OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TTM ASX

Titan Minerals Limited

Scoping Study Developer · Gold · Silver · Copper · Ecuador Rating locked: sign in to view v6.2
Last 2026-11-05
A$0.55
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$158.4M
EV
A$149.9M
Cash
A$8.5M
Debt
A$0
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

4 assets

Core asset

Dynasty Gold Project

Ecuador

Scoping Study Developer100% ownedGoldSilverCopper

100%-owned gold-silver resource with drilling and scoping work active; the updated MRE and Scoping Study are now guided for early 2027, with the MRE first. Large-scale development still requires further study, permitting and funding.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics

No numeric study economics were published.

No issuer scoping-study economics had been released by the cutoff; valuation therefore uses a bounded, risked resource calibration rather than invented DCF inputs.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated17.4 Mt2.18 g/t Au and 13.94 g/t Ag; 1.21 Moz Au and 7.78 Moz Ag containedGold · Silver2026-03-18
Mineral ResourceInferred48.2 Mt1.73 g/t Au and 11.82 g/t Ag; 2.68 Moz Au and 18.32 Moz Ag containedGold · Silver2026-03-18
Tenements5
cecilia-1Granted— None · 2034-11-12
pilo-9Granted— None · 2034-10-13
zarGranted— None · 2034-12-02
zar-1Granted— None · 2034-12-05
zar-3aGranted— None · 2034-12-11
Milestones2
  1. Deliver Dynasty Scoping Study

    Delayed · High materiality

  2. Deliver Dynasty Mineral Resource Estimate update

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Small-scale mining permissions across three resource concessionsEcuadorGranted—No
Large-scale mining authorisationEcuadorRequired—Yes
Economic studies1
StudyStageStatusDateSummary
Dynasty Scoping StudyScoping StudyCurrent2026-04-30Orelogy, Ausenco and Knight Piésold workstreams cover pit optimisation, process design, capex, opex and infrastructure; delivery now expected early 2027 after the updated MRE.

Material

Linderos Copper Project

Ecuador

Discovery Drill Stage49% ownedCopperGoldSilverOthers

Hanrine had earned 51% according to the 21 July presentation and fully funds/manages exploration toward up to 80%; Titan is free-carried to that point and retains a 2.7% NSR fallback if subsequently diluted below 10%.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements4
chorreraGranted— None · 2034-10-13
dynasty-1Granted— None · 2035-06-11
linderos-eGranted— None · 2034-07-27
narangoGranted— None · 2034-09-27
Milestones1
  1. Decision to Mine or aggregate US$120 million spend

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Exploration permits for partner-funded drillingEcuadorGranted—No

Other

Copper Duke Project

Ecuador

Early Explorer100% ownedCopperGoldSilver

100%-owned early-stage porphyry and epithermal copper-gold-silver exploration portfolio with targets defined but no resource.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
barbascoGranted— None · 2034-10-05
Milestones1
  1. Advance high-priority Copper Duke targets to drilling

    Pending · Medium materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Exploration tenure permissionsEcuadorGranted—No

Other

Copper Field Project

Ecuador

Early Explorer100% ownedCopperGoldSilver

100%-owned early-stage copper-gold-silver exploration portfolio undergoing generative targeting with no resource.

Project location

Site imagery

Sentinel-2 · 10 m

Association needs review before imagery can be linked to this project.

Tenements1
cooper-1Granted— None · 2034-11-10
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Exploration tenure permissionsEcuadorGranted—No