XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor VUL ASX (primary) and Frankfurt Stock Exchange Prime Standard

Vulcan Energy Resources Limited

Construction · Lithium · DE · FR · IT Rating locked: sign in to view v8.1 · vul-20261031t172753-full
Last 2026-11-06
A$1.115
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$533.7M
EV
A$239.3M
Cash
€129.4M
Debt
€0

Portfolio detail

Assets

3 assets

Core asset

Phase One Lionheart (Landau geothermal and lithium extraction, Frankfurt chemicals)

DE

Construction72.7% ownedLithium

Under construction since FID on 3 December 2025 and Financial Close in May 2026; seven wells drilled or drilling (four historical operating), 30MW geothermal plant civil works under way, ICPP section 1 under construction, first commercial LHM targeted for 2028; reported on schedule and within budget. Economic interest is 72.7% after the 14.49% KfW stake in the German holding company and the strategic investors InvestmentCo 10.35% (rising to 15% by PIK).

Developer · Construction
Study
FID case (updated End of Validation Study), December 2025
Post-tax NPV (study prices, attributable)
€837.5md
NPV restated at our deck (attributable)
Locked
IRR
1,370.0%s
Initial capex (100%)
€1.5bs
Capital intensity
€69,953/(t/yr)d
LoM AISC
—
Mine life
30.0 yrss
Published study economicsIssuer or study metrics
NPV€1.2B8% discount
IRR13.7%Published return
Initial capex€1.5BPublished capital estimate
Operating cost3,588EUR/t LHM

100% basis, unlevered, nominal 8%, mid-period, valuation date 28 November 2025; pre-tax NPV8 EUR1,838m

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured2.1M t LCE181 mg/L LiLithium2025-12-31
Mineral ResourceIndicated2M t LCE181 mg/L LiLithium2025-12-31
Ore ReserveProved and Probable570K t LCE181 mg/L LiLithium2025-12-31
Tenements3
t-insheimGranted11.2 km2 · 2037-12-31
t-landauGranted5.2 km2 · 2034-12-31
t-riftGranted61.83 km2 · 2027-06-30
Milestones6
  1. Final investment decision and construction start

    Achieved · High materiality

  2. Financial close of the EUR2.2bn package

    Achieved · High materiality

  3. First strategic equity and grant drawdowns

    Achieved · High materiality

  4. First senior debt drawdown

    Pending · High materiality

  5. ICPP section 1 completion

    Pending · Medium materiality

  6. First commercial LHM production

    Pending · High materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
Major construction permits for Phase OneRhineland-Palatinate and HesseGranted—Yes
Ilka lithium production licence (granted 9 Sept 2026)Rhineland-PalatinateGranted—Yes
Lithium field-royalty exemption to 31 Dec 2030Rhineland-PalatinateGranted2030-12-31No
Economic studies2
StudyStageStatusDateSummary
Lionheart FID case (updated End of Validation Study)Updated FeasibilityCurrent2025-12-03Post-tax NPV8 EUR1,152m, unlevered post-tax IRR 13.7%, capex EUR1,476m, average realised 10-year LHM price EUR20,456/t, C1 EUR3,588/t LHM (real), 24ktpa LHM for 30 years.
End of Validation Study (December 2024)DFSSuperseded2024-12-11Post-tax NPV8 EUR2,173m at EUR22,355/t LHM and capex EUR1,431m; superseded by the FID case (lower price deck, 15% contingency, later start).

Material

Project Ludwig (Phase Two, Ludwigshafen)

DE

PFS Developer85.5% ownedLithium

PFS released 3 September 2026: 21.1ktpa battery-grade lithium carbonate and 3,125GWh/yr heat for EUR1,261m (real 2026); FID only after Lionheart starts production; asset-level financing with strategic partners being sought.

Developer · PFS developer
Study
Preliminary Feasibility Study (PFS), 3 September 2026
Post-tax NPV (study prices, attributable)
€1.5bd
NPV restated at our deck (attributable)
Locked
IRR
2,020.0%s
Initial capex (100%)
€1.3bs
Capital intensity
€59,763/(t/yr)d
LoM AISC
—
Mine life
30.0 yrss
Published study economicsIssuer or study metrics
NPV€1.7B8% discount
IRR20.2%Published return
Initial capex€1.3BPublished capital estimate
Operating cost4,101EUR/t Li2CO3

100% equity, unlevered, nominal 8%, FID assumed 2029; pre-tax NPV8 EUR2,607m

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated1.3M t LCE155 mg/L LiLithium2026-09-03
Mineral ResourceInferred2.2M t LCE155 mg/L LiLithium2026-09-03
Tenements2
t-ludwigGranted96.34 km2 · 2027-12-31
t-thereseGranted81.12 km2 · 2027-12-31
Milestones1
  1. Ludwig FID (after Lionheart production starts)

    Pending · Medium materiality

Economic studies1
StudyStageStatusDateSummary
Project Ludwig PFSPFSCurrent2026-09-03Post-tax NPV8 EUR1,727m at assumed 2029 FID, post-tax IRR 20.2%, capex EUR1,261m, C1 EUR4,101/t Li2CO3, Li2CO3 EUR20,588/t real 2026.

Other

Upper Rhine future-phase licences (Mannheim, Ortenau, Kerner, Flaggenturm, Taro and others)

DE · FR · IT

Resource Stage85.5% ownedLithium

Exploration-stage licences holding about 22.2Mt LCE of the 29.8Mt group resource beyond Lionheart and Ludwig; Mannheim 3D seismic reprocessing and an airborne survey under way, portfolio review to relinquish weaker licences; French licence in legal dispute.

Resource / scoping · Resource stage
Contained metal (attributable)
19.0m td
Resource grade
NM
% Measured + Indicated
31.4%d
Resource tonnes
NM
Our value per attrib. contained unit
Locked
Mining method
—
Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceIndicated7M t LCE155-181 mg/L LiLithium2026-09-30
Mineral ResourceInferred15.2M t LCE155-181 mg/L LiLithium2026-09-30
Tenements2
t-ortenauGranted374.1 km2 · 2028-12-31
t-mannheimGranted144.49 km2 · 2027-06-30

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)