PMET Resources Inc.
v8.1 · pmt-20261031t211109-full- Last 2026-11-06
- A$0.33
- 1D
- —
- 1M
- —
- YTD
- —
- 1Y
- —
- Fair value
- Locked: sign in to view
- Upside
- Locked: sign in to view
- Mkt cap
- A$613.6M
- EV
- A$434.1M
- Cash
- C$176.2M
- Debt
- C$0
1 newer ASX announcement not yet reflected in this valuation
- Caesium Mineral Resource Increases in Grade and ScaleRecent Resource Or Reserve Source
Investment view
Rating locked: sign in to viewOur rating, thesis and what the price implies are available to subscribers.
Sign in or enter a guest codeAnnouncements
Latest 12 of 19All sources ▸- PMET Advances Shaakichiuwaanaan DevelopmentOperations
- Local investor register (ownership/PMT/investors.json, reviewed 9 October 2026)Governance
- PMET Files Amended Version of its NI 43-101 Technical ReportStudy
- PMET Resources Site Visit Presentation - September 2026Presentation
- 30 June 2026 Quarterly Financial Statements and MD&AResults
- PMET Resources Corporate Presentation - June 2026Presentation
- Annual Financial Statements and MD&A for FYE 31 March 2026Results
- Annual Information Form for FYE 31 March 2026Governance
- Concept Study Identifies Potential Refining PathwayStudy
- Closing of Flow-Through Private Placement & Public OfferingFinancing
- PMET Announces Up To Aggregate C$130 Million FinancingsFinancing
- 31 December 2025 Quarterly Financial Statements and MD&AResults
Event calendar · next 12 months
8 events| Timing | Event | Category | Confidence | Materiality | Investor relevance |
|---|---|---|---|---|---|
| Fall 2026 to end 2027 | Quebec and federal ESIA review: information requests and responses | Permitting | Company Guided | High | Authorisation is required before FID; the company guides a decision window of end 2027 to early 2028. |
| 2026-2027 | Project financing process (ECAs, banks, Volkswagen cornerstone) | Financing | Company Guided | High | Size and terms of debt and any strategic equity determine the dilution that drives value per CDI. |
| Q4 2026 | Updated CV5 lithium-tantalum Feasibility Study | Study | Company Guided | High | Resets capex, schedule and price deck; tantalum by-product and phasing could lift the C$1.59B NPV8, while a price deck closer to spot would cut it. |
| Q4 2026 ("shortly") | Updated Mineral Resource Estimate (MRE-5) | Resource Or Reserve | Company Guided | High | Underpins the updated FS and PEA; tests whether CV13 and the CV4-CV5 gap add tonnes and whether caesium and tantalum move into reportable co-product resources. |
| Q4 2026 | CV5 + CV13 lithium-caesium-tantalum PEA | Study | Company Guided | Medium | First economic test of the caesium and CV13 upside that our valuation leaves outside the base case. |
| Q1 2027 | 2026 drill programme assays | Exploration | Company Guided | Medium | Geotechnical, infill and caesium results feed detailed engineering, the CV5 caesium resource and MRE-6. |
| Early 2027 | XRT ore-sorting testwork on pollucite samples | Study | Company Guided | Medium | Tests a low-cost route to a caesium concentrate from CV5 and CV13 pollucite. |
| 2H / end of calendar 2027 | Final investment decision | Financing | Company Guided | High | FID unlocks construction; with lithium carbonate down about 50% since May 2026 and approvals guided to end 2027/early 2028, our base case puts FID in early 2028 and first commercial production in FY2032, about 1.5 years after the company plan. |
Executive roster
As of 2026-10-31Background checks ▸AIF (19 June 2026) lists the CEO, CFO, CDO/COO and EVP Exploration as officers; the EVP Commercial appointment is in the AIF history; the EVP ESG and the Australian company secretary come from the issuer leadership page via the local management review. No later executive change was found in the ASX releases to the cutoff.
| Executive | Title | Normalized role | Appointed | Sources |
|---|---|---|---|---|
| Kenneth Brinsden | President, Chief Executive Officer and Managing Director | Executive Director · Chief Executive | 2024-01-24 | Annual Information Form for FYE 31 March 2026 |
| Natacha Garoute | Chief Financial Officer | Finance | 2023-01-23 | Annual Information Form for FYE 31 March 2026 · 30 June 2026 Quarterly Financial Statements and MD&A |
| Frédéric Mercier-Langevin | Chief Development Officer / Chief Operating Officer | Operations · Technical | 2025-03-31 | Annual Information Form for FYE 31 March 2026 |
| Darren L. Smith | Executive Vice President of Exploration | Technical · Senior Management | 2019-05-14 | Annual Information Form for FYE 31 March 2026 |
| Alex Eastwood | Executive Vice President - Commercial | Commercial · Senior Management | 2024-08-15 | Annual Information Form for FYE 31 March 2026 |
| Grace Barrasso | Executive Vice President, ESG and Corporate Affairs | Senior Management | — | Local management assessment (management/PMT/summary.md and background-check.json) |
| Mathew O'Hara | Company Secretary (Australia) | Company Secretary | — | Local management assessment (management/PMT/summary.md and background-check.json) |
devCoverage status: Partial
Portfolio detail
Assets
Core asset
Shaakichiuwaanaan Project (CV5 and CV13 pegmatites)
CA
Feasibility-stage lithium developer: CV5 lithium-only FS (Oct 2025), ESIA submitted March 2026, updated FS with tantalum and a CV5+CV13 PEA due Q4 2026, FID targeted end 2027, no construction funding committed.
- Study
- Feasibility Study (CV5 lithium-only)
- Post-tax NPV (study prices, attributable)
- C$1.6bd
- NPV restated at our deck (attributable)
- Locked
- IRR
- 18.1%
- Initial capex (100%)
- C$1.5b
- Capital intensity
- C$39,249/(t/yr)d
- LoM AISC
- A$15,961/td
- Mine life
- 19.0 yrs
Project location
Approximate location
© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.
