OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor KGL ASX

KGL Resources Limited

Construction · Copper · Silver · Gold · AU Rating locked: sign in to view v8.1 · kgl-20261030t220320-full
Last 2026-11-06
A$0.135
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$306.6M
EV
A$31.4M
Cash
A$275.4M
Debt
A$0

People, delivery and responsibility

Management background checks

Evidence through 2026-10-31

Research assessment

Executive team

Rating locked: sign in to viewTeam rating and score are available to subscribers

KGL has assembled a mining, project and finance team and reached financing and FID milestones, but mine construction and production remain to be delivered. Historic McArthur waste handling and the limited corroboration of several team members warrant attention. This is a partial, low-confidence screening.

Decision-relevant facts

Material summary

Individual involvement and employer context shown separately

Sam Strohmayr

Chief Executive Officer

Current
EnvironmentDocumented · High materiality

McArthur River waste-rock management and response

NT EPA says the mine’s pre-2014 waste classification substantially underestimated reactive rock. ABC reported that acid-forming rock was mistakenly placed in a separate facility and combusted; the error was discovered after emissions were observed in August 2016. The exact placement date is not established by that reporting. In December 2017, Strohmayr, then identified as site general manager, said the incident was investigated and controls changed; the NT government said the operator acted within its plan and remediation was prioritised. Independent-monitor reporting documented ongoing seepage and waste-rock risks, which Glencore acknowledged. In 2018 the EPA assessed the overburden-management proposal and recommended safeguards. In 2024 Traditional Owners raised concerns after flood erosion; the operator described superficial erosion and said the structure remained stable. Long-term closure outcomes remain unresolved.

Responsibility unresolved · Strohmayr was identified as site general manager when he discussed the investigation in December 2017. The placement date and his role at that time are not established by these sources; the evidence does not establish personal fault or a breach of law by him.

McArthur River mine dumps waste at wrong site · Incident, general-manager response and NT department position
McArthur independent monitor reports continuing waste risk · 2016 independent monitor reported in December 2017
Independent monitor report: McArthur River Mine · Page 1, company response to monitor
McArthur River Mine environmental assessment · Assessment report 86, overview and recommendations
Traditional owners raise concerns after McArthur flood · March 2024 flood, Traditional Owner concern and company response
Company SuccessIssuer Reported · Medium materiality

Financing and board decision reached; mine delivery remains ahead

KGL reports a US$300 million precious-metals financing package and a completed A$300 million equity raising; the remaining stream proceeds are subject to applicable conditions. On 15 October 2026 its board approved the Jervois final investment decision; the October quarterly says around 60% of project costs were covered by executed contracts. First copper concentrate remained targeted for the first half of 2028.

Role overlaps event; causation unproven · Strohmayr was CEO during these milestones; the source does not allocate responsibility or establish delivered production.

FY2026 annual report · Printed pages 2–7
September 2026 quarterly activities report · Page 2 and post-quarter final investment decision
Evidence gaps · 4
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • Original regulator investigation and detailed remedy evidence for the waste-rock placement were not obtained. The placement date, Strohmayr’s role at the time, and long-term closure and water outcomes remain unresolved.
  • Some prior-employer dates and individual responsibility for reported achievements remain unverified.

Full background report

Sam Strohmayr

Chief Executive Officer

Career chronology

Personal achievements

Mine-operating and metallurgy background

2010–2025 · issuer reported · medium materiality

KGL describes Strohmayr as Glencore Zinc Australia COO from February 2023 to April 2025, responsible for McArthur River and Mount Isa among other assets. A 2024 parliamentary transcript independently identifies him as COO; KGL reports an honours mineral-processing engineering degree and professional memberships.

Attribution: Individual involvement documented. The roles are documented; contribution to individual operating outcomes and credentials are not independently verified.

Relevance: Experience in mining, processing and execution is relevant to Jervois.

Appointment of Chief Executive Officer (Pages 1–2); Queensland parliamentary hearing into Mount Isa mine bill (Hearing, witness evidence); Equity raising presentation (Executive background section)

Contributions and company outcomes

Financing and board decision reached; mine delivery remains ahead

2026 · issuer reported · medium materiality

KGL reports a US$300 million precious-metals financing package and a completed A$300 million equity raising; the remaining stream proceeds are subject to applicable conditions. On 15 October 2026 its board approved the Jervois final investment decision; the October quarterly says around 60% of project costs were covered by executed contracts. First copper concentrate remained targeted for the first half of 2028.

