OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor KAU ASX

Kaiser Reef Limited

Producer · Gold · Australia Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.15
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$90.8M
EV
A$67.2M
Cash
A$37M
Debt
A$13.6M
4 newer ASX announcements not yet reflected in this valuation

Portfolio detail

Assets

4 assets

Core asset

Henty Gold Mine

Australia

Producer100% ownedGoldSilver

Operating 100%-owned underground gold mine; September 2026 estimate maintains approximately six years of reserve life at the 30koz annual production target, subject to grade, cost and tailings approvals.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost4,248AUD/oz Au AISC FY2026

FY2026 Henty AISC from the June-quarter operating table; no issuer NPV was disclosed.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated3.5M tonnes3.27 g/t AuGold2026-06-30
Mineral ResourceInferred740K tonnes2.61 g/t AuGold2026-06-30
Ore ReserveProbable1.9M tonnes3.22 g/t AuGold2026-06-30
Tenements5
henty-7m-1991Granted— None · No expiry supplied
henty-5m-2002Granted— None · No expiry supplied
henty-7m-2006Granted— None · No expiry supplied
henty-el28-2001Granted— None · No expiry supplied
henty-el8-2009Granted— None · No expiry supplied
Milestones2
  1. Underground magazine relocation releases about 12.8koz into FY2027 plan

    Achieved · High materiality

  2. Submit next TSF-extension EIS to the EPA

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Operating mining and processing approvalsTasmaniaGranted—No
Next TSF extension environmental approvalTasmania EPAPending—Yes
Economic studies1
StudyStageStatusDateSummary
Current operating and reserve planOperating PlanCurrent2026-07-27Issuer July 2026 reserve plan supports about six years at approximately 30koz/y; positive NPV is stated without a disclosed amount. Analyst DCF is independent.

Material

Maldon Gold Project

Australia

Ramping Producer100% ownedGold

100%-owned Porcupine Flat plant and Union Hill mine; development and underground drilling commenced August 2026. The plant JV option could dilute the plant interest if Catalyst exercises it.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost10,563AUD/oz Au AISC FY2026

FY2026 combined A1 and Maldon AISC demonstrates subscale economics; no issuer NPV was disclosed.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred1.3M tonnes4.4 g/t AuGold2022-07-21
Mineral ResourceInferred stockpile570K tonnes0.48 g/t AuGold2026-02-11
Tenements4
maldon-min5146Granted— None · No expiry supplied
maldon-el8215Granted— None · No expiry supplied
maldon-min5528Granted— None · No expiry supplied
maldon-el7029Granted— None · No expiry supplied
Milestones2
  1. Refurbish Union Hill decline and establish underground drill platform

    Achieved · High materiality

  2. Start fully approved TSF4 construction

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Union Hill mining and Porcupine Flat processing approvalsVictoriaGranted—No
TSF4 construction and operation licenceVictoriaGranted—Yes
Economic studies1
StudyStageStatusDateSummary
Maldon stockpile-processing and Union Hill refurbishment planOperating PlanCurrent2026-07-31Current plan processes stockpile feed while refurbishing Union Hill and drilling district-scale targets.

Other

A1 Gold Mine

Australia

Care And Maintenance100% ownedGold

Mine remains on care and maintenance; 77,427t historical tailings Inferred Resource identified for potential processing at Maldon, subject to reclamation planning and economics.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceInferred tailings77.4K tonnes1.25 g/t AuGold2026-08-17
Tenements1
a1-min5294Granted— None · No expiry supplied

Other

New South Wales exploration tenements

Australia

Divested100% ownedGold

Stuart Town and Hill End exploration tenements remain listed at 100% beneficial interest but are subject to divestment.

Tenements3
nsw-el8491Granted— None · No expiry supplied
nsw-el8952Granted— None · No expiry supplied
nsw-el9757Granted— None · No expiry supplied