OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor PNR ASX

Pantoro Gold Limited

Producer · Gold · AU Rating locked: sign in to view v8.1 · pnr-20261031t210611-full
Last 2026-11-06
A$3.06
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$1.2B
EV
A$952.3M
Cash
A$224.7M
Debt
A$0
1 newer ASX announcement not yet reflected in this valuation

Funding, performance and ownership

Financials & Capital

As of 2026-09-30
Cash A$224.7M2025-09-30: 181,500,000 A$2025-12-31: 216,500,000 A$2026-03-31: 250,300,000 A$2026-06-30: 223,400,000 A$2026-09-30: 240,000,000 A$ Self Funding
Debt A$0 Net cash A$224.7M
Basic shares 389.7MFY2025A: 392,812,933FY2026A: 389,718,642 2026-09-30
Runway Self Funding Operating cash flow of A$71.3m exceeded investing outflows of A$42.2m in the September 2026 quarter (Appendix 5B item 8.7 N/A).

Liquidity

Financial position

No borrowings and no facilities; lease liabilities A$70.1m at 30 June 2026 (equipment, haulage, camp). Cash and gold of A$240m cover the FY27 growth and exploration budget (about A$113m) and the remaining buy-back; October 2026 buy-backs used about A$10m. The Mega advance (A$13.7m) is due back by 31 December 2026 and A$2m of Halls Creek consideration on 29 November 2026.

Inventory composition2

Cash and gold A$240.0m at 30 September 2026: A$224.7m cash, about A$0.2m gold at the mint and 2,542 oz in circuit (A$15.2m at A$5,963.04/oz). Ore stockpiles (book A$5.8m at 30 June 2026) and stores are excluded.

Gold in circuit at the Norseman plant (2,542 oz valued at A$5,963.04/oz)
— carrying · 2,542 oz
Refined gold held at the Perth Mint (inside the A$224.9m cash and gold at mint)
— carrying

Capital structure

Ownership and dilution

Ordinary shares
389.7M
Fully diluted
394.1M

392,812,933 shares at 30 June 2025 + 1,367,974 Nebari option exercises (August 2025) - 4,462,265 bought back to 30 June 2026 = 389,718,642 (note 24); + 8,409 director salary-sacrifice shares (18 August 2026) = 389,727,051 at 30 September 2026. A further 3,336,570 shares were bought back on 6-9 October 2026 (cumulative 7,798,835 under the programme), giving about 386,390,481 shares before cancellation notices; rights add 4,391,801 nil-priced securities.

Security classes4
ClassTypeQuantityStrikeExpiry
Ordinary fully paid sharesOrdinary Share389.7M——
Unlisted employee performance rights (Tranche C, nil price)Performance Right1.9MA$02027-05-29
Unlisted employee performance rights (nil price)Performance Right631.1KA$02028-06-30
Employee share rights (nil price, service-vesting, four tranches to 2029)Other1.9MA$02029-07-31