After-tax, real 2025 C$, 100%; US$1,221/t SC5.5 at C$1.34/US$; capex before C$101.7M pre-production credit and C$366.6M development tax credits.
Resources & reserves7
| Type | Category | Quantity | Grade | Contained minerals | Date |
|---|---|---|---|---|---|
| Mineral Resource | Indicated | 108M t | 1.40% Li2O, 0.11% Cs2O, 166 ppm Ta2O5, 66 ppm Ga | Lithium · Others | 2025-06-20 |
| Mineral Resource | Inferred | 33.4M t | 1.33% Li2O, 0.21% Cs2O, 155 ppm Ta2O5, 65 ppm Ga | Lithium · Others | 2025-06-20 |
| Mineral Resource | Indicated (Rigel and Vega caesium zones, within CV13) | 693K t | 4.40% Cs2O, 2.12% Li2O, 283 ppm Ta2O5 | Others | 2025-06-20 |
| Mineral Resource | Inferred (Vega caesium zone, within CV13) | 1.7M t | 2.40% Cs2O, 1.81% Li2O, 245 ppm Ta2O5 | Others | 2025-06-20 |
| Ore Reserve | Probable (open pit) | 49.2M t | 1.12% Li2O | Lithium | 2025-09-11 |
| Ore Reserve | Probable (underground) | 35.1M t | 1.45% Li2O | Lithium | 2025-09-11 |
| Ore Reserve | Probable (total) | 84.3M t | 1.26% Li2O | Lithium | 2025-09-11 |
Tenements1
Milestones5
- CV5 lithium-only Feasibility Study and maiden reserve
Achieved · High materiality
- ESIA submitted (provincial and federal)
Achieved · High materiality
- Updated CV5 FS with tantalum and CV5+CV13 PEA
Pending · High materiality
- Final investment decision
At Risk · High materiality
- First production (company pathway)
At Risk · High materiality
Permits & approvals4
| Permit | Jurisdiction | Status | Expiry | Critical path |
|---|---|---|---|---|
| Quebec ESIA authorisation (JBNQA COMEV/COMEX process) | Quebec, Canada | Pending | — | Yes |
| Federal impact assessment (Impact Assessment Agency of Canada) | Canada | Pending | — | Yes |
| Hydro-Quebec power allocation (54 km 120 kV line) | Quebec, Canada | Required | — | Yes |
| CV5 underground bulk-sample exemption (COMEV) | Quebec, Canada | Pending | — | No |
Economic studies3
| Study | Stage | Status | Date | Summary |
|---|---|---|---|---|
| CV5 Lithium-Only Feasibility Study (G Mining Services lead) | DFS | Current | 2025-10-20 | After-tax NPV8 C$1,594M, IRR 18.06%, development capex C$1,978M (C$1,510M net), AISC C$800/t SC5.5, ~800ktpa nominal, 19-20 year life at US$1,221/t SC5.5; technical report amended October 2026 without economic change. |
| Preliminary Economic Assessment (CV5) | Scoping Study | Superseded | 2024-08-21 | Two-stage 800ktpa concept; net capex C$1,157M; superseded by the 2025 FS. |
| On-site refining concept study (Primero ALi) | Scoping Study | Current | 2026-06-14 | Concept-level selection of an atmospheric leach route to battery-grade carbonate; not a PEA and not in the base project. |
d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)
Stock database
Other assets
- Investee
- Loyal Metals Ltd (ASX-listed) shares received for the Northwest Territories interest
- Holding
- —
- Shares held
- 8.00m
- Market value
- —
- % of holder's market cap
- —
- Cost basis
- C$833.0k
Funding, performance and ownership
Financials & Capital
Liquidity
Financial position
Funded through the updated FS, PEA, ESIA review and detailed engineering to FID; no debt or committed project finance. The C$1.5B net development capex will need project debt (non-binding EDC, KfW IPEX and Societe Generale support), strategic equity (Volkswagen cornerstone option) and new shares.
Capital structure
Ownership and dilution
- Ordinary shares
- 1.9B
- Fully diluted
- 2B
162,250,235 shares at 31 March 2025 + 19,931,110 February 2026 cash issues and other FY2026 issues (Pikwa 841,916; Volkswagen 89,125; options 520,000; settlements) = 183,802,875 at 31 March 2026; + 2,095,745 Volkswagen (21 May 2026) + 44,181 compensation and unit settlements = 185,942,801 at 30 June and 12 August 2026. All counts are multiplied by 10 to the ASX CDI basis. No warrants; no buy-back.
Security classes5
| Class | Type | Quantity | Strike | Expiry |
|---|---|---|---|---|
| Common shares (185,942,801) expressed as CDI equivalents | Ordinary Share | 1.9B | — | — |
| Stock options (8,528,016 at weighted C$6.22, 2.64 years) as CDI equivalents; strike per CDI C$0.622 | Option | 85.3M | A$0.622 | — |
| Restricted share units (1,712,143) as CDI equivalents | Performance Right | 17.1M | — | — |
| Performance share units (1,712,143) as CDI equivalents | Performance Right | 17.1M | — | — |
| Deferred share units (332,440) as CDI equivalents | Performance Right | 3.3M | — | — |
Actuals and forecasts
Financial statements
| AUD | Unit | Trend | FY2025AA | FY2026AA |
|---|---|---|---|---|
| Operations | ||||
| Spodumene concentrate sold (SC5.5) | t | 0.00 | 0.00 | |
| Li2O in concentrate | t | 0.00 | 0.00 | |
| Profit and loss | ||||
| Revenue | AUDm | 0.0 | 0.0 | |
| Corporate costs, studies and pre-FID spend | AUDm | 13.4 | 15.5 | |
| EBITDA | AUDm | (13.4) | (15.5) | |
| Income tax expense (project-level, unlevered) | AUDm | 12.7 | 3.6 | |
| Net profit after tax | AUDm | (6.9) | (12.1) | |
| Cash flow | ||||
| Operating cash flow | AUDm | (7.3) | (8.2) | |
| Capex (actual: exploration, studies, camp and road) | AUDm | 118.0 | 57.4 | |
| Free cash flow | AUDm | (125.2) | (65.6) | |
| Equity raised (net) | AUDm | 156.6 | 145.6 | |
| Debt drawn less repaid | AUDm | 0.0 | 0.0 | |
| Balance sheet | ||||
| Cash | AUDm | 112.8 | 181.5 | |
| Debt | AUDm | 0.0 | 0.0 | |
| Net debt (cash) | AUDm | (112.8) | (181.5) | |
| Per share | ||||
| CDI-equivalent shares (common x 10) | m shares | 1,622.5 | 1,838.0 | |
| EPS per CDI | AUD/share | (0.00) | (0.01) | |
| Multiples and ratios | ||||
| EV / EBITDA (x, current EV) | x | (31.6) | (27.3) | |
| P / E (x, current market cap) | x | (87.1) | (50.0) | |
| FCF yield (current market cap) | % | -20.7% | -10.9% | |
| EBITDA margin | % | — | — | |
| Net debt / EBITDA (x) | x | 8.4 | 11.7 | |
KPI history
Operating metrics
Operating metric source table21
| Metric | Project | Period | Period type | Value | Status |
|---|---|---|---|---|---|
| Cash and cash equivalents | Company | Cash at 2025-03-31 | Point In Time | 101,173,000 CAD | Reported |
| Cash and cash equivalents | Company | Cash at 2025-06-30 | Point In Time | 82,813,000 CAD | Reported |
| Cash and cash equivalents | Company | Cash at 2025-09-30 | Point In Time | 61,204,000 CAD | Reported |
| Cash and cash equivalents | Company | Cash at 2025-12-31 | Point In Time | 51,262,000 CAD | Reported |
| Cash and cash equivalents | Company | Cash at 2026-03-31 | Point In Time | 174,227,000 CAD | Reported |
| Cash and cash equivalents | Company | Cash at 2026-06-30 | Point In Time | 176,192,000 CAD | Reported |
| Borrowings (none) | Company | Debt at 2026-03-31 | Point In Time | 0 CAD | Reported |
| Borrowings (none) | Company | Debt at 2026-06-30 | Point In Time | 0 CAD | Reported |
| Investing cash outflow (exploration, studies, camp and road) | Company | FY2025 (year to 31 Mar 2025) | Year | 107,032,000 CAD | Reported |
| Investing cash outflow (exploration, studies, camp and road) | Company | FY2026 (year to 31 Mar 2026) | Year | 52,430,000 CAD | Reported |
| Investing cash outflow for the quarter | Company | Quarter to 30 Jun 2026 | Quarter | 9,858,000 CAD | Reported |
| Operating cash flow | Company | FY2025 | Year | -6,614,000 CAD | Reported |
| Operating cash flow | Company | FY2026 | Year | -7,540,000 CAD | Reported |
| FS LOM average spodumene concentrate production (study forecast) | Shaakichiuwaanaan | FS life of mine average | Other | 693,800 t/yr SC5.5 | Source Derived |
| FS nominal spodumene concentrate production (study forecast) | Shaakichiuwaanaan | FS nominal rate | Other | 801,600 t/yr SC5.5 | Source Derived |
| FS average Li2O recovery (DMS only) | Shaakichiuwaanaan | FS life of mine average | Other | 68.9 % | Source Derived |
| FS average feed grade | Shaakichiuwaanaan | FS life of mine average | Other | 1.26 % Li2O | Source Derived |
| FS nominal process plant feed rate (two 2.5 Mtpa trains) | Shaakichiuwaanaan | FS nominal plant feed | Other | 5,100,000 t/yr ore | Source Derived |
| FS LOM AISC (DAP Grande-Anse) per tonne of SC5.5 | Shaakichiuwaanaan | FS life of mine | Other | 799.8 CAD/t SC5.5 | Source Derived |
| FS LOM total cash operating cost per tonne of SC5.5 | Shaakichiuwaanaan | FS life of mine | Other | 729.1 CAD/t SC5.5 | Source Derived |
| DMS-only pilot plant recovery producing 6.1% Li2O concentrate | Shaakichiuwaanaan | DMS pilot (quarter to 30 Jun 2026) | Point In Time | 89 % | Reported |
Company guidance5
| Metric | Project | Period | Low | High | Status |
|---|---|---|---|---|---|
| Final Investment Decision | shaakichiuwaanaan | End of calendar 2027 (2H 2027) | — | — date | Current |
| First Production (Company Pathway) | shaakichiuwaanaan | 2029; Phase 1 commercial production 2030, Phase 2 2032 | — | — date | Current |
| Spodumene Concentrate Capacity (Sc5.5) | shaakichiuwaanaan | Phase 1 open pit ~400ktpa; Phase 1+2 nominal 801.6ktpa | 400,000 | 801,600 t/yr | Current |
| Updated Cv5 Lithium Tantalum Fs, Cv5+Cv13 Pea And Mre 5 | shaakichiuwaanaan | Q4 calendar 2026 | — | — date | Current |
| Development Capital (Initial + Expansion, Before Credits) | shaakichiuwaanaan | FS 2025 (net C$1,509.9M after pre-production credit and tax credits) | 1,978,200,000 | 1,978,200,000 CAD | Current |
Capital history
Capital events
| Date | Event | Amount | Shares | Price | Status | Terms |
|---|---|---|---|---|---|---|
| 2026-05-21Ann. 2026-05-19 | RaisingCommon Shares | C$11.9M | 2.1M | C$5.66 | Completed | Volkswagen delayed participation in the February 2026 offerings under its investor rights. |
| 2026-02-19Ann. 2026-02-10 | RaisingCommon And Charity Flow Through Shares | C$138M | 19.8M | C$5.66 | Completed | Public offering 11,484,099 shares + 1,365,631 over-allotment at C$5.66 (~C$72.7M) and 6,992,255 charity flow-through shares at ~C$9.30 (C$65M). |
| 2025-12-18 | RaisingCommon Shares | C$359K | 89.1K | C$4.03 | Completed | Volkswagen top-up subscription under its Investor Rights Agreement. |
| 2025-11-28Ann. 2025-11-12 | RaisingCommon Shares | C$3.1M | 841.9K | C$3.68 | Completed | Shares issued to Azimut Exploration and SOQUEM as consideration for the Pikwa Property (509 claims). |
| 2025-01-21Ann. 2024-12-18 | RaisingCommon Shares | C$68.9M | 15.6M | C$4.42 | Completed | Volkswagen Finance Luxemburg strategic placement (US$48M), 9.9% post-money, with PowerCo offtake term sheet and investor rights. |
Contracts and ownership
Material economic arrangements These are deals that can affect sales, costs, funding or ownership. An arrangement marked “Included in valuation” may already be built into a project estimate or the bridge to shareholder value. A separate amount is shown only when one can be estimated; do not add it again.
Royalties from the AIF claim-block schedule, the PowerCo offtake and Volkswagen investor rights from the December 2024 release and the FS, Albemarle from the AIF. Non-binding letters (EDC, KfW IPEX, Societe Generale, Cree Nation of Chisasibi LOI, Matagami transshipment LOI) and testwork MoUs (Koch, Mitsui/MWCC, Primero) carry no economic terms and are excluded; no hedges exist.
2% NSR over 76 of the 172 Corvette Main claims, no buy-back; one of the claim-block royalties the FS captures as a single 2% royalty on CV5 revenue.
Royalty · Active- Counterparties
- DG Resource Management Ltd.
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium · Others
- Economic direction
- Burden
- Period
- Dates not stated
- Key terms
- NSR rate: 2 %
Claims covered: 76 claims of 172 (Corvette Main)
Buy-back: none
No valuation treatment is available for this arrangement.
2% NSR on all non-precious products over the 111 FCI East and West claims (sliding 1.5-3.5% on precious metals), aggregate royalty capped at 3.5%, no buy-back.
Royalty · Active- Counterparties
- Osisko Gold Royalties Ltd
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium · Others
- Economic direction
- Burden
- Period
- Dates not stated
- Key terms
- NSR rate on non-precious products: 2 %
Precious-metal sliding scale: 1.5-3.5%
Aggregate cap with other royalties: 3.5 %
Claims covered: 111 claims (FCI East and West)
No valuation treatment is available for this arrangement.
2% NSR on 50 of 51 Deca-Goose and Felix claims; PMET may buy back half for C$2M.
Royalty · Active- Counterparties
- 9219-8845 Québec Inc. (Canadian Mining House)
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium · Others
- Economic direction
- Burden
- Period
- Dates not stated
- Key terms
- NSR rate: 2 %
Buy-back of half: 2,000,000 CAD
Claims covered: 50 claims (Deca-Goose and Felix)
No valuation treatment is available for this arrangement.
2% NSR on the 39 JBN-57 claims acquired from Azimut in May 2024, no buy-back.
Royalty · Active- Counterparties
- Azimut Exploration Inc.
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium · Others
- Economic direction
- Burden
- Period
- From 2024-05-17; no end date stated
- Key terms
- NSR rate: 2 %
Claims covered: 39 claims (JBN-57)
No valuation treatment is available for this arrangement.
Binding offtake term sheet for 100ktpa SC5.5 over 10 years priced off market indices with modifying factors that recognise Volkswagen's strategic investment; conditional on FID, approvals and Stage 1 commissioning by 30 June 2031.
Offtake · Conditional- Counterparties
- PowerCo SE (Volkswagen Group)
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium
- Economic direction
- Mixed
- Period
- From 2025-01-21; no end date stated
- Key terms
- Annual volume: 100,000 t/yr SC5.5
Term: 10 years (+5 by mutual agreement)
Pricing: indexed to lithium chemical and spodumene indices with modifying factors, regular price reviews
Conditions precedent: FID, all approvals, Stage 1 commissioning by 30 June 2031
Share of nominal output: 12.5 %
No valuation treatment is available for this arrangement.
Investor rights agreement: participation rights, technical advisory committee seat, 24-month standstill and the opportunity to act as cornerstone investor at FID in return for additional offtake; non-binding PowerCo MoU on downstream collaboration.
Strategic Partnership · Active- Counterparties
- Volkswagen Finance Luxemburg S.A. · PowerCo SE
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium
- Economic direction
- Benefit
- Period
- From 2025-01-21; no end date stated
- Key terms
- Holding after three subscriptions: 17,742,370 shares
Participation right: pro rata in future equity raises
Standstill: 24 months
FID cornerstone option: opportunity to fund at FID for additional offtake on terms to be agreed
No valuation treatment is available for this arrangement.
Albemarle invested ~C$109M in August 2023; the non-binding hydroxide MoU concluded in May 2024 and was not extended; the 12-month investor rights lapsed.
Strategic Partnership · Expired- Counterparties
- Albemarle Corporation
- Applies to
- Shaakichiuwaanaan Project (CV5 and CV13 pegmatites) · Lithium
- Economic direction
- Benefit
- Period
- 2023-08-03 to 2024-05-15
- Key terms
- Investment: 109,000,000 CAD
No valuation treatment is available for this arrangement.
Intrinsic value
Valuation
Bear, base and bull values, investment cases, project valuations and the equity bridge are available to subscribers.
Sign in or enter a guest codeResource-price transmission
Sensitivity lab
How our fair value responds to commodity prices and other drivers is available to subscribers.
Sign in or enter a guest codePeople, delivery and responsibility
Management background checks
Screening-level review of the selected 31 October 2026 V8.1 roster. Dated AIF appointments now anchor the CEO, CFO, exploration EVP, CDO/COO and commercial EVP roles. Current issuer pages use different title wording for Garoute, Mercier-Langevin and Barrasso, and omit O’Hara; the selected roster is retained with those status/title gaps explicit. Post-cutoff issuer updates report a federal access-road contribution and drilling progress, but neither establishes personal causation or a new delivered project outcome.
