Aeris Resources Limited

Producer · Copper · Gold · AU Rating locked: sign in to view v8.1 · ais-20261102t225744-full
Last 2026-11-06
A$0.37
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$555.3M
EV
A$427.5M
Cash
A$127.8M
Debt
A$0

Portfolio detail

Assets

4 assets

Core asset

Tritton Copper Operations (NSW), including Constellation and Mallee Bull

AU

Producer100% ownedCopperGoldSilver

Operating; Murrawombie Stage 2 pit completing November 2026; Constellation open pit under construction (first ore to mill March 2027)

Producer · Producer
Production annualised (attributable)
23.6k td
Production (last FY, 100%)
23.0k t
AISC (latest quarter)
A$13,492/td
AISC margin at spot
31.2%m
Delivery vs guidance
—
Reserve life
7.8 yrsd
Head grade
1.47% Cu
Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (measured, indicated, inferred)33 Mt1.7% Cu; 0.3% Zn; 0.3 g/t Au; 9 g/t AgCopper · Gold · Silver2026-06-30
Ore Reserveproved and probable10 Mt1.7% Cu; 0.4 g/t Au; 10 g/t AgCopper · Gold · Silver2026-06-30
Milestones2
  1. Murrawombie open pit mining completion

    Pending · Medium materiality

  2. Constellation first ore delivered to the Tritton mill

    Pending · High materiality

Economic studies1
StudyStageStatusDateSummary
Constellation open pit maiden ore reserve (PFS-level)PFSCurrent2025-10-28PFS-level open pit reserve: 2.3Mt at 2.0% Cu for 47kt Cu; release gives no NPV or IRR.

Core asset

Cracow Gold Operations (Qld), including Golden Plateau

AU

Producer100% ownedGoldSilver

Operating on FY27 guidance; Golden Plateau resource tripled to 200koz Au (Oct 2026); TSF lift construction from January 2027

Producer · Producer
Production annualised (attributable)
35.2k ozd
Production (last FY, 100%)
40.6k oz
AISC (latest quarter)
A$4,079/oz
AISC margin at spot
30.3%m
Delivery vs guidance
—
Reserve life
2.0 yrsd
Head grade
1.97 g/t
Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (measured, indicated, inferred)5 Mt2.6 g/t Au; 4 g/t AgGold · Silver2026-06-30
Ore Reserveproved and probable1.2 Mt2.1 g/t Au; 2 g/t AgGold · Silver2026-06-30
Milestones1
  1. Tailings storage facility lift construction start

    Pending · Medium materiality

Material

Stockman Copper-Zinc Project (Vic)

AU

PFS Developer100% ownedCopperZincGoldSilver

Feasibility study being finalised after board review; release expected H2 FY27; approvals in place (2024)

Developer · PFS developer
Study
—
Post-tax NPV (study prices, attributable)
—
NPV restated at our deck (attributable)
Locked
IRR
—
Initial capex (100%)
—
Capital intensity
—
LoM AISC
—
Mine life
—
Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (indicated and inferred)17 Mt1.9% Cu; 3.7% Zn; 0.9 g/t Au; 34 g/t AgCopper · Zinc · Gold · Silver2026-06-30
Ore Reserveprobable9.8 Mt1.8% Cu; 3.5% Zn; 0.8 g/t Au; 31 g/t AgCopper · Zinc · Gold · Silver2026-06-30
Milestones1
  1. Stockman feasibility study release

    Delayed · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Primary mining and onsite processing approvalsVictoriaGranted—No
Economic studies1
StudyStageStatusDateSummary
Stockman feasibility study update (Albion Process flowsheet)Updated FeasibilityCurrent2024-01-24Update on the feasibility study; no NPV, IRR or capex published; study under board review in 2026.

Other

Jaguar Zinc and Copper Project (WA)

AU

Care And Maintenance100% ownedZincCopperGoldSilver

Care and maintenance; scout base-metal drilling completed in Q4 FY26 with no significant intersections reported

Care and maintenance · Care and maintenance
Nameplate capacity
—
Restart capex
—
Contained metal (attributable)
420.0k td
Last production year
—
Target restart
—
Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcetotal (measured, indicated, inferred)6.6 Mt1.4% Cu; 6.3% Zn; 0.6 g/t Au; 71 g/t AgZinc · Copper · Gold · Silver2026-06-30

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)