Actuals and forecasts

Financial statements

Reported years only; our forecasts are available to subscribers
AUDUnitTrendFY2025AAFY2026AA
Operations
Plant capacity (Mtpa)Mt1.201.20
Gold produced (Norseman)ozFY2025A: 84,564 ozFY2026A: 77,408 oz84,56477,408
Profit and loss
RevenueAUDmFY2025A: 357,302,451 AUDFY2026A: 480,744,029 AUD357.3480.7
Revenue - goldAUDmFY2025A: 356,523,709 AUDFY2026A: 479,402,412 AUD356.5479.4
Site operating costs (cash, excl. leases)AUDmFY2025A: 170,953,745 AUDFY2026A: 198,663,644 AUD171.0198.7
RoyaltiesAUDmFY2025A: 11,325,546 AUDFY2026A: 15,162,710 AUD11.315.2
EBITDAAUDmFY2025A: 175,023,160 AUDFY2026A: 266,917,675 AUD175.0266.9
Depreciation and amortisationAUDmFY2025A: 102,555,882 AUDFY2026A: 103,153,631 AUD102.6103.2
EBITAUDmFY2025A: 72,467,278 AUDFY2026A: 163,764,044 AUD72.5163.8
Net finance and other itemsAUDmFY2025A: -5,925,669 AUDFY2026A: -860,942 AUD(5.9)(0.9)
Income tax expenseAUDmFY2025A: 9,885,763 AUDFY2026A: 49,726,884 AUD9.949.7
Net profit after taxAUDmFY2025A: 56,655,846 AUDFY2026A: 113,176,218 AUD56.7113.2
Cash flow
Operating cash flowAUDmFY2025A: 181,999,025 AUDFY2026A: 276,249,554 AUD182.0276.2
Total capex (incl. exploration)AUDmFY2025A: 106,739,898 AUDFY2026A: 173,307,221 AUD106.7173.3
Lease principal paymentsAUDmFY2025A: 20,298,786 AUDFY2026A: 27,385,800 AUD20.327.4
Free cash flow after leasesAUDmFY2025A: 54,960,341 AUDFY2026A: 75,556,533 AUD55.075.6
Share buy-backAUDmFY2025A: 0.00 AUDFY2026A: 14,858,870 AUD0.014.9
Net change in cashAUDmFY2025A: 53,524,264 AUDFY2026A: 51,233,822 AUD53.551.2
Balance sheet
CashAUDmFY2025A: 151,645,969 AUDFY2026A: 202,879,791 AUD151.6202.9
Debt (excl. leases)AUDm0.00.0
Net debt (negative = net cash)AUDmFY2025A: -151,645,969 AUDFY2026A: -202,879,791 AUD(151.6)(202.9)
Per share
Shares (period end; forecast diluted)m sharesFY2025A: 392,812,933 sharesFY2026A: 389,718,642 shares392.8389.7
EPSAUD/shareFY2025A: 0.14 AUD/shareFY2026A: 0.29 AUD/share0.140.29
Dividends per shareAUD/share0.000.00
Multiples and ratios
EV / EBITDA (x, current EV)xFY2025A: 5.00 xFY2026A: 3.28 x5.03.3
P / E (x, current market cap)xFY2025A: 19.51 xFY2026A: 9.76 x19.59.8
FCF yield (current market cap)%FY2025A: 0.05 fractionFY2026A: 0.07 fraction5.0%6.8%
EBITDA margin%FY2025A: 0.49 fractionFY2026A: 0.56 fraction49.0%55.5%
Net debt / EBITDA (x)xFY2025A: -0.87 xFY2026A: -0.76 x(0.9)(0.8)

