OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor VUL ASX (primary) and Frankfurt Stock Exchange Prime Standard

Vulcan Energy Resources Limited

Construction · Lithium · DE · FR · IT Rating locked: sign in to view v8.1 · vul-20261031t172753-full
Last 2026-11-06
A$1.115
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$533.7M
EV
A$239.3M
Cash
€129.4M
Debt
€0

Narrative and provenance

Research & Sources

AI Analyst Report

The full analyst report, its figures and the broker-style PDF are available to subscribers and invited guests.

Sign in or enter a guest code
Chronological evidenceSource-document inventory19 documents
Market snapshot (miners.v8db.market_snapshot VUL --cutoff 2026-10-31)Market Data · HighExtracted

Local snapshot at the cutoff: 52-week range A$1.035-6.84, returns 1m -38.0%, 3m -54.9%, 12m -81.6%, 3y -44.4% (relative to the mining index -27.9%, -50.4%, -90.5%, -84.9%), 20-day average traded value A$6.66m, market cap A$550.5m on 478.66m shares; no published peer shares the lithium commodity in the stock database (peers added from outside research).

Document ID
market-snapshot-2026-10-31
Published UTC
2026-10-30T22:00:00Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Quarterly Activities Report - Period Ending 30 September 2026Operations · HighExtracted

Lionheart construction on schedule and within budget: seventh well LSC-3a injection test about 64 sL/s versus 40 sL/s assumption, Ilka production licence granted, ICPP section 1 under construction, 30MW geothermal plant civil works started. EUR53.7m of strategic equity and EUR10.7m of grants drawn; cash EUR129.4m plus EUR80.0m deposits (EUR209.4m). Q3 development spend EUR88.8m (YTD EUR256.8m). Project Ludwig PFS released; Ms Amanda Lacaze appointed director and Mr Angus Barker became independent chair.

Document ID
q3-2026
Published UTC
2026-10-29T21:06:44Z
Projects
lionheart · ludwig · urvbf-pipeline
Commodities
lithium
Open original source ↗
Quarterly Cashflow Report - Period Ending 30 September 2026Results · MediumExtracted

Appendix 5B for the quarter ended 30 Sep 2026: operating cash flow EUR-11.1m, payments for property, plant and equipment EUR88.8m, closing cash EUR129.4m.

Document ID
cf-q3-2026
Published UTC
2026-10-29T21:05:19Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Corporate Presentation - Q4 2026Presentation · HighExtracted

October 2026 presentation: Lionheart FID-case metrics (post-tax NPV8 EUR1,152m, capex EUR1,476m, 24kt LHM, 570kt LCE reserves), offtake table (LG Energy Solution 31kt/6y, Umicore 23kt/6y, Stellantis 128kt/10y, Glencore 40kt/8y; 63% floor-ceiling, 9% fixed, 28% floating), global resource 29.8Mt LCE (Sept 2026), shares about 478m, top holders (HOCHTIEF 15.4%, Van Eck 5.0%, Bank Hapoalim 4.0%, Hancock 3.7%, State Street 3.4%), directors and key management, analyst coverage.

Document ID
pres-q4-2026
Published UTC
2026-10-29T21:07:39Z
Projects
lionheart · ludwig · urvbf-pipeline
Commodities
lithium
Open original source ↗
VUL.AX ASX close 30 October 2026 (miners.reference_price)Market Data · HighExtracted

Local reference-price lookup `python -m miners.reference_price VUL --valuation-date 2026-10-31`: raw ASX close A$1.15 on 2026-10-30 (open 1.30, high 1.30, low 1.135), volume 6,906,217, provider market data provider via miners.collect_stock_prices, security basis one ASX VUL ordinary share, freshness 1 day.