Decision-relevant facts
Material summary
Kenneth Brinsden
President, Chief Executive Officer and Managing Director
Pilgangoora moved from first drill hole to production in under four years
Pilbara Minerals’ 2020 annual report says the Pilgangoora lithium-tantalum project progressed from first drill hole to production in under four years. Brinsden had been CEO from January 2016 and MD from May 2016. This is a company-reported project outcome during his tenure, not independently quantified personal causation.
Role overlaps event; causation unproven · He led the issuer during the project development period; no claim that he alone caused the result is made.
Evidence gaps · 3
- Full role chronology, earlier employers and dates were not independently established in this limited pass.
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
Natacha Garoute
Chief Financial Officer
No supported material findings selected. See this executive’s report and evidence gaps.
Evidence gaps · 3
- Full role chronology, earlier employers and dates were not independently established in this limited pass.
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
Darren L. Smith
Executive Vice President of Exploration
Issuer credits Smith with two major discoveries
PMET says Smith was instrumental in the 2009 discovery of the Ashram rare-earth/fluorspar deposit and in 2017 led the team that identified the Corvette (now Shaakichiuwaanaan) district containing CV5 and CV13. These are issuer-reported role contributions; independent discovery attribution was not separately investigated.
Individual involvement documented · The issuer biography expressly credits him with instrumental/lead roles.
Evidence gaps · 3
- Full role chronology, earlier employers and dates were not independently established in this limited pass.
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
Frédéric Mercier-Langevin
Chief Development Officer / Chief Operating Officer
No supported material findings selected. See this executive’s report and evidence gaps.
Evidence gaps · 3
- Full role chronology, earlier employers and dates were not independently established in this limited pass.
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
Mathew O'Hara
Company Secretary (Australia)
No supported material findings selected. See this executive’s report and evidence gaps.
Evidence gaps · 3
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
- The reviewed PMET/ASX records establish the Australian company-secretary appointment only; prior legal/accounting roles and credentials were not found.
Alex Eastwood
Executive Vice President - Commercial
Commercial role through Pilbara Minerals growth milestones
PLS said Eastwood joined as a founding executive in July 2016 and led legal/commercial strategies through project finance, spodumene sales/offtake, the BMX platform and POSCO/JV milestones, leaving effective 24 November 2023. This is issuer attribution to a senior commercial/legal leader; outcomes are not independently benchmarked here.
Individual involvement documented · PLS expressly described his role and contribution.
Evidence gaps · 3
- Full role chronology, earlier employers and dates were not independently established in this limited pass.
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
Grace Barrasso
Executive Vice President, ESG and Corporate Affairs
No supported material findings selected. See this executive’s report and evidence gaps.
Evidence gaps · 3
- Credentials and memberships were not independently verified.
- The searches documented here are open-web screening only, not exhaustive criminal, sanctions, litigation, safety or credential checks.
- Issuer biography lists ArcelorMittal Mining and Mines Canada roles but supplies no dates or specific project outcome; no degree is stated in the reviewed profile.
Company ownership
Investors & shareholders
Registered shareholder list unavailable
The available disclosures below do not provide a complete ranked register.
Sources & review notesEvidence checked through 2026-10-09
Coverage and limitations
- The cited filing does not provide a reliably extracted registered ordinary-shareholder top-20 table. The register is therefore unavailable.
- Substantial-holder notices in the local cache were not exhaustively reconciled for this ticker; no current substantial-holder quantities are asserted. Nominee/custodian beneficial ownership is not visible without underlying disclosures.
Sources
- PMET Files Amended Version of its NI 43-101 Technical Report
ASX / PMET Resources Inc. · Published 2026-10-05 · Accessed 2026-10-09
Issuer filing reviewed as part of ownership-source coverage. A reliable ranked ordinary-shareholder table was not extracted from this source.
2026/2026-10-05_PMET Files Amended Version of its NI 43-101 Technical Report.pdf; filing review
Disclosed activity
Insider transactions
Trading activity4 buys · 0 sells shownNet cash last 12 months C$12.2mShow chartHide chart
| Date | Person / account | Activity / security | Quantity | Cash consideration | Price | Holding after |
|---|---|---|---|---|---|---|
| 2026-05-21 | Volkswagen Finance Luxemburg S.A.
Details & evidence for Volkswagen Finance Luxemburg S.A. on 2026-05-21As disclosed: VW private placement closed 21 May 2026 for 2,095,745 shares at $5.66 each, approximately $12 million.
Notice of Annual General Meeting/Proxy Form ↗ | SubscriptionOrdinary shares | 2,095,745 | CAD 11,861,916.70 | CAD 5.66Disclosed price | — |
| 2025-12-18 | Volkswagen Finance Luxemburg S.A.
Details & evidence for Volkswagen Finance Luxemburg S.A. on 2025-12-18As disclosed: VW accepted and was issued 89,125 shares at $4.03 per share; AGM circular describes approximately $359,000 proceeds.
Notice of Annual General Meeting/Proxy Form ↗ | SubscriptionOrdinary shares | 89,125 | CAD 359,173.75 | CAD 4.03Disclosed price | — |
| 2025-01-21 | Volkswagen Finance Luxemburg S.A.
Details & evidence for Volkswagen Finance Luxemburg S.A. on 2025-01-21As disclosed: VW subscribed for 15,557,500 ordinary shares; issuer announcement says investment closed 21 January 2025.
Becoming a Substantial Holder - Volkswagen ↗ Patriot Announces Closing of C$69M Strategic Investment ↗ | SubscriptionOrdinary shares | 15,557,500 | USD 48,000,000.00 | USD 4.42Disclosed price | — |
| 2023-08-03 | Albemarle Corporation
Details & evidence for Albemarle Corporation on 2023-08-03As disclosed: Albemarle subscribed for 7,128,341 ordinary shares at C$15.29 per share; AGM circular confirms completion on 3 August 2023.