Attribution: Role overlaps event; causation unproven. Strohmayr was CEO during these milestones; the source does not allocate responsibility or establish delivered production.

Relevance: Financing and execution readiness matter to the new development role.

FY2026 annual report (Printed pages 2–7); September 2026 quarterly activities report (Page 2 and post-quarter final investment decision); Major investment decision signals confidence in the Territory (16 October 2026, project decision)

Environmental record

McArthur River waste-rock management and response

Pre-2014 classification; placement date unestablished; discovered August 2016; response reported 2017; later context to 2024 · documented · high materiality

NT EPA says the mine’s pre-2014 waste classification substantially underestimated reactive rock. ABC reported that acid-forming rock was mistakenly placed in a separate facility and combusted; the error was discovered after emissions were observed in August 2016. The exact placement date is not established by that reporting. In December 2017, Strohmayr, then identified as site general manager, said the incident was investigated and controls changed; the NT government said the operator acted within its plan and remediation was prioritised. Independent-monitor reporting documented ongoing seepage and waste-rock risks, which Glencore acknowledged. In 2018 the EPA assessed the overburden-management proposal and recommended safeguards. In 2024 Traditional Owners raised concerns after flood erosion; the operator described superficial erosion and said the structure remained stable. Long-term closure outcomes remain unresolved.

Attribution: Responsibility unresolved. Strohmayr was identified as site general manager when he discussed the investigation in December 2017. The placement date and his role at that time are not established by these sources; the evidence does not establish personal fault or a breach of law by him.

Relevance: Relevant to management of sulphide waste, water and rehabilitation at a copper project.

McArthur River mine dumps waste at wrong site (Incident, general-manager response and NT department position); McArthur independent monitor reports continuing waste risk (2016 independent monitor reported in December 2017); Independent monitor report: McArthur River Mine (Page 1, company response to monitor); McArthur River Mine environmental assessment (Assessment report 86, overview and recommendations); Traditional owners raise concerns after McArthur flood (March 2024 flood, Traditional Owner concern and company response)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • Original regulator investigation and detailed remedy evidence for the waste-rock placement were not obtained. The placement date, Strohmayr’s role at the time, and long-term closure and water outcomes remain unresolved.

  • Some prior-employer dates and individual responsibility for reported achievements remain unverified.

A. Liaw

Chief Financial Officer (Anthony Liaw)

Current
Personal SuccessIssuer Reported · Medium materiality

Finance experience and disclosed professional designations

KGL says Anthony Liaw was its financial controller before being appointed CFO on 11 December 2023; it reports previous PwC and EY work and CPA and Chartered Tax Adviser designations. An issuer presentation identifies him as former Interflour Group CFO, corroborated by a university article quoting an Interflour CFO of that name.

Individual involvement documented · Role statements are supported, but credentials and precise Interflour dates were not independently checked.

CFO Appointment · Page 1
Accounting data and analytics internship · University article, Interflour CFO quotation
Company SuccessIssuer Reported · Medium materiality

Equity raising and financing agreement during CFO tenure

KGL completed an A$300 million equity raising and reported a US$300 million Wheaton precious-metals package, with remaining stream proceeds subject to conditions; its board subsequently approved the Jervois FID. Production remains a future target.

Role overlaps event; causation unproven · Liaw was CFO; source does not allocate individual negotiation or execution responsibility.

FY2026 annual report · Printed pages 2–4 and KMP page 33
Evidence gaps · 3
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • Exact prior employment dates and independent membership-register confirmation are unavailable.

Full background report

A. Liaw

Chief Financial Officer (Anthony Liaw)

Career chronology

Personal achievements

Finance experience and disclosed professional designations

Before and since December 2023 · issuer reported · medium materiality

KGL says Anthony Liaw was its financial controller before being appointed CFO on 11 December 2023; it reports previous PwC and EY work and CPA and Chartered Tax Adviser designations. An issuer presentation identifies him as former Interflour Group CFO, corroborated by a university article quoting an Interflour CFO of that name.

Attribution: Individual involvement documented. Role statements are supported, but credentials and precise Interflour dates were not independently checked.

Relevance: Finance and capital funding experience are relevant to a mine under construction.

CFO Appointment (Page 1); Investor presentation October 2025 (Page 14); Accounting data and analytics internship (University article, Interflour CFO quotation)

Contributions and company outcomes

Equity raising and financing agreement during CFO tenure

April–October 2026 · issuer reported · medium materiality

KGL completed an A$300 million equity raising and reported a US$300 million Wheaton precious-metals package, with remaining stream proceeds subject to conditions; its board subsequently approved the Jervois FID. Production remains a future target.