KPI history

Operating metrics · Norseman Gold Project

Gold produced (Norseman, 100%) shown
07,11714,23421,35028,467Q2 FY25: 19,438 ozQ2 FY25Q3 FY25: 18,334 ozQ3 FY25Q4 FY25: 25,417 ozQ4 FY25Q1 FY26: 19,551 ozQ1 FY26Q2 FY26: 22,071 ozQ2 FY26Q3 FY26: 17,757 ozQ3 FY26Q4 FY26: 18,028 ozQ4 FY26Q1 FY27: 21,864 ozQ1 FY27
MetricUnitTrendQ2 FY25Q3 FY25Q4 FY25Q1 FY26Q2 FY26Q3 FY26Q4 FY26Q1 FY27
Gold produced (Norseman, 100%)ozQ2 FY25: 19,438 ozQ3 FY25: 18,334 ozQ4 FY25: 25,417 ozQ1 FY26: 19,551 ozQ2 FY26: 22,071 ozQ3 FY26: 17,757 ozQ4 FY26: 18,028 ozQ1 FY27: 21,864 oz19,43818,33425,41719,55122,07117,75718,02821,864
All-in sustaining cost (excl. purchased-ore ounces)AUD/ozQ2 FY25: 2,346 AUD/ozQ3 FY25: 2,420 AUD/ozQ4 FY25: 1,991 AUD/ozQ1 FY26: 3,139 AUD/ozQ2 FY26: 2,573 AUD/ozQ3 FY26: 3,183 AUD/ozQ4 FY26: 4,107 AUD/ozQ1 FY27: 3,860 AUD/oz2,3462,4201,9913,1392,5733,1834,1073,860
C1 cash costAUD/ozQ2 FY25: 1,937 AUD/ozQ3 FY25: 1,811 AUD/ozQ4 FY25: 1,504 AUD/ozQ1 FY26: 2,493 AUD/ozQ2 FY26: 1,962 AUD/ozQ3 FY26: 2,304 AUD/ozQ4 FY26: 3,305 AUD/ozQ1 FY27: 3,000 AUD/oz1,9371,8111,5042,4931,9622,3043,3053,000
Head grade processedg/tQ2 FY25: 2.12 g/tQ3 FY25: 1.98 g/tQ4 FY25: 2.83 g/tQ1 FY26: 2.21 g/tQ2 FY26: 2.68 g/tQ3 FY26: 2.22 g/tQ4 FY26: 2.32 g/tQ1 FY27: 2.74 g/t2.121.982.832.212.682.222.322.74
Plant recovery%Q2 FY25: 94.80 %Q3 FY25: 94.20 %Q4 FY25: 95.80 %Q1 FY26: 95.50 %Q2 FY26: 95.30 %Q3 FY26: 94.50 %Q4 FY26: 93.80 %Q1 FY27: 95.10 %94.894.295.895.595.394.593.895.1
Ore processed (incl. purchased ore)tQ2 FY25: 300,400 tQ3 FY25: 305,876 tQ4 FY25: 291,335 tQ1 FY26: 288,768 tQ2 FY26: 268,718 tQ3 FY26: 262,729 tQ4 FY26: 257,453 tQ1 FY27: 260,783 t300,400305,876291,335288,768268,718262,729257,453260,783
Gold soldozQ2 FY26: 22,473 ozQ3 FY26: 20,016 ozQ4 FY26: 16,366 ozQ1 FY27: 22,834 oz————22,47320,01616,36622,834
Average realised gold priceAUD/ozQ2 FY26: 6,077 AUD/ozQ3 FY26: 6,916 AUD/ozQ4 FY26: 6,293 AUD/ozQ1 FY27: 6,067 AUD/oz————6,0776,9166,2936,067