Becoming a Substantial Holder - Albemarle Corporation ↗ Notice of Annual General Meeting/Proxy Form ↗ | SubscriptionOrdinary shares | 7,128,341 | CAD 109,093,134.89 | CAD 15.29Disclosed price | — |
Disclosed holding observations2 dated positions
Initial, final and threshold notices describe positions; these are not counted as purchases or sales.
| Holding at | Person / group | Type / security | Quantity | Percentage |
|---|---|---|---|---|
| 2025-01-21 | Volkswagen Finance Luxemburg S.A.
Details & evidence for Volkswagen Finance Luxemburg S.A. on 2025-01-21
Becoming a Substantial Holder - Volkswagen ↗ | ThresholdOrdinary shares | 15,557,500 | 9.90%Voting Power |
| 2023-08-03 | Albemarle Corporation
Details & evidence for Albemarle Corporation on 2023-08-03
Becoming a Substantial Holder - Albemarle Corporation ↗ | ThresholdOrdinary shares | 7,128,341 | 6.40%Voting Power |
The closest covered peers
Peer comparison
Peer comparison pending
An on-demand analysis selects up to five closest peers and checks what their differences mean for independent fair value.
Narrative and provenance
Research & Sources
The full analyst report, its figures and the broker-style PDF are available to subscribers and invited guests.
Sign in or enter a guest codeChronological evidenceSource-document inventory28 documents
Market snapshot (miners.v8db.market_snapshot PMT --cutoff 2026-10-31 --shares 1859428010 --commodities Li2O)Market Data · HighExtracted
Local snapshot at the cutoff: close A$0.325 (30 Oct 2026); 52-week range A$0.30-0.795; returns 1m -26.1%, 3m -23.5%, 6m -48.0%, 12m -16.7%, 3y -71.7% (relative to the mining index -16.0, -19.0, -37.2, -25.5 and -112.2 points); 20-day average traded value A$0.88M (60-day A$1.01M); market cap A$604.3M on 1,859.4M CDI-equivalents; AUD per USD 1.4236; no Li2O spot in the price deck and no published lithium peer in the stock database (peers added from outside research).
- Document ID
- snapshot-20261031
- Published UTC
- 2026-10-30T22:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
AUD cross rates 30 October 2026 (local metal_prices.db fx_daily, ECB reference)Market Data · HighExtracted
A$1 = US$0.7025, C$0.9813, CNY4.6734 on 30 October 2026 (ECB reference); implied US$1 = C$1.397; 12-month averages A$1 = US$0.6959 and C$0.9666.
- Document ID
- fx-20261030
- Published UTC
- 2026-10-30T14:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Insider dealings (python -m miners.insider_transactions show PMT)Governance · MediumExtracted
Local insider database: no on-market director buying since December 2025 (Desrochers 2,400 shares at C$5.00); director Blair Way sold 264,000 shares at C$4.75 in December 2025 and has pledged CDIs as loan collateral (Equities First); CEO Brinsden takes part of salary and STIP in shares (8,411 shares April 2026, 71,972 STIP shares November 2025) and bought 200,000 CDIs at A$1.21 in October 2023; Jennings exercised 500,000 options at C$2.58 in November 2025.
- Document ID
- insiders-pmt
- Published UTC
- 2026-10-30T22:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMT.AX ASX close 30 October 2026 (miners.reference_price)Market Data · HighExtracted
Local reference-price lookup `python -m miners.reference_price PMT --valuation-date 2026-10-31`: raw ASX close A$0.325 per CDI on 2026-10-30 (open 0.33, high 0.33, low 0.32), volume 1,314,318 CDIs, provider market data provider via miners.collect_stock_prices, security basis one ASX PMT CDI (10 CDIs = 1 common share), freshness 1 day, status fresh.
- Document ID
- px-close-20261030
- Published UTC
- 2026-10-30T05:10:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Guangzhou Futures Exchange lithium carbonate settlement history to 29 October 2026 (local metal_prices.db, series gfex:lc)Commodity Data · HighExtracted
GFEX lithium carbonate settlement CNY91,140/t on 2026-10-29 (VAT-inclusive), down from a May 2026 average of CNY189,051 and CNY159,960 on 1 September 2026; monthly averages CNY60,522 (Jun 2025), 77,286 (Oct 2025), 157,388 (Jan 2026), 189,051 (May 2026), 135,567 (Sep 2026), 101,408 (Oct 2026). Ex-VAT at CNY6.65 per USD this is about US$12,100/t LCE.
- Document ID
- gfex-li-20261029
- Published UTC
- 2026-10-29T07:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
ASX lithium peer closes and share counts (local asx_mining_companies.db, 30 October 2026)Market Data · MediumExtracted
Local ASX database closes on 2026-10-30 and 12 months earlier: PLS A$2.64 (A$3.30), LTR A$0.62 (A$1.145), ELV A$3.19 (A$3.89), CXO A$0.21 (A$0.12), DLI A$0.15 (A$0.175), GL1 A$0.925 (A$0.53), WC8 A$0.215 (A$0.215); shares implied from the database market capitalisation and price at the 9 August 2026 refresh.
- Document ID
- peers-asx-20261030
- Published UTC
- 2026-10-30T06:10:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMET Advances Shaakichiuwaanaan DevelopmentOperations · MediumExtracted
October 2026 development update (retrieved for this run): more than 30,000 m in over 250 holes in the 2026 programme, seven rigs, geotechnical/hydrogeological drilling confirms ground conditions, CV5 caesium infill for a maiden CV5 caesium MRE in 2027, assays through Q1 2027, MRE-5 imminent and updated CV5 lithium-tantalum FS plus CV5-CV13 PEA on track for Q4 2026, MRE-6 in 2H 2027.
