OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor USL ASX

Unico Silver Limited

Resource Stage · Silver · AR Rating locked: sign in to view v8.1 · usl-20261102t225745-full
Last 2026-11-06
A$0.54
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$389.5M
EV
A$289.2M
Cash
A$100.3M
Debt
A$0

Portfolio detail

Assets

2 assets

Core asset

Joaquin silver-gold project (Santa Cruz, Argentina)

AR

Resource Stage100% ownedSilverGold

100% owned (Minera Joaquin S.A.). Maiden PFS in progress, now due January 2027; DFS to end 2027; RIGI admission targeted 2H 2027. No economic study published.

Resource / scoping · Resource stage
Contained metal (attributable)
167.0m ozd
Resource grade
115.00 g/t
% Measured + Indicated
78.4%d
Resource tonnes
45.30 Mt
Our value per attrib. contained unit
Locked
Mining method
Open-pit (under study; method not yet selected)

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated34.5M t118 g/t AgEq (103 Moz Ag, 334 koz Au)Silver · Gold2026-03-17
Mineral Resourceinferred10.8M t106 g/t AgEq (20 Moz Ag, 190 koz Au)Silver · Gold2026-03-17
Mineral Resourcetotal45.3M t115 g/t AgEq (123 Moz Ag, 522 koz Au)Silver · Gold2026-03-17
Milestones3
  1. Maiden Pre-Feasibility Study (rescheduled from Sept 2026)

    Delayed · High materiality

  2. Definitive Feasibility Study completion

    Pending · High materiality

  3. RIGI admission targeted

    Pending · High materiality

Core asset

Cerro Leon silver project (Santa Cruz, Argentina)

AR

Resource Stage100% ownedSilver

100% owned. Resource only; included in the integrated PFS scope per 18 Aug 2026 update.

Resource / scoping · Resource stage
Contained metal (attributable)
162.0m ozd
Resource grade
161.00 g/t
% Measured + Indicated
35.8%d
Resource tonnes
31.00 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated9.4M t190 g/t AgEq (28.9 Moz Ag)Silver2025-09-23
Mineral Resourceinferred21.6M t154 g/t AgEq (33.1 Moz Ag)Silver2025-09-23
Mineral Resourcetotal31M t161 g/t AgEq (62 Moz Ag)Silver2025-09-23
Milestones1
  1. Cerro Leon included in integrated PFS scope

    Pending · Medium materiality

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)