OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor PNR ASX

Pantoro Gold Limited

Producer · Gold · AU Rating locked: sign in to view v8.1 · pnr-20261031t210611-full
Last 2026-11-06
A$3.06
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$1.2B
EV
A$952.3M
Cash
A$224.7M
Debt
A$0
1 newer ASX announcement not yet reflected in this valuation

Portfolio detail

Assets

2 assets

Core asset

Norseman Gold Project

AU

Producer100% ownedGoldSilver

Producing from the Scotia and OK underground mines and the Gladstone and Green Lantern open pits through a 1.2 Mtpa CIL plant (two of three upgrade stages towards 1.4-1.5 Mtpa complete); Bullen/Mainfield underground in development; third-party ore from Mega Resources (Rama) under an ore purchase agreement.

Producer · Producer
Production annualised (attributable)
87.5k ozd
Production (last FY, 100%)
77.4k oz
AISC (latest quarter)
A$3,860/oz
AISC margin at spot
34.1%m
Delivery vs guidance
87%d
Reserve life
12.1 yrsd
Head grade
2.74 g/t

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves19
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured5.2M t2.2 g/t AuGold2026-09-29
Mineral ResourceIndicated17.9M t3.6 g/t AuGold2026-09-29
Mineral ResourceInferred20.1M t3.5 g/t AuGold2026-09-29
Mineral ResourceTotal43.2M t3.4 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)754K t9.8 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)3.6M t8.4 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)1.3M t14.4 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)754K t17.3 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)1.9M t5.5 g/t AuGold2026-09-29
Mineral ResourceTotal (by area)34.9M t1.9 g/t AuGold2026-09-29
Ore ReserveProved4.8M t1.4 g/t AuGold2026-09-29
Ore ReserveProbable8.2M t2.7 g/t AuGold2026-09-29
Ore ReserveTotal13M t2.2 g/t AuGold2026-09-29
Ore ReserveTotal (by area)674K t5.7 g/t AuGold2026-09-29
Ore ReserveTotal (by area)1.7M t5.0 g/t AuGold2026-09-29
Ore ReserveTotal (by area)4.1M t2.1 g/t AuGold2026-09-29
Ore ReserveTotal (by area)709K t2.9 g/t AuGold2026-09-29
Ore ReserveTotal (by area)440K t2.3 g/t AuGold2026-09-29
Ore ReserveTotal (by area)5.4M t0.9 g/t AuGold2026-09-29
Tenements1
norseman-leasesGranted800 km2 · No expiry supplied
Milestones5
  1. Updated five-year plan including Racetrack

    Pending · High materiality

  2. Gladstone Stage 3 ore production

    Pending · Medium materiality

  3. O'Briens Reef accessed from Bullen

    Delayed · Medium materiality

  4. Final plant upgrade stage to 1.4-1.5 Mtpa

    Pending · High materiality

  5. Gladstone mining centre (Stage 3 and Daisy South) complete

    Pending · Medium materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Green Lantern Stage 2 open pit approvals and clearingWestern AustraliaGranted—No
Aboriginal heritage clearances for Lake Cowan drillingWestern AustraliaGranted—No
Economic studies1
StudyStageStatusDateSummary
FY2027 budget and guidance (operating plan); updated five-year plan pendingOperating PlanCurrent2026-07-09FY2027 guidance of 90-105 koz at AISC A$2,800-3,400/oz from Scotia, OK, Gladstone, Green Lantern, initial Bullen ore and Mega ore; no life-of-mine NPV is published. A five-year plan including Racetrack is targeted for the December 2026 quarter.

Material

Racetrack discovery

AU

Discovery Drill Stage100% ownedGold

High-grade cross-link structure about 600 m north of the OK underground mine, drilled over 900 m of strike and open east and at depth; three surface diamond rigs; exploration decline from OK started late in the September 2026 quarter, due by the end of the March 2027 quarter; maiden Mineral Resource targeted for 2027.

Exploration · Discovery drill stage
Ownership
100%
Commodity
Aur
Country
AUr
Best recent intercept (grade x width)
1,725 g/t*md
Metres drilled (12M)
—
Exploration spend (12M)
—
Milestones2
  1. Racetrack exploration decline from OK complete

    Pending · Medium materiality

  2. Maiden Racetrack Mineral Resource

    Pending · High materiality

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Stock database

Other assets

Plants, holdings and assets valued inside a project
Halls Creek 1% royalty (capped at A$1m) and deferred consideration · Royalty / stream · Pre production
Royalty type
—
Rate
1%
Underlying asset and operator
Halls Creek Project (Kimberley Minerals Group)
Operator's stage
—
Attrib. royalty units per year
—
Royalty receipts (12M)
—
Our attributable value
Locked