OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor OMH Australian Securities Exchange

OM Holdings Limited

Producer · Manganese · Others · Malaysia · Singapore · Australia · China Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.22
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$168.2M
EV
—
Cash
US$48.8M
Debt
US$181.1M

Portfolio detail

Assets

4 assets

Core asset

OM Sarawak integrated ferroalloy smelting and trading platform

Malaysia · Singapore

Producer100% ownedManganeseOthers

All 16 furnaces had completed major maintenance by FY2025 year-end; the issuer reported US$265.2m group revenue and US$30.3m gross profit for 1H2026. The number of furnaces operating at the half-year cutoff was not established from accessible primary evidence. The August Butcherbird take-or-pay feedstock agreement remains subject to approvals and project financing.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Milestones1
  1. Complete silica fume densification silo commissioning

    At Risk · Low materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Department of Environment approval for additional silicomanganese slag repurposingMalaysiaGranted2027-12-31No
Economic studies1
StudyStageStatusDateSummary
FY2025 operating configurationOperating PlanCurrent2026-04-22Sixteen 25.5 MVA furnaces with design capacity of 120-126ktpa ferrosilicon, 333-400ktpa manganese alloys and 21-24.5ktpa silicon metal, plus a 250ktpa sinter plant.

Material

Bootu Creek manganese mine

Australia

Care And Maintenance100% ownedManganese

Mining ceased in December 2021 and processing ceased in January 2022. The operation remained under care and maintenance in FY2025 with rehabilitation continuing, no current mine plan and no reported ore reserves. No funded restart plan or refreshed feasibility case was identified by the cutoff.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated including in-situ, ROM, SPP, UFP rejects and tailings6.9M tonnes13.19% Mn combined; in-situ resource 1.66Mt at 22.75% MnManganese2025-12-31
Tenements2
ml24031Granted— None · No expiry supplied
el28041Granted— None · No expiry supplied
Milestones1
  1. Deferred Bootu Creek and Renner Springs exploration programs

    Pending · Medium materiality

Material

Bryah Basin Manganese Joint Venture

Australia

Resource Stage60% ownedManganese

OMM earned a 60% joint-venture interest in December 2024. The August 2023 JORC resource totals 3.066Mt at 20.2% Mn across Area 74, Brumby Creek, Horseshoe, Redrum and Black Hill.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated2.1M tonnes20.9% Mn and 21.5% Fe at 15% Mn cut-offManganese2023-08-24
Mineral ResourceInferred994K tonnes18.6% Mn and 26.1% Fe at 15% Mn cut-offManganese2023-08-24
Tenements3
m52-806Granted— None · No expiry supplied
m52-1087Granted— None · No expiry supplied
m52-1088Granted— None · No expiry supplied
Milestones1
  1. Grant of M52/1087 and M52/1088 over resource areas

    Achieved · High materiality

Other

OM Materials Qinzhou retained associate interest

China

Care And Maintenance40% ownedManganese

OMQ manganese-alloy smelting production has been suspended since December 2021 due to elevated power tariffs. OMH sold 60% in September 2025 and retained a 40% associate interest. No recurring distributions or restart timetable were identified.