Document ID
vul-close-2026-10-30
Published UTC
2026-10-30T06:40:15Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Guangzhou Futures Exchange lithium carbonate settlement 29 October 2026 (local metal_prices.db)Commodity Data · HighExtracted

GFEX most-active lithium carbonate futures settlement CNY91,140/t on 2026-10-29 (VAT-inclusive), versus CNY189,000-205,000 in May 2026, 1-year average CNY142,908, low CNY77,580; October 2026 average CNY101,408 and monthly series from 2025. Converted at AUD/CNY 4.7177 and AUD/USD 0.6941 and removing 13% VAT gives about US$11,870/t LCE.

Document ID
gfex-lithium-2026-10-29
Published UTC
2026-10-29T07:00:00Z
Projects
lionheart
Commodities
lithium
Open original source ↗
AUD cross rates (local metal_prices.db fx_rates)Market Data · HighExtracted

AUD/USD 0.6941, AUD/EUR 0.6072, AUD/CNY 4.7177 at 30 October 2026 (A$1 buys EUR0.6072; EUR1 = A$1.6469; EUR/USD 1.143).

Document ID
fx-2026-10-30
Published UTC
2026-10-30T06:40:15Z
Projects
lionheart
Commodities
lithium
Open original source ↗
ASX lithium peer closes and market capitalisations (local asx_mining_companies.db, 30 October 2026)Market Data · HighExtracted

Local ASX mining database: closes on 2026-10-30 of PLS A$2.64, LTR A$0.62, CXO A$0.21, EMH A$0.14 and INF A$0.005; share counts implied from the database market capitalisation and price at the 9 August 2026 refresh (market cap divided by latest price); 12-month returns from daily closes. Resource figures for EMH (Cinovec 7.39Mt LCE) and INF (San Jose 1.68Mt LCE) are taken from the company peer table in the December 2025 offer pack.

Document ID
peer-prices-2026-10-30
Published UTC
2026-10-30T06:40:15Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Lithium Daily: lithium prices in negative, still with players pricing 2027 supply-demand expectations (Mysteel)Commodity Data · MediumExtracted

Mysteel 15 October 2026: GFEX most-traded lithium carbonate contract fell 4.3% intraday as traders priced an expected 2027 surplus rather than October production; October battery and cathode output rose month on month (LFP cathode +3.6%) without lifting futures. No absolute price quoted in the article; used for market direction only, dated.

Document ID
mysteel-lithium-2026-10-15
Published UTC
2026-10-15T01:25:00Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Half Year Report for the Period Ending 30 June 2026Results · HighExtracted

Reviewed half-year accounts to 30 June 2026 (EUR): revenue EUR2.3m, EBITDA EUR-33.7m, loss EUR51.8m; cash EUR193.9m plus EUR80.0m term deposits and EUR39.7m restricted cash in other financial assets; equity EUR825.5m including EUR141.3m non-controlling interest from the KfW (14.49% of the German holding company) and Sequana InvestmentCo (10.35% of PlatformCo, PIK to 15%) investments; 478.66m shares; lease liabilities EUR30.7m; capital commitments EUR374.6m; no dividend.

Document ID
hy-2026
Published UTC
2026-09-09T22:20:38Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Interim Management Report 2026Governance · MediumPartial

German-format interim group management report: lithium and geothermal market outlook, EU and German policy measures (Industrial Accelerator Act, Battery Booster, Critical Raw Materials Act), capex and opex outlook (capex elevated through 2026, underlying opex stable in H2 2026), 444 employees (435 FTE) at 30 June 2026.

Document ID
imr-2026
Published UTC
2026-09-09T22:20:48Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Phase Two Preliminary Feasibility Study (Project Ludwig)Study · HighExtracted

Project Ludwig PFS: 21.1ktpa battery-grade lithium carbonate, 3,125 GWh/yr heat, capex EUR1,261m (real 2026), C1 EUR4,101/t, pre-tax NPV8 EUR2,607m and post-tax NPV8 EUR1,727m at assumed 2029 FID, post-tax IRR 20.2%; lithium carbonate price EUR20,588/t real 2026, 2% inflation, 25.425% combined tax; Indicated resource up to 1,251kt LCE; FID only after Lionheart starts production, with asset-level partner financing.