- Document ID
- dev2610
- Published UTC
- 2026-10-20T22:21:45Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Local management assessment (management/PMT/summary.md and background-check.json)Leadership · MediumExtracted
Repository management screening (dated before the cutoff): CEO Ken Brinsden (ex-CEO Pilbara Minerals, Pilgangoora first drill to production in under four years), CFO Natacha Garoute (ex-CFO Champion Iron Ore), EVP Exploration Darren Smith (credited with the Corvette/CV5 discovery), CDO/COO Frederic Mercier-Langevin (ex-COO Wesdome, ex-GM Meliadine), EVP Commercial Alex Eastwood (ex-PLS commercial/legal), EVP ESG Grace Barrasso, company secretary Mathew O'Hara; screening score 41/100 with low evidence confidence. Claims checked against the AIF.
- Document ID
- mgmt-pmt
- Published UTC
- 2026-10-09T00:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Local investor register (ownership/PMT/investors.json, reviewed 9 October 2026)Governance · MediumExtracted
Repository register snapshot records no reliable top-20 register and no current substantial-holder quantities; ownership is therefore built from issuer disclosures (Volkswagen 17,742,370 shares from its three subscriptions, ~9.5%; Albemarle 7,128,341 shares subscribed in 2023, current holding unconfirmed; directors and officers 3.7%) and the June 2026 register mix.
- Document ID
- ownership-pmt
- Published UTC
- 2026-10-09T00:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMET Files Amended Version of its NI 43-101 Technical ReportStudy · MediumExtracted
Amended NI 43-101 technical report filed after an AMF continuous-disclosure review (qualified-person certificates, map scaling, RPEEE clarification for caesium, tantalum and gallium, caesium cut-off); no change to the FS economic or technical conclusions.
- Document ID
- ni2610
- Published UTC
- 2026-10-04T21:14:39Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Lithium price tracker citing Benchmark Mineral Intelligence SC6 assessment (Axis Intelligence, updated 3 October 2026)Commodity Data · MediumExtracted
Secondary aggregator citing a Benchmark Mineral Intelligence SC6 FOB Australia assessment of about US$2,254/t (range 2,205-2,302) dated 2 September 2026, when GFEX lithium carbonate settled near CNY160,000. Used only to scale the spodumene spot estimate to the late-October carbonate price; not verified against the primary Benchmark publication.
- Document ID
- spod-bmi-202609
- Published UTC
- 2026-10-03T00:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMET Resources Site Visit Presentation - September 2026Presentation · MediumExtracted
September 2026 site-visit presentation: permitting path (ESIA submitted March 2026, decision window end 2027/early 2028), pathway chart with FID 2H 2027 and first production 2029, C$176M cash, caesium and tantalum market slides.
- Document ID
- site2609
- Published UTC
- 2026-09-20T22:37:34Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
30 June 2026 Quarterly Financial Statements and MD&AResults · HighExtracted
Interim statements and MD&A for the quarter to 30 June 2026: cash C$176.2M, no debt, leases C$0.24M, equity C$438.9M, quarter loss C$2.1M, operating cash flow +C$1.69M (after a C$9.5M tax-credit refund), investing -C$9.86M; 185,942,801 shares at 30 June and 12 August 2026; 8,528,016 options, 1,712,143 RSUs, 1,712,143 PSUs, 332,440 DSUs; Volkswagen 2,095,745 shares at C$5.66; non-binding letters of support (EDC, KfW IPEX, another Canadian institution) and Societe Generale letter of interest; ESIA submitted March 2026; outlook: updated CV5 FS and CV5+CV13 PEA late 2026, FID by end of calendar 2027.
- Document ID
- q1fy27
- Published UTC
- 2026-08-14T01:03:09Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Albemarle auction result: 14,700 dmt spodumene concentrate sold at CIF SC6 US$2,113/t (SMM, July 2026)Commodity Data · MediumExtracted
SMM report that a 14,700 dmt lot of ~5.5% Wodgina concentrate sold at US$2,113/t CIF on an SC6 basis on 30 July 2026, when GFEX carbonate averaged about CNY150,000; earlier 2026 auctions US$2,018 (March) and US$2,704.5 (May). Used for the SC6-to-carbonate ratio.
- Document ID
- alb-auction-202607
- Published UTC
- 2026-07-30T08:00:00Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMET Resources Corporate Presentation - June 2026Presentation · MediumExtracted
June 2026 corporate presentation: capital structure (185.9M basic, 12.5M dilutive, 198.4M fully diluted; market cap C$1.1B at 18 June 2026; cash C$174M), pro-forma register mix (corporate 16%, HNW/family office 16%, institutional 27%, retail 13%, insiders 3%, CDS/other 25%), targeted commercial production Phase 1 2030 and Phase 2 2032.
- Document ID
- corp2606
- Published UTC
- 2026-06-25T01:38:13Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Annual Financial Statements and MD&A for FYE 31 March 2026Results · HighExtracted
Audited FY2026 (year to 31 March 2026) statements and MD&A, retrieved for this run: cash C$174.2M (C$101.2M), no borrowings, leases C$0.27M, equity C$425.4M; loss C$11.06M (C$6.30M); operating cash flow -C$7.54M (-C$6.61M); investing -C$52.43M (-C$107.03M); 183,802,875 shares at 31 March 2026 (162,250,235 at 31 March 2025); C$138M February 2026 raise; Volkswagen 2,095,745 shares after year end.
- Document ID
- afs26
- Published UTC
- 2026-06-21T22:13:40Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Annual Information Form for FYE 31 March 2026Governance · HighExtracted
Annual Information Form FY2026: corporate history (Rio Grande Mining 2007, 92 Resources, Gaia Metals, Patriot Battery Metals 2021, PMET Resources 2025), three-year history (Albemarle C$109M at C$15.29 in 2023, C$75M flow-through at C$14.54 in 2024, Volkswagen C$69M at C$4.42 in January 2025, Pikwa acquisition, C$138M February 2026 raise), royalty schedule by claim block, no dividends ever paid, CDI 10:1 ratio, monthly TSX/ASX price ranges, directors and officers with biographies, equity awards.
