Energy Transition Minerals Ltd

Care And Maintenance · Tin · Others · Rare Earths · Spain · Greenland · Canada Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.042
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$92.9M
EV
—
Cash
A$41.7M
Debt
A$0
3 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

7 assets

Core asset

Penouta Tin-Tantalum-Niobium Mine

Spain

Care And Maintenance100% ownedTinOthers

Acquisition completed in July 2026. Section B is live; Section C is suspended and ETM is progressing a new exploitation-concession application. Restart remains subject to technical, environmental, permitting and funding work.

Project location

Site imagery

Sentinel-2 · 10 m
Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost9.25USD/tonne processing plus G&A

MRE pit-shell processing and G&A cost basis only; not a feasibility study or project valuation.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured5.9M tonnes569 ppm Sn, 100 ppm Ta2O5, 98 ppm Nb2O5Tin · Others2026-05-01
Mineral ResourceIndicated68M tonnes457 ppm Sn, 83 ppm Ta2O5, 88 ppm Nb2O5Tin · Others2026-05-01
Mineral ResourceInferred34.1M tonnes375 ppm Sn, 70 ppm Ta2O5, 96 ppm Nb2O5Tin · Others2026-05-01
Tenements2
penouta-section-b-61Granted184.2 hectares · 2030-04-19
penouta-section-c-4880.1Renewal Pending— None · No expiry supplied
Milestones3
  1. Submit full new Section C exploitation-concession application

    Pending · High materiality

  2. Complete targeted PFS, validated flowsheet and financial scenarios

    Pending · High materiality

  3. Complete environmental, rehabilitation and social studies

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Section B waste and tailings exploitation authorisationGalicia, SpainGranted2030-04-19No
New Section C exploitation concessionGalicia, SpainPending—Yes

Material

Kvanefjeld Rare Earths Project

Greenland

DFS Unfunded Developer100% ownedRare EarthsOthers

Exploration licence extension was refused in June 2026 and exploitation licence applications remain rejected; value depends on Greenland court litigation and potentially resumed arbitration. On 1 September 2026 the Greenland High Court retained executive-branch defendants; merits response is due 27 October 2026 and a hearing may be no earlier than autumn 2027.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
kvanefjeld-el-2010-02Expired— None · 2025-12-31
Milestones1
  1. Remaining defendants' substantive statement of defence

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Kvanefjeld exploitation licenceGreenlandRefused—Yes
Economic studies1
StudyStageStatusDateSummary
2016 Definitive Feasibility StudyDFSSuperseded2016-01-01Historical DFS is not treated as a current economic basis because licence status and legal conditions have materially changed.

Other

Villasrubias Lithium-Tantalum Project

Spain

Early ExplorerLithiumOthers

ETM holds an option to earn 51% by spending A$3 million; current earned ownership was not established in the reviewed package. The 30 June 2026 interim report fully impaired the Villasrubias and James Bay exploration carrying amounts; this is an accounting outcome, not proof of zero geological potential.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Tenements1
villasrubias-6914Granted— None · No expiry supplied

Other

Solo Lithium Project

Canada

Early Explorer100% ownedLithium

Live James Bay claims; no substantive on-ground activity in the June 2026 quarter and strategic options are under consideration. The 30 June 2026 interim report fully impaired the Villasrubias and James Bay exploration carrying amounts; this is an accounting outcome, not proof of zero geological potential.

Other

Good Setting Lithium Project

Canada

Early Explorer100% ownedLithium

Live James Bay claims; no substantive on-ground activity in the June 2026 quarter and strategic options are under consideration. The 30 June 2026 interim report fully impaired the Villasrubias and James Bay exploration carrying amounts; this is an accounting outcome, not proof of zero geological potential.

Other

Swordfish Projects

Spain

Early Explorer100% ownedLithiumOthers

Early-stage Spanish exploration portfolio with minimal June-quarter field work and permits reported in good standing.

Other

Cibeles Geothermal Research Permits

Spain

Early ExplorerOthers

Five granted geothermal research permits beneficially held for transfer to ETM Spain; ETM is considering strategic options.