Attribution: Role overlaps event; causation unproven. Liaw was CFO; source does not allocate individual negotiation or execution responsibility.

Relevance: Financing is relevant to the project’s ability to proceed.

FY2026 annual report (Printed pages 2–4 and KMP page 33); September 2026 quarterly activities report (Post-quarter FID)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • Exact prior employment dates and independent membership-register confirmation are unavailable.

Kylie Anderson

Company Secretary

Current
Personal SuccessIssuer Reported · Medium materiality

Longstanding company secretary and former interim CEO

KGL reports Anderson has been company secretary since 2 January 2008, briefly held the CEO role during 2024, and previously held resources-sector finance and secretarial positions including Felix Resources and Rio Tinto. It lists BSc, MBA (International Business), MPA and MAICD. A January 2014 Carabella takeover statement is signed by Kylie Anderson as its company secretary.

Individual involvement documented · Appointments are issuer-reported and Carabella role is documented; qualifications and full employment periods are not independently verified.

FY2026 annual report · Printed page 32 secretary biography
FY2025 annual report · Printed pages 36–37, secretary biography and interim CEO transition
Evidence gaps · 3
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • Independent confirmation of qualifications and complete Felix and Rio Tinto tenure is unavailable.

Full background report

Kylie Anderson

Company Secretary

Career chronology

Personal achievements

Longstanding company secretary and former interim CEO

2008–2026; prior appointments undated · issuer reported · medium materiality

KGL reports Anderson has been company secretary since 2 January 2008, briefly held the CEO role during 2024, and previously held resources-sector finance and secretarial positions including Felix Resources and Rio Tinto. It lists BSc, MBA (International Business), MPA and MAICD. A January 2014 Carabella takeover statement is signed by Kylie Anderson as its company secretary.

Attribution: Individual involvement documented. Appointments are issuer-reported and Carabella role is documented; qualifications and full employment periods are not independently verified.

Relevance: Corporate governance and reporting continuity matter during funding and construction.

FY2026 annual report (Printed page 32 secretary biography); Carabella first supplementary target statement (Page 1 signature); FY2025 annual report (Printed pages 36–37, secretary biography and interim CEO transition)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • Independent confirmation of qualifications and complete Felix and Rio Tinto tenure is unavailable.

Konrad Litfin

Project Director (June 2026 issuer disclosure; continuation unconfirmed)

Current
Personal SuccessIssuer Reported · Medium materiality

Project-delivery career and uncertain current mandate

KGL’s 25 June 2026 presentation names Konrad Litfin as project director. Axiom’s undated same-name biography describes civil engineering, Ausenco, Cross River Rail and a MACH Energy Rail 2 project director role, but dates and the exact current Axiom/KGL arrangement were not independently verified.

Individual involvement documented · KGL directly names the project director; independent identity linkage and employer terms remain limited.

Equity raising presentation · Issuer equity raising presentation 25 June 2026, page 35, Senior Management
Konrad Litfin professional profile · Career interview and qualifications
Evidence gaps · 4
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • Continued KGL project-director role at 31 October and exact contract/employer arrangements are unconfirmed.
  • Axiom biography is undated and independent matching of same-name project records is limited.

Full background report

Konrad Litfin

Project Director (June 2026 issuer disclosure; continuation unconfirmed)

Career chronology

  • Listed in June 2026; exact appointment and continuation unconfirmed: KGL Resources — Project Director (last issuer-confirmed June 2026). Equity raising presentation (Issuer equity raising presentation 25 June 2026, page 35, Senior Management)

  • Period and current status not independently confirmed: Axiom Project Services — Infrastructure and delivery lead. Konrad Litfin professional profile (Professional profile, qualifications and career interview)

Personal achievements

Project-delivery career and uncertain current mandate

Career undated; KGL role confirmed in June 2026 · issuer reported · medium materiality

KGL’s 25 June 2026 presentation names Konrad Litfin as project director. Axiom’s undated same-name biography describes civil engineering, Ausenco, Cross River Rail and a MACH Energy Rail 2 project director role, but dates and the exact current Axiom/KGL arrangement were not independently verified.

Attribution: Individual involvement documented. KGL directly names the project director; independent identity linkage and employer terms remain limited.

Relevance: Construction leadership is central to Jervois execution.

Equity raising presentation (Issuer equity raising presentation 25 June 2026, page 35, Senior Management); Konrad Litfin professional profile (Career interview and qualifications)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • Continued KGL project-director role at 31 October and exact contract/employer arrangements are unconfirmed.