KPI history

Operating metrics · Company

Company-reported EBITDA shown
024,752,00049,504,00074,256,00099,008,000Q1 FY26: 53,900,000 AUDQ1 FY26Q2 FY26: 83,600,000 AUDQ2 FY26Q3 FY26: 88,400,000 AUDQ3 FY26Q4 FY26: 44,800,000 AUDQ4 FY26Q1 FY27: 63,100,000 AUDQ1 FY27
MetricUnitTrendQ1 FY26Q2 FY26Q3 FY26Q4 FY26Q1 FY27
Company-reported EBITDAAUDQ1 FY26: 53,900,000 AUDQ2 FY26: 83,600,000 AUDQ3 FY26: 88,400,000 AUDQ4 FY26: 44,800,000 AUDQ1 FY27: 63,100,000 AUD53,900,00083,600,00088,400,00044,800,00063,100,000
Cash and gold (incl. gold in circuit at spot)AUDQ1 FY26: 181,500,000 AUDQ2 FY26: 216,500,000 AUDQ3 FY26: 250,300,000 AUDQ4 FY26: 223,400,000 AUDQ1 FY27: 240,000,000 AUD181,500,000216,500,000250,300,000223,400,000240,000,000
Operating metric source table75
MetricProjectPeriodPeriod typeValueStatus
Gold produced (Norseman, 100%)NorsemanQ2 FY25Quarter19,438 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ2 FY25Quarter2,346 AUD/ozReported
C1 cash costNorsemanQ2 FY25Quarter1,937 AUD/ozReported
Head grade processedNorsemanQ2 FY25Quarter2.12 g/tReported
Plant recoveryNorsemanQ2 FY25Quarter94.8 %Reported
Ore processed (incl. purchased ore)NorsemanQ2 FY25Quarter300,400 tReported
Gold produced (Norseman, 100%)NorsemanQ3 FY25Quarter18,334 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ3 FY25Quarter2,420 AUD/ozReported
C1 cash costNorsemanQ3 FY25Quarter1,811 AUD/ozReported
Head grade processedNorsemanQ3 FY25Quarter1.98 g/tReported
Plant recoveryNorsemanQ3 FY25Quarter94.2 %Reported
Ore processed (incl. purchased ore)NorsemanQ3 FY25Quarter305,876 tReported
Gold produced (Norseman, 100%)NorsemanQ4 FY25Quarter25,417 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ4 FY25Quarter1,991 AUD/ozReported
C1 cash costNorsemanQ4 FY25Quarter1,504 AUD/ozReported
Head grade processedNorsemanQ4 FY25Quarter2.83 g/tReported
Plant recoveryNorsemanQ4 FY25Quarter95.8 %Reported
Ore processed (incl. purchased ore)NorsemanQ4 FY25Quarter291,335 tReported
Gold produced (Norseman, 100%)NorsemanQ1 FY26Quarter19,551 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ1 FY26Quarter3,139 AUD/ozReported
C1 cash costNorsemanQ1 FY26Quarter2,493 AUD/ozReported
Head grade processedNorsemanQ1 FY26Quarter2.21 g/tReported
Plant recoveryNorsemanQ1 FY26Quarter95.5 %Reported
Ore processed (incl. purchased ore)NorsemanQ1 FY26Quarter288,768 tReported
Gold produced (Norseman, 100%)NorsemanQ2 FY26Quarter22,071 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ2 FY26Quarter2,573 AUD/ozReported
C1 cash costNorsemanQ2 FY26Quarter1,962 AUD/ozReported
Head grade processedNorsemanQ2 FY26Quarter2.68 g/tReported
Plant recoveryNorsemanQ2 FY26Quarter95.3 %Reported
Ore processed (incl. purchased ore)NorsemanQ2 FY26Quarter268,718 tReported
Gold produced (Norseman, 100%)NorsemanQ3 FY26Quarter17,757 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ3 FY26Quarter3,183 AUD/ozReported
C1 cash costNorsemanQ3 FY26Quarter2,304 AUD/ozReported
Head grade processedNorsemanQ3 FY26Quarter2.22 g/tReported
Plant recoveryNorsemanQ3 FY26Quarter94.5 %Reported
Ore processed (incl. purchased ore)NorsemanQ3 FY26Quarter262,729 tReported
Gold produced (Norseman, 100%)NorsemanQ4 FY26Quarter18,028 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ4 FY26Quarter4,107 AUD/ozReported
C1 cash costNorsemanQ4 FY26Quarter3,305 AUD/ozReported
Head grade processedNorsemanQ4 FY26Quarter2.32 g/tReported
Plant recoveryNorsemanQ4 FY26Quarter93.8 %Reported
Ore processed (incl. purchased ore)NorsemanQ4 FY26Quarter257,453 tReported
Gold produced (Norseman, 100%)NorsemanQ1 FY27Quarter21,864 ozReported
All-in sustaining cost (excl. purchased-ore ounces)NorsemanQ1 FY27Quarter3,860 AUD/ozReported
C1 cash costNorsemanQ1 FY27Quarter3,000 AUD/ozReported
Head grade processedNorsemanQ1 FY27Quarter2.74 g/tReported
Plant recoveryNorsemanQ1 FY27Quarter95.1 %Reported
Ore processed (incl. purchased ore)NorsemanQ1 FY27Quarter260,783 tReported
Company-reported EBITDACompanyQ1 FY26Quarter53,900,000 AUDReported
Company-reported EBITDACompanyQ2 FY26Quarter83,600,000 AUDReported
Company-reported EBITDACompanyQ3 FY26Quarter88,400,000 AUDReported
Company-reported EBITDACompanyQ4 FY26Quarter44,800,000 AUDReported
Company-reported EBITDACompanyQ1 FY27Quarter63,100,000 AUDReported
Cash and gold (incl. gold in circuit at spot)Company30 Sep 2025Point In Time181,500,000 AUDReported
Cash and gold (incl. gold in circuit at spot)Company31 Dec 2025Point In Time216,500,000 AUDReported
Cash and gold (incl. gold in circuit at spot)Company31 Mar 2026Point In Time250,300,000 AUDReported
Cash and gold (incl. gold in circuit at spot)Company30 Jun 2026Point In Time223,400,000 AUDReported
Cash and gold (incl. gold in circuit at spot)Company30 Sep 2026Point In Time240,000,000 AUDReported
Gold soldNorsemanQ2 FY26Quarter22,473 ozReported
Average realised gold priceNorsemanQ2 FY26Quarter6,077 AUD/ozReported
Gold soldNorsemanQ3 FY26Quarter20,016 ozReported
Average realised gold priceNorsemanQ3 FY26Quarter6,916 AUD/ozReported
Gold soldNorsemanQ4 FY26Quarter16,366 ozReported
Average realised gold priceNorsemanQ4 FY26Quarter6,293 AUD/ozReported
Gold soldNorsemanQ1 FY27Quarter22,834 ozReported
Average realised gold priceNorsemanQ1 FY27Quarter6,067 AUD/ozReported
Gold produced (annual)NorsemanFY2025Year84,564 ozReported
Gold produced (annual)NorsemanFY2026Year77,408 ozReported
RevenueCompanyFY2025Year357,302,451 AUDReported
RevenueCompanyFY2026Year480,744,029 AUDReported
EBITDA (PBT + finance costs + D&A - interest income)CompanyFY2025Year175,023,160 AUDSource Derived
EBITDA (PBT + finance costs + D&A - interest income)CompanyFY2026Year266,917,675 AUDSource Derived
Operating cash flow less capex (PP&E, exploration, mine development)CompanyFY2026Year102,942,333 AUDSource Derived
Operating cash flow less capex (PP&E, exploration, mine development)CompanyFY2025Year75,259,127 AUDSource Derived
Borrowings (nil; leases excluded)Company30 Sep 2026Point In Time0 AUDReported
Company guidance8
MetricProjectPeriodLowHighStatus
Gold ProductionnorsemanFY2026 (original)100,000110,000 ozSuperseded
AISCnorsemanFY2026 (original)1,9502,250 AUD/ozMissed
Gold ProductionnorsemanFY2026 (revised 9 March 2026)86,00092,000 ozMissed
Gold ProductionnorsemanFY2027 (40-45% in H1)90,000105,000 ozCurrent
AISCnorsemanFY20272,8003,400 AUD/ozCurrent
Exploration BudgetnorsemanFY202745,900,00045,900,000 AUDCurrent
Major Project Capital (Approximate)norsemanFY202767,000,00067,000,000 AUDCurrent
Aspirational Production RatenorsemanLong term (no date)200,000— oz/yrCurrent

