
Cloudkicker open pit (on M51/886; valued within crown_prince_op) · Producer · Ramping producer
Production annualised (attributable)
—
Production (last FY, 100%)
—
AISC (latest quarter)
—
AISC margin at spot
—
Delivery vs guidance
—
Reserve life
—
Head grade
—
Parbo Resources listed investment · Equity investment · Held
Investee
Parbo Resources Limited
Holding
—
Shares held
—
Market value
—
% of holder's market cap
—
Cost basis
A$2.0m