  • Axiom biography is undated and independent matching of same-name project records is limited.

Atiq Amiri

Exploration Manager (June 2026 issuer disclosure; continuation unconfirmed)

Current
Personal SuccessIssuer Reported · Medium materiality

Signed issuer exploration results

KGL identifies Amiri as the competent person responsible for compiled Rockface Deeps exploration results in its 2024 announcement and listed him as exploration manager in June 2026. The issuer reports relevant AIG membership and more than five years of experience for that statement.

Individual involvement documented · The document identifies his direct compilation role; discovery economics and membership were not independently verified.

Rockface Deeps drilling announcement · Competent Person Statement
Equity raising presentation · Issuer equity raising presentation 25 June 2026, page 35, Senior Management
Evidence gaps · 4
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • His role’s continuity through 31 October 2026 and precise prior-company history are unconfirmed.
  • Independent AIG register and degree evidence were not obtained.

Full background report

Atiq Amiri

Exploration Manager (June 2026 issuer disclosure; continuation unconfirmed)

Career chronology

  • KGL full-time employee in 2024; manager listed June 2026; exact dates unconfirmed: KGL Resources — Exploration Manager / exploration competent person. Equity raising presentation (Issuer equity raising presentation 25 June 2026, page 35, Senior Management); Rockface Deeps drilling announcement (Competent Person Statement)

Personal achievements

Signed issuer exploration results

2024–June 2026 · issuer reported · medium materiality

KGL identifies Amiri as the competent person responsible for compiled Rockface Deeps exploration results in its 2024 announcement and listed him as exploration manager in June 2026. The issuer reports relevant AIG membership and more than five years of experience for that statement.

Attribution: Individual involvement documented. The document identifies his direct compilation role; discovery economics and membership were not independently verified.

Relevance: Exploration data quality and resource growth are relevant to Jervois.

Rockface Deeps drilling announcement (Competent Person Statement); Equity raising presentation (Issuer equity raising presentation 25 June 2026, page 35, Senior Management)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • His role’s continuity through 31 October 2026 and precise prior-company history are unconfirmed.

  • Independent AIG register and degree evidence were not obtained.

Megan Sharp

ESG (June 2026 issuer disclosure; continuation unconfirmed)

Current
Personal SuccessIssuer Reported · Medium materiality

Environmental assessment and prior regulator experience

The Jervois EIS identifies Megan Sharp of Nitro Solutions as a principal consultant and reviewer of the 2018 environmental management plan. The EIS biography reports earlier Queensland mining-regulator work. KGL’s June 2026 presentation lists her in an ESG role; the current engagement’s terms and continuation are not established.

Individual involvement documented · The 2018 project documents name the reviewer; exact earlier regulator dates and current role terms remain unconfirmed.

Jervois EIS personnel qualifications and experience · Personnel appendix, Sharp biography
Equity raising presentation · Issuer equity raising presentation 25 June 2026, page 35, Senior Management
Evidence gaps · 4
  • Independent full employment chronology and credentials were not established.
  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.
  • Continuing ESG role and external-consultancy arrangements at the evidence cutoff are not independently verified.
  • Independent credentials and detailed prior government employment dates are unavailable.

Full background report

Megan Sharp

ESG (June 2026 issuer disclosure; continuation unconfirmed)

Career chronology

Personal achievements

Environmental assessment and prior regulator experience

2018–June 2026 · issuer reported · medium materiality

The Jervois EIS identifies Megan Sharp of Nitro Solutions as a principal consultant and reviewer of the 2018 environmental management plan. The EIS biography reports earlier Queensland mining-regulator work. KGL’s June 2026 presentation lists her in an ESG role; the current engagement’s terms and continuation are not established.

Attribution: Individual involvement documented. The 2018 project documents name the reviewer; exact earlier regulator dates and current role terms remain unconfirmed.

Relevance: Environmental and community expertise is relevant to Jervois permitting and construction.

Jervois EIS personnel qualifications and experience (Personnel appendix, Sharp biography); Jervois draft environmental management plan (Document control page 2); Equity raising presentation (Issuer equity raising presentation 25 June 2026, page 35, Senior Management)

Evidence gaps

  • Independent full employment chronology and credentials were not established.

  • The searches described are open-web screening; complete court, regulator, sanctions and criminal-record checks were not performed.

  • Continuing ESG role and external-consultancy arrangements at the evidence cutoff are not independently verified.

  • Independent credentials and detailed prior government employment dates are unavailable.