Capital history

Capital events

3 events · newest first
DateEventAmountSharesPriceStatusTerms
2026-06-30Ann. 2026-09-29LeaseA$70.1M——Ongoing—
2026-03-09Ann. 2026-02-23BuybackOrdinary Fully Paid SharesA$24.8M7.8M—Ongoing10% on-market buy-back: 4,462,265 shares for A$14.86m to 30 June 2026, none in the September quarter, then 3,336,570 shares on 6-9 October 2026 (about A$10.0m at A$2.93-3.10). Amount is the analyst estimate of cash spent to 9 October 2026.Max 38.3M · Period 2026-03-09 to 2027-03-09 · On-market; prices paid A$2.25-3.93 to 9 October 2026 · Canaccord Genuity (Australia) Limited
2025-08-08RaisingA$2.3M1.4M—Completed—

Contracts and ownership

Material economic arrangements These are deals that can affect sales, costs, funding or ownership. An arrangement marked “Included in valuation” may already be built into a project estimate or the bridge to shareholder value. A separate amount is shown only when one can be estimated; do not add it again.

Complete As Disclosed · as of 2026-10-31

Royalties, sales, ore purchase, native title, hedging and disposal arrangements disclosed in the 2026 annual report (notes 6, 7, 12, 23, 27, 36) and the 2026 quarterlies; mining contracts (Redpath) are service contracts and not economic interests.

