Kantra Copper Limited

Producer · Copper · Gold · Australia Rating locked: sign in to view v6.2
Last 2026-09-02
A$1.025
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$242.5M
EV
A$214.4M
Cash
A$32.2M
Debt
A$0

Portfolio detail

Assets

3 assets

Core asset

Kanmantoo Copper Mine

Australia

Producer100% ownedCopperGoldSilverOthers

Operating underground copper-gold mine and processing plant in South Australia; existing reserve schedule to April 2028, with conversion drilling needed beyond it; garnet tailings are a conditional by-product opportunity.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Operating cost5.76AUD/lb payable Cu AISC

Reported June 2026 quarter AISC, not a life-of-mine feasibility NPV.

Resources & reserves2
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured+Indicated+Inferred22M t0.74% Cu; 0.17g/t AuCopper · Gold · Silver2025-09-30
Ore ReserveProved+Probable4M t0.85% Cu; 0.22g/t AuCopper · Gold · Silver2025-07-01
Tenements2
ml6345Granted436 ha · No expiry supplied
el6526Granted— None · No expiry supplied
Milestones2
  1. Emily Star first stoping

    Pending · High materiality

  2. 2026 mineral resource and reserve update

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Kanmantoo Programme for Environment Protection and RehabilitationSouth AustraliaGranted—Yes
Kanappa exploration PEPRSouth AustraliaGranted—No
Economic studies1
StudyStageStatusDateSummary
2025 Kanmantoo reserve-based mine planOperating PlanCurrent2025-10-30Reserve schedule to April 2028 at US$3.85/lb copper; later resource conversion not yet a reserve.

Material

Mutooroo Copper Project

Australