OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor SYR ASX

Syrah Resources Limited

Producer · Graphite · Mozambique · United States Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.063
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$146.3M
EV
A$470.4M
Cash
US$98.3M
Debt
US$311.5M
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

4 assets

Core asset

Balama Graphite Operation

Mozambique

Producer95% ownedGraphite

Campaign-mode producer with Q2 2026 production limited to 2.3kt and the next campaign deferred to Q3; 2026 production guidance was cut to 60-80kt amid subdued ex-China fines demand.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured21M dry tonnes16.8% TGCGraphite2025-12-31
Mineral ResourceIndicated240.4M dry tonnes13.0% TGCGraphite2025-12-31
Mineral ResourceInferred773.4M dry tonnes11.0% TGCGraphite2025-12-31
Ore ReserveProbable109.6M dry tonnes16.3% TGC; 17.8 Mt graphitic carbonGraphite2025-12-31
Tenements1
balama-6432cGranted— None · No expiry supplied
Milestones1
  1. Complete the deferred September 2026-quarter production campaign

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Balama Mining Concession 6432CMozambiqueGranted—No
Economic studies1
StudyStageStatusDateSummary
Updated Balama Ore Reserve and Mineral ResourceOperating PlanReaffirmed2026-03-26The 2025 annual report reaffirms the reserve and resource model after depletion and stockpile adjustments; demand and pricing remain the principal operating constraints.

Core asset

Vidalia Active Anode Material Facility

United States

Ramping Producer100% ownedGraphite

Existing 11.25ktpa facility produced about 150t in Q2 2026 for final qualification and process-control work; commercial sales remain conditional on customer approvals targeted for 2H 2026.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost4.55USD/kg AAM midpoint

Midpoint of issuer US$4.30-4.80/kg steady-state guidance before Section 45X credits; not a demonstrated current cost.

Milestones1
  1. Obtain final customer qualification approvals and commence commercial AAM sales

    Pending · High materiality

Economic studies1
StudyStageStatusDateSummary
Vidalia 11.25ktpa qualification and operating planOperating PlanCurrent2026-07-23Current plan limits production to qualification needs until customer approval, then targets ramp toward installed 11.25ktpa capacity.

Material

Vidalia Further Expansion

United States

DFS Unfunded Developer100% ownedGraphite

Expansion to 45ktpa total AAM capacity has a US$539m DFS capital estimate and conditional Section 48C support, but requires commercial sales, customer commitments, financing and a final investment decision.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Initial capexUS$539MPublished capital estimate

Issuer-disclosed DFS development-capital estimate; full project economics and funding terms are not reproduced in the local evidence packet.

Milestones1
  1. Board consideration of further progress toward expansion FID

    Pending · Medium materiality

Economic studies1
StudyStageStatusDateSummary
Vidalia Further Expansion Definitive Feasibility StudyDFSCurrent2026-03-26Annual-report disclosure cites US$539m of development capital for 45ktpa total AAM capacity; funding and FID remain unresolved.

Other

Balama Vanadium Project

Mozambique

PFS Developer95% ownedOthers

Vanadium-bearing Balama process streams remain a study option; no separate resource, reserve, recovery, capex or economic result in the local packet supports a material valuation.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
balama-vanadium-6432cGranted— None · No expiry supplied
Milestones1
  1. Complete planned vanadium pre-feasibility study

    Pending · Medium materiality