Royalties on gold sales (WA state royalty and other royalties) cost A$15.2m in FY2026, 3.15% of revenue, A$208/oz in the September 2026 quarter.

Royalty · Active
Counterparties
State of Western Australia
Applies to
Norseman Gold Project · Gold
Economic direction
Burden
Period
Dates not stated
Key terms
Total royalties expensed FY2026: 15,162,710 AUD
Royalties per ounce, Q1 FY27: 208 AUD/oz
How it affects our valuation

No valuation treatment is available for this arrangement.

Native title agreement with production-based quarterly payments; amounts not separately disclosed and assumed inside reported royalties and costs.

Other · Active
Counterparties
Ngadju Native Title Aboriginal Corporation
Applies to
Norseman Gold Project · Gold
Economic direction
Burden
Period
Dates not stated
Key terms
Payments: production-based quarterly payments plus community programmes
How it affects our valuation

No valuation treatment is available for this arrangement.

Ore purchase agreement for Rama open-pit ore processed at Norseman (21,374 t in June quarter, 12,281 t in September quarter); Pantoro advanced A$15m at 5% secured, repayable at A$1,000/oz and in full by 31 December 2026. Ore deliveries expected to resume in November 2026 and continue into the March 2027 quarter.

Tolling Or Processing · Active
Counterparties
Bain Global Resources Pty Ltd (Mega Resources)
Applies to
Norseman Gold Project · Gold
Economic direction
Benefit
Period
From 2026-06-01; no end date stated
Key terms
Advance outstanding: 13,732,873 AUD
Interest on advance: 5 %
Mandatory repayment: 1,000 AUD/oz recovered
Security: first-ranking general security and mortgage over Rama tenure
How it affects our valuation

No valuation treatment is available for this arrangement.

Dore refined and sold at spot to the Perth Mint (A$451.3m in FY2026); no forward sales after the CBA collar expired.

Offtake · Active
Counterparties
The Perth Mint
Applies to
Norseman Gold Project · Gold · Silver
Economic direction
Benefit
Period
Dates not stated
Key terms
FY2026 sales: 451,344,029 AUD
How it affects our valuation

No valuation treatment is available for this arrangement.

Consideration for the 2024 sale of Halls Creek: A$2m cash due 29 November 2026 and a 1% royalty capped at A$1m, secured by mortgage; carried at A$2.37m.

Royalty · Active
Counterparties
Kimberley Minerals Group Pty Ltd
Applies to
Company-wide · Gold
Economic direction
Benefit
Period
From 2024-11-29; no end date stated
Key terms
Deferred cash due 29 November 2026: 2,000,000 AUD
Royalty: 1 %
How it affects our valuation

No valuation treatment is available for this arrangement.

15% free-carried interest in nickel and PGEs on the Halls Creek tenure via a mineral rights agreement; no resource or plan, so no value assigned.

Free Carry · Active
Counterparties
Kimberley Minerals Group Pty Ltd
Applies to
Company-wide · Nickel · Platinum Group Metals
Economic direction
Benefit
Period
From 2024-11-29; no end date stated
Key terms
Free-carried interest: 15 %
How it affects our valuation

No valuation treatment is available for this arrangement.

Zero-cost collar for calendar 2025; last settlement 5 January 2026; no forward sales at 30 June 2026.

Commodity Hedge · Expired
Counterparties
Commonwealth Bank of Australia
Applies to
Norseman Gold Project · Gold
Economic direction
Mixed
Period
2025-01-01 to 2025-12-31
Key terms
Put / call strikes: 2,000 oz/month at A$3,500 put, 1,000 oz/month at A$4,200 call
How it affects our valuation

No valuation treatment is available for this arrangement.

Diesel forward contracts for calendar 2025, not hedge-accounted; none outstanding at 30 June 2026.

Other · Expired
Counterparties
Not disclosed
Applies to
Norseman Gold Project · Gold
Economic direction
Mixed
Period
2025-01-01 to 2025-12-31
Key terms
Diesel forwards: monthly AUD diesel forwards for calendar 2025
How it affects our valuation

No valuation treatment is available for this arrangement.