- Document ID
- aif26
- Published UTC
- 2026-06-21T22:13:50Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Concept Study Identifies Potential Refining PathwayStudy · MediumExtracted
Concept study (not a PEA/PFS/FS) selecting Primero ALi atmospheric leach as the preferred on-site refining pathway; bench testwork produced 99.8% Li2CO3; staged longer-term opportunity not required for the base concentrate project.
- Document ID
- refine2606
- Published UTC
- 2026-06-14T22:49:24Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Closing of Flow-Through Private Placement & Public OfferingFinancing · HighExtracted
Closing of the February 2026 offerings for ~C$138M: 11,484,099 common shares at C$5.66 plus 1,365,631 over-allotment shares, and 6,992,255 charity flow-through shares at ~C$9.30 re-offered on the ASX at A$0.59 per CDI; proceeds fund the updated CV5 FS with tantalum and the CV13 PEA.
- Document ID
- close2602
- Published UTC
- 2026-02-19T21:23:36Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMET Announces Up To Aggregate C$130 Million FinancingsFinancing · MediumExtracted
February 2026 financing announcement: public offering at C$5.66 and charity flow-through placement at ~C$9.30 for up to C$130M aggregate.
- Document ID
- fin2602
- Published UTC
- 2026-02-09T21:18:37Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
31 December 2025 Quarterly Financial Statements and MD&AResults · MediumExtracted
Interim statements for the quarter to 31 December 2025: cash C$51.3M, listed shares C$2.4M, no flow-through liability.
- Document ID
- q3fy26
- Published UTC
- 2026-02-03T03:50:05Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
30 September 2025 Quarterly Financial Statements and MD&AResults · MediumExtracted
Interim statements and MD&A for the quarter to 30 September 2025: quarter-end cash C$61.2M; six-month operating cash flow -C$7.0M and investing -C$32.8M.
- Document ID
- q2fy26
- Published UTC
- 2025-11-07T01:32:54Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMT Delivers Positive CV5 Lithium Only Feasibility StudyStudy · HighExtracted
Feasibility study release (CV5 lithium-only) with Table 1 economics (after-tax NPV8% C$1,594M, IRR 18.06%), Table 3 capex (C$1,497.7M initial, C$480.5M expansion, C$936.4M sustaining, C$101.7M pre-production credit, C$359.8M CTM-ITC and C$57.1M TCRR credits), Table 4 costs (C$729.1/t total cash cost, C$799.8/t AISC SC5.5), 84.3Mt at 1.26% Li2O Probable reserve, consolidated MRE (108.0Mt at 1.40% Li2O Indicated, 33.4Mt at 1.33% Inferred), sensitivity tornado, 2% royalty, 8% real discount rate, C$18,371M LOM net revenue and FID targeted 2H 2027.
- Document ID
- fs25
- Published UTC
- 2025-10-20T21:56:50Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Shaakichiuwaanaan Project - Feasibility Study PresentationStudy · MediumExtracted
Feasibility study presentation: PEA-to-FS capex bridge (net capex C$1,510M vs C$1,157M), AISC comparison, post-tax NPV8 sensitivity tornado (price +/-20%: C$2,686M / C$399M), EBITDA of C$127M at US$700/t SC5.5, FID end 2027 and commissioning from late 2029. All pages image-classified; figures read from rendered pages.
- Document ID
- fspres25
- Published UTC
- 2025-10-20T22:00:15Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Patriot Battery Metals Announces Board ChangesLeadership · LowExtracted
Board change: appointment of Aline Cote as independent director (30 July 2025).
- Document ID
- board2507
- Published UTC
- 2025-07-30T22:14:23Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Strategic Investment & Offtake with Volkswagen and PowerCoEconomic Arrangement · HighExtracted
Volkswagen strategic investment (15,557,500 shares at C$4.42, ~C$69M, 9.9%), binding PowerCo offtake term sheet for 100,000 tpa SC5.5 over 10 years (+5 by agreement) priced off lithium chemical and spodumene indices with modifying factors, conditional on FID, approvals and Stage 1 commissioning by 30 June 2031; investor rights incl. participation rights, 24-month standstill, cornerstone FID funding option for additional offtake.
- Document ID
- vw2412
- Published UTC
- 2024-12-18T07:57:44Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Preliminary Economic Assessment on Shaakichiuwaanaan ProjectStudy · MediumExtracted
Superseded August 2024 PEA (two-stage CV5 development, ~800ktpa, Stage 1 capex C$761M) used for history and the PEA-to-FS capex bridge.
- Document ID
- pea2408
- Published UTC
- 2024-08-21T22:42:40Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
PMT Announces Closing of C$109M Investment with AlbemarleFinancing · LowExtracted
Closing of Albemarle private placement (~C$109M, 7,128,341 shares at C$15.29) in August 2023; MOU on downstream hydroxide later expired (May 2024).
- Document ID
- alb2308
- Published UTC
- 2023-08-03T22:22:18Z
- Projects
- shaakichiuwaanaan
- Commodities
- lithium
Evidence facts27
1594000000 CAD
2025-10-2018.06 %
2025-10-202514000000 CAD
2025-10-205,418 / 8,358 CAD million
2025-10-201,497.7 / 480.5 / 936.4 CAD million
2025-10-20101.7 / 359.8 / 57.1 CAD million
2025-10-20511.9 / 217.2 / 799.8 CAD/t
2025-10-201221 USD/t
2025-10-201.34 CAD/USD
2025-10-2084.3 Mt at 1.26% Li2O (1.06 Mt Li2O) text
2025-09-112 %
2025-10-20174227000 CAD
2026-03-31-11057000 CAD
2026-03-31183802875 common shares
2026-03-31176192000 CAD
2026-06-30185942801 common shares
2026-08-12100000 t/yr SC5.5
2024-12-184.42 CAD/share
2024-12-18138000000 CAD
2026-02-190.59 AUD/CDI
2026-02-190.325 AUD/CDI
2026-10-301314318 CDIs
2026-10-300.795 AUD/CDI
2026-10-30604314103 AUD
2026-10-3091140 CNY/t
2026-10-290.7025 USD/AUD
2026-10-300.9813 CAD/AUD
2026-10-30