OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor MPK ASX

Many Peaks Minerals Limited

PFS Developer · Gold · Côte d'Ivoire · Canada Rating locked: sign in to view v6.2
Last 2026-11-06
A$1.06
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$181M
EV
A$154.3M
Cash
A$26.7M
Debt
A$0
4 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

5 assets

Core asset

Ferké Gold Project

Côte d'Ivoire

PFS Developer65% ownedGold

Ouarigue has a 1.323Moz JORC MRE on 65%-owned Ferké North. September drilling extends mineralisation below the current resource; results are excluded from the MRE. Ferké South application remains ungranted with 0% current interest.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics

No numeric study economics were published.

No completed PFS, reserve, mine schedule, capex or operating costs at the cutoff; deep results are excluded from the published MRE.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured8.2M tonnes1.50 g/t Au; 398,000 oz contained goldGold2026-04-20
Mineral ResourceIndicated14.9M tonnes1.46 g/t Au; 700,000 oz contained goldGold2026-04-20
Mineral ResourceInferred3.5M tonnes2.00 g/t Au; 225,000 oz contained goldGold2026-04-20
Tenements2
ferke-north-pr367Granted300 km2 · No expiry supplied
ferke-south-pr1087Application221 km2 · No expiry supplied
Milestones3
  1. Maiden Ouarigue mineral resource estimate

    Achieved · High materiality

  2. Updated MRE and integrated PFS-level open-pit/scoping-level underground assessment in Q4 2026

    Pending · High materiality

  3. Update Ouarigue MRE alongside the PFS

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Ferké North exploration permit PR367Côte d'IvoireGranted—No
Ferké South exploration permit PR1087Côte d'IvoirePending—Yes
Economic studies1
StudyStageStatusDateSummary
Ouarigue Pre-Feasibility StudyPFSCurrent2026-04-21An integrated open-pit PFS-level and underground scoping-level assessment is targeted after the updated MRE in Q4 2026; no project economics have been published.

Material

Odienné Gold Project

Côte d'Ivoire

Discovery Drill Stage65% ownedGold

MPK holds 65% through the GIV joint venture and may earn to 85% by sole-funding a project within the joint-venture permits through definitive feasibility study. AC results from the June 2026 programme were pending at cutoff.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements2
odienne-pr865Granted— km2 · No expiry supplied
odienne-pr866Granted— km2 · No expiry supplied
Milestones1
  1. Receive and interpret June 2026 air-core drilling results

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Odienné exploration licences PR865 and PR866Côte d'IvoireGranted—No

Material

Baga Gold Project

Côte d'Ivoire

Early Explorer100% ownedGold

MPK exercised the option and issued the 1.5m share consideration in August; the FY26 annual tenement schedule shows 100% ownership. The US$1m cash payment and possible milestone obligations remain valuation allowances because public settlement/payment status is not fully verified.

Tenements2
baga-pr815Granted— km2 · No expiry supplied
baga-pr816Granted— km2 · No expiry supplied
Milestones2
  1. Exercise option to acquire 100% of Baga holder

    Achieved · High materiality

  2. Verify remaining US$1m cash consideration and final acquisition settlement

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Baga exploration permits PR815 and PR816Côte d'IvoireGranted—No

Other

Oumé (Beriaboukro) Gold Project

Côte d'Ivoire

Early Explorer65% ownedGold

GIV joint-venture permit at an early exploration stage; no exploration activity or decision-useful resource evidence was reported in the current package.

Tenements1
oume-pr464Renewal Pending— km2 · No expiry supplied
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Oumé exploration permit PR464Côte d'IvoirePending—Yes

Other

Aska Lithium Project

Canada

Early Explorer100% ownedLithium

Five Newfoundland and Labrador mineral licences remain held, but no material current exploration programme, resource or economics were disclosed in the latest package.

Tenements5
aska-035267mGranted— None · No expiry supplied
aska-035268mGranted— None · No expiry supplied
aska-035270mGranted— None · No expiry supplied
aska-035271mGranted— None · No expiry supplied
aska-035272mGranted— None · No expiry supplied