OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TRE ASX

Toubani Resources Limited

Construction · Gold · ML Rating locked: sign in to view v8.1 · tre-20261106t165017-full
Last 2026-11-06
A$0.295
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$316.8M
EV
A$266.1M
Cash
A$120.8M
Debt
A$70.1M

Portfolio detail

Assets

1 assets

Core asset

Kobada Gold Project (Mines de Kobada SA; MaliCo operating entity)

ML

Construction90% ownedGold

Construction since FID on 9 Mar 2026; mining licence transferred 28 Jan 2026; mining contractor Corica appointed (mining from early 2027); first gold targeted Q3 2027; 80% of capex committed at 30 Sep 2026.

Project location

Site imagery

Sentinel-2 · 10 m
Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVUS$5008% discount
IRR50%Published return
Initial capexUS$216Published capital estimate
Operating cost1,175USD/oz AISC (LOM)
NPVUS$9518% discount
IRR79%Published return
Initial capexUS$216Published capital estimate
Operating cost1,317USD/oz AISC (LOM)
NPVUS$6358% discount
IRR58%Published return
Initial capexUS$216Published capital estimate
Operating cost1,004USD/oz AISC (LOM)

100% project basis; post-tax NPV8% at US$2,200/oz; 2023 Mining Code basis (royalties and fees US$309/oz)

100% project basis; post-tax NPV8% at US$3,000/oz

100% project basis; post-tax NPV8% at US$2,200/oz; 2012 Mining Code and 6.6% royalty

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (indicated plus inferred; inclusive of reserves)78 Mt0.88 g/t goldGold2024-07-02
Mineral Resourceindicated71 Mt0.87 g/t goldGold2024-07-02
Mineral Resourceinferred7 Mt0.97 g/t goldGold2024-07-02
Ore Reserveprobable (all derived from indicated resource)53.8 Mt0.90 g/t goldGold2025-03-31
Tenements3
tre-kobada-operating-permitGranted— None · 2045-07-31
tre-faraba-permitGranted— None · 2027-04-06
tre-kobada-est-permitGranted— None · 2027-08-16
Milestones4
  1. Kobada mineral resource update (26,000 m new drilling; Entech) to be completed

    Pending · High materiality

  2. Start of mining with Corica Mining Services

    Pending · High materiality

  3. First gold production (Q3 2027 target)

    Pending · High materiality

  4. Ore Reserve update (announced as upcoming, undated)

    Pending · High materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
Kobada Operating Permit / mining licence transfer to Mines de Kobada SAMaliGranted2045-07-31No
Environmental permitMaliGranted—No
Free carried 10% State interest in MaliCo: decree issued, initial 10% not yet acquiredMaliPending—No
Economic studies2
StudyStageStatusDateSummary
Definitive Feasibility Study (Oct 2024)DFSSuperseded2024-10-31Post-tax NPV8% US$635m, IRR 58%, initial capital US$216m, average 162koz a year over 9.2 years at US$2,200/oz; superseded by the restatement under the 2023 Mining Code.
DFS outcomes restated under the 2023 Mining Code (July 2026 presentation)DFSCurrent2026-07-13Same mine plan with royalties and fees of US$309/oz and AISC US$1,175/oz at US$2,200/oz: post-tax NPV8% US$500m, IRR 50%, payback 1.75 years; US$951m at US$3,000/oz. Initial development capital remains US$216m in the presentation, but the funded budget implies more (see capex reconciliation).