OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor STK ASX

Strickland Metals Limited

Scoping Study Developer · Gold · Copper · Zinc · Serbia · Australia Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.044
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$116.2M
EV
A$44.4M
Cash
A$58.6M
Debt
A$0
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

2 assets

Core asset

Rogozna

Serbia

Scoping Study Developer100% ownedGoldCopperZincLeadSilver

Held through wholly owned Zlatna Reka Resources; internal Gradina scoping study in final stages, no public mine plan or reserve; Shanac licence drilling remained delayed on 31 July.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves5
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated30M tonnes1.30 g/t AuEq; 0.83 g/t Au; 0.13% Cu; 0.36% Zn; 0.29% Pb; 7.20 g/t AgGold · Copper · Zinc · Lead · Silver2026-04-15
Mineral ResourceInferred130M tonnes0.98 g/t AuEq; 0.55 g/t Au; 0.11% Cu; 0.34% Zn; 0.21% Pb; 6.10 g/t AgGold · Copper · Zinc · Lead · Silver2026-04-15
Mineral ResourceInferred20M tonnes2.8 g/t AuGold2026-05-26
Mineral ResourceInferred21M tonnes1.9 g/t AuEq; 0.77 g/t Au; 0.27% Cu; 1.54% Zn; 0.11% Pb; 6.3 g/t AgGold · Copper · Zinc · Lead · Silver2025-02-19
Mineral ResourceInferred16M tonnes1.6 g/t AuEq; 1.3 g/t Au; 0.45% CuGold · Copper2026-07-15
Tenements3
licence-2385Granted— None · No expiry supplied
licence-2262Granted— None · No expiry supplied
licence-2516Granted— None · No expiry supplied
Milestones2
  1. Complete internal Gradina scoping study

    Pending · High materiality

  2. Deliver Rogozna pre-feasibility study

    At Risk · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Environmental and social impact assessment for mine developmentSerbiaRequired—Yes
Economic studies1
StudyStageStatusDateSummary
Internal Gradina scoping studyScoping StudyCurrent2026-07-31In final stages and guided for Q3 2026 internal completion; no public NPV, capex, mine schedule or reserve disclosed.

Other

Bryah Basin retained royalty

Australia

Divested0% ownedGoldCopperNickel

Tenements sold on 19 December 2025; Strickland retains a 2% net smelter return royalty on future production, with no reserve or production schedule.