OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor KP2 ASX (CDIs); also AIM and JSE

Kore Potash plc

DFS Unfunded Developer · Potash · CG Rating locked: sign in to view v8.1 · kp2-20261104t223111-full
Last 2026-11-05
A$0.072
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$372.7M
EV
A$364.2M
Cash
US$6.4M
Debt
US$0

Portfolio detail

Assets

4 assets

Core asset

Kola sylvinite project (Kola Potash Mining S.A.)

CG

DFS Unfunded Developer97.58% ownedPotash

Optimised DFS economics; construction unfunded; ESIA update paused; Mining Convention construction-start deadline 8 June 2027.

Developer · DFS unfunded developer
Study
Optimised DFS (Kola Optimisation Study Update)
Post-tax NPV (study prices, attributable)
US$1.6bd
NPV restated at our deck (attributable)
Locked
IRR
1,800.0%s
Initial capex (100%)
US$2.1bs
Capital intensity
US$941/(t/yr)d
LoM AISC
A$140/td
Mine life
23.0 yrss

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVUS$1.7B10% discount
IRR18%Published return
Initial capexUS$2.1BPublished capital estimate
Operating cost88USD/t MoP

post-tax real NPV10, ungeared, 90% attributable basis (after RoC 10% carry), average MoP US$449/t

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (inclusive of reserves)848 Mt34.8% KClPotash2025-02-27
Ore Reserveproved and probable152 Mt32.5% KClPotash2025-02-27
Tenements1
kola-mining-permitGranted— None · No expiry supplied
Milestones3
  1. Construction start required under the Mining Convention

    At Risk · High materiality

  2. Financial close on the Kola project finance and royalty package (OWI-RAMS term sheets, non-binding)

    Pending · High materiality

  3. Resume ESIA update and RAP once investor design changes are confirmed

    Delayed · High materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
Mining Convention (ratified; stabilisation clause)Republic of CongoGranted—No
ESIA update for Kola (amended 2018 approval, update paused)Republic of CongoPending—Yes
Declaration of public utility (DUP) and Relocation Action PlanRepublic of CongoPending—Yes
Economic studies1
StudyStageStatusDateSummary
Kola Optimisation Study Update (Optimised DFS)Updated FeasibilityCurrent2025-02-2723-year life at 2.2 Mtpa MoP; NPV10 real post-tax US$1,675m on a 90% attributable basis; IRR 18%; US$2.07bn nominal capital; US$449/t average price; construction start assumed 1 Jan 2026.

Material

DX sylvinite project (Dougou Potash Mining S.A.)

CG

PFS Developer97.58% ownedPotash

2023 PFS production target; no current study; strategic options including a possible sale under review.

Developer · PFS developer
Study
Updated PFS and production target (DX)
Post-tax NPV (study prices, attributable)
US$268.3md
NPV restated at our deck (attributable)
Locked
IRR
2,730.0%s
Initial capex (100%)
US$315.7ms
Capital intensity
US$786/(t/yr)d
LoM AISC
—
Mine life
12.0 yrss

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
NPVUS$275MPublished value
IRR27.3%Published return
Initial capexUS$315.7MPublished capital estimate

post-tax real NPV10 on 90% attributable basis, flat US$450/t MoP; discount rate not restated in the source read

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (inclusive of reserves)129 Mt24.8% KClPotash2023-01-24
Ore Reserveproved and probable9.3 Mt35.7% KClPotash2023-01-24
Tenements1
dougou-mining-permitGranted— None · No expiry supplied
Milestones1
  1. DX strategic options review (including a sale) reported in the Q3 2026 report

    Pending · Medium materiality

Economic studies1
StudyStageStatusDateSummary
Updated Dougou Extension PFS and Production TargetPFSCurrent2023-01-24Production target 15.5 Mt sylvinite, 4.82 Mt MoP over 12 years at a flat US$450/t; NPV10 real post-tax US$275m (90% basis); IRR 27.3%; capex US$315.7m.

Other

Dougou carnallite resource (Dougou Potash Mining S.A.)

CG

Resource Stage97.58% ownedPotash

Large carnallite resource; no current mine plan or study.

Resource / scoping · Resource stage
Contained metal (attributable)
618.4m td
Resource grade
20.7%
% Measured + Indicated
34.8%d
Resource tonnes
3,056.00 Mt
Our value per attrib. contained unit
Locked
Mining method
—

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (inclusive of reserves)3.1K Mt20.7% KCl carnallitePotash2026-09-30

Other

Kola carnallite resource (Kola Potash Mining S.A.)

CG

Resource Stage97.58% ownedPotash

Carnallite resource beneath and around the Kola sylvinite; no mine plan.

Resource / scoping · Resource stage
Contained metal (attributable)
369.3m td
Resource grade
18.5%
% Measured + Indicated
37.5%d
Resource tonnes
2,049.00 Mt
Our value per attrib. contained unit
Locked
Mining method
—
Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (inclusive of reserves)2K Mt18.5% KCl carnallitePotash2026-09-30

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)