OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TER ASX

TerraCom Limited

Producer · Others · Australia · South Africa Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.023
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$41.9M
EV
—
Cash
A$8.4M
Debt
A$0
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

8 assets

Core asset

Blair Athol Coal Mine

Australia

Producer100% ownedOthers

Owner-operated Queensland open-pit thermal-coal mine with established processing, rail and export infrastructure; FY27 sales guidance is 2.0-2.2 Mt and the latest reported marketable reserve was 14 Mt. FY2026 sales were 1.452 Mt versus 1.6 Mt guidance; FY2027 target of 2.0-2.2 Mt remains unproven.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost126AUD per sold tonne excluding royalties

Latest actual June-quarter FOB cost; no issuer NPV, IRR or public discount-rate case was disclosed.

Resources & reserves6
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured21.1 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Mineral ResourceIndicated4.6 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Mineral ResourceInferred1 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Ore ReserveProved recoverable15.9 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Ore ReserveProbable recoverable2.1 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Ore ReserveTotal marketable14 MtThermal coal; grade not disclosed in summary tableOthers2025-06-30
Tenements1
ml1804Granted— None · No expiry supplied
Milestones1
  1. Deliver FY27 sales guidance with third mining fleet

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Environmental Authority EPML00876713Queensland, AustraliaGranted—Yes
Economic studies1
StudyStageStatusDateSummary
2025 Blair Athol life-of-mine operating planOperating PlanCurrent2025-10-30Reserve basis uses the 2025 life-of-mine cost and revenue structures; the public summary does not disclose a full cash-flow model.

Material

New Clydesdale Colliery

South Africa

Producer49% ownedOthers

Operating domestic-and-export thermal-coal mine held through Universal Coal; the South African divestment process remains a strategic objective.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred total105.5 Mt on 100% basisThermal coal; category grades not disclosed in summary tableOthers2025-06-30
Ore ReserveProved and Probable total40.9 Mt on 100% basisThermal coal; grade not disclosed in summary tableOthers2025-06-30
Tenements1
ncc_mr429Granted— None · No expiry supplied
Milestones1
  1. Conclude South African portfolio divestment on acceptable terms

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
New Clydesdale mining rightMpumalanga, South AfricaGranted—Yes

Material

North Block Complex

South Africa

Producer49% ownedOthers

Operating domestic-and-export thermal-coal complex held through Universal Coal and included in the South African portfolio strategy.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred total84.7 Mt on 100% basisThermal coal; category grades not disclosed in summary tableOthers2025-06-30
Ore ReserveProved total40.1 Mt on 100% basisThermal coal; grade not disclosed in summary tableOthers2025-06-30
Tenements1
nbc_mining_rightsGranted— None · No expiry supplied
Milestones1
  1. Conclude South African portfolio divestment on acceptable terms

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
North Block Complex mining rightsMpumalanga, South AfricaGranted—Yes

Material

Ubuntu Colliery

South Africa

Care And Maintenance48.9% ownedOthers

Care-and-maintenance thermal-coal asset held through Universal Coal; any restart remains conditional on economics and the South African portfolio outcome.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred total36.9 Mt on 100% basisThermal coal; category grades not disclosed in summary tableOthers2015-01-13
Ore ReserveProbable total6.3 Mt on 100% basisThermal coal; grade not disclosed in summary tableOthers2025-06-30
Tenements1
ubuntu_mr10027Granted— None · No expiry supplied
Milestones1
  1. Determine restart or divestment outcome

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Ubuntu mining rightMpumalanga, South AfricaGranted—Yes

Material

Moorlands Project

Australia

Scoping Study DeveloperOthers

Conditional Queensland growth project near Blair Athol. Wintime partnership and infrastructure access are progressing, but final ownership, binding funding, approvals and feasibility economics are not disclosed.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceReported total; category split not provided in reviewed summary378 MtThermal coal; grade not disclosed in reviewed summaryOthers2025-06-30
Milestones2
  1. Complete binding commercial and ownership terms

    Pending · High materiality

  2. Complete regulatory approvals and new exploration program planning

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Strategic government and development approvalsQueensland and Commonwealth, AustraliaPending—Yes

Other

Kangala Colliery and CHPP toll washing

South Africa

Producer70.5% ownedOthers

Kangala plant is processing third-party coal through toll washing while Eloff approvals and development work continue.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred total94.6 Mt on 100% basisThermal coal; category grades not disclosed in summary tableOthers2017-10-12
Tenements1
kangala_mr429Granted— None · No expiry supplied
Milestones1
  1. Sustain toll-washing operations

    Achieved · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Kangala mining rightMpumalanga, South AfricaGranted—Yes

Other

Eloff Project

South Africa

Scoping Study Developer49% ownedOthers

Shovel-ready development project dependent on approvals, commercially viable coal sales terms and the South African portfolio strategy.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred total695.2 Mt on 100% basisThermal coal; category grades not disclosed in summary tableOthers2022-01-27
Tenements1
eloff_mr10169Granted— None · No expiry supplied
Milestones1
  1. Finalise commercially viable coal supply agreement

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Eloff mining right registrationMpumalanga, South AfricaPending—Yes

Other

Northern Galilee and Springsure exploration portfolio

Australia

Resource StageOthers

Historic JORC 2004 exploration resources without current economic studies; no value is assigned in the base case.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated and Inferred total191 Mt on 100% basisPCI and thermal coal; grade not disclosed in summary tableOthers2013-11-29
Mineral ResourceIndicated and Inferred total1.2K Mt on 100% basisThermal coal; grade not disclosed in summary tableOthers2013-02-08
Mineral ResourceIndicated and Inferred total728 Mt on 100% basisThermal coal; grade not disclosed in summary tableOthers2013-02-08
Tenements1
aus_exploration_groupGranted— None · No expiry supplied