Document ID
pfs-ludwig-2026
Published UTC
2026-09-02T22:18:29Z
Projects
ludwig
Commodities
lithium
Open original source ↗
Quarterly Cashflow Report - Period Ending 30 June 2026Results · MediumExtracted

Appendix 5B for the quarter ended 30 Jun 2026: operating cash flow EUR-7.4m, payments for property, plant and equipment EUR92.0m, closing cash EUR193.9m.

Document ID
cf-q2-2026
Published UTC
2026-07-28T22:23:59Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Quarterly Cashflow Report - Period Ending 31 March 2026Results · MediumExtracted

Appendix 5B for the quarter ended 31 Mar 2026: operating cash flow EUR-6.4m, payments for property, plant and equipment EUR76.0m.

Document ID
cf-q1-2026
Published UTC
2026-04-29T22:26:55Z
Projects
lionheart
Commodities
lithium
Open original source ↗
German State grants royalty exemption for lithium productionPermitting · MediumExtracted

Rhineland-Palatinate granted a lithium field-royalty exemption for an initial five years to 31 December 2030 with a review one year earlier; geothermal royalty has been exempt since 2009. Lionheart upstream facilities are in the state and benefit.

Document ID
royalty-2026
Published UTC
2026-04-12T22:52:11Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Annual Report - Period Ending 31 December 2025Results · HighExtracted

FY2025 audited accounts in EUR: revenue EUR7.35m, EBITDA EUR-55.3m, loss after tax EUR69.6m, operating cash flow EUR-47.7m, plant and equipment payments EUR48.2m. Cash EUR517.8m at 31 Dec 2025 after EUR586m equity raised; 477.87m shares at 31 Dec 2025 (214.53m at 31 Dec 2024). Resource and reserve statement (Lionheart ore reserve 570kt LCE at wellhead; 29.1Mt LCE total resource), 20 March 2026 top-20 register (HOCHTIEF 15.41%, Van Eck 5.04%) and board skills matrix.

Document ID
ar-2025
Published UTC
2026-03-26T21:16:42Z
Projects
lionheart · ludwig · urvbf-pipeline
Commodities
lithium
Open original source ↗
Quarterly Cashflow Report Period Ending 31 December 2025Results · MediumExtracted

Appendix 5B for the quarter ended 31 Dec 2025: operating cash flow EUR-7.2m, payments for property, plant and equipment EUR14.9m.

Document ID
cf-q4-2025
Published UTC
2026-01-30T01:36:55Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Opening of Retail Entitlement Offer (financing and FID presentation, offer booklet)Financing · HighExtracted

December 2025 offer pack containing the 3 December 2025 FID and financing presentation: EUR2,200m Phase One package (EUR1,185m senior debt from 13 financiers, EUR204m grants, EUR150m KfW for 14% of the German holding company, EUR133m consortium equity for 10-15% of the project entity, EUR528m underwritten equity at A$4.00), uses of funds, capex profile (EUR73m/481m/575m/296m/52m 2025-2029), FID-case economics (NPV8 post-tax EUR1,152m at 28 Nov 2025, 8% nominal), key risks.

Document ID
fid-pack-2025
Published UTC
2025-12-09T21:55:35Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Successful completion of Institutional Placement and Institutional Entitlement Offer bookbuildFinancing · HighExtracted

A$4.00 (EUR2.24) fully underwritten placement and 1-for-1.128 accelerated entitlement offer raised EUR398m from about 178m shares; HOCHTIEF sub-underwrote up to EUR130m of retail shortfall; includes the FID-case versus EOV economics table (EUR20,456/t average 10-year LHM price, EBITDA EUR427m, capex EUR1,476m, NPV8 post-tax EUR1,152m).

Document ID
placement-2025-12
Published UTC
2025-12-03T22:12:21Z
Projects
lionheart
Commodities
lithium
Open original source ↗
Evidence facts37
ar25-revRevenue FY2025

7350000 EUR

2025-12-31
ar25-ebitdaEBITDA FY2025

-55291000 EUR

2025-12-31
ar25-npatLoss after income tax FY2025

-69575000 EUR

2025-12-31
ar25-ocfNet cash used in operating activities FY2025

-47734000 EUR

2025-12-31
ar25-cashCash and cash equivalents

517839000 EUR

2025-12-31
ar25-sharesShares on issue 31 Dec 2025

477870976 shares

2025-12-31
ar25-shares-pyShares on issue 31 Dec 2024

214527816 shares

2024-12-31
ar25-reserveLionheart proved and probable reserve at wellhead (318kt + 252kt LCE)

570000 t LCE

2025-12-31
ar25-hochtiefHOCHTIEF Lithium Holding shareholding

15.41 percent

2026-03-20
hy26-equityTotal equity 30 Jun 2026

825484000 EUR

2026-06-30
hy26-nciNon-controlling interest

141299000 EUR

2026-06-30
hy26-kfwKfW interest in Vulcan Energie Ressourcen GmbH

14.49 percent

2026-05-27
hy26-seqSequana InvestmentCo preferred-share interest in VER GEO LIO GmbH

10.35 percent

2026-05-27
hy26-sharesShares on issue 30 Jun 2026

478660737 shares

2026-06-30
hy26-commitCapital commitments

374633000 EUR

2026-06-30
hy26-dpsDividends declared

0 EUR/share

2026-06-30
q326-cashClosing cash plus deposits accessible after 90 days

209400000 EUR

2026-09-30
q326-devDevelopment expenditure in the quarter

88800000 EUR

2026-09-30
q326-equityStrategic equity received in the quarter

53700000 EUR

2026-09-30
q326-grantGrant instalments received in the quarter

10700000 EUR

2026-09-30
pres26-npvLionheart FID-case post-tax NPV8 (100%)

1152000000 EUR

2025-11-28
pres26-capexLionheart FID-case capex

1476000000 EUR

2025-11-28
pres26-offtakeContracted offtake volumes over 10 years

222000 t LHM

2026-10-30
pfs26-npvLudwig post-tax NPV8 at 2029 FID

1727000000 EUR

2029-01-01
pfs26-capexLudwig capex at FID (real 2026)

1261000000 EUR

2026-09-03
pfs26-priceLudwig lithium carbonate price assumption (real 2026)

20588 EUR/t Li2CO3

2026-09-03
fid25-debtSenior debt package

1185000000 EUR

2025-12-03
fid25-usesTotal funding requirement Phase One

2200000000 EUR

2025-12-03
fid25-npv-preFID-case pre-tax NPV8

1838000000 EUR

2025-11-28
plc25-econFID-case average EBITDA

427000000 EUR/yr

2025-12-04
roy26-expiryLithium royalty exemption expiry

None None

2030-12-31
px-closeASX close

1.15 AUD/share

2026-10-30
px-volVolume on 30 Oct 2026

6906217 shares

2026-10-30
snap-52w-hi52-week high

6.84 AUD/share

2026-10-30
li-spotGFEX lithium carbonate settlement

91140 CNY/t

2026-10-29
fx-eurAUD/EUR

0.6072 EUR per AUD

2026-10-30
peer-emh-closeEMH close

0.14 AUD/share

2026-10-30
Conflicts requiring judgment1
  • Lionheart post-tax NPV8 valuation date

    Both the December 2025 pack and the Ludwig PFS quote Lionheart post-tax NPV8 EUR1,152m at an FID-date basis of 28 November 2025 (nominal 8%, mid-period); the Ludwig PFS NPV is at a 2029 FID date. The December 2025 pack is used for Lionheart and the PFS only for Ludwig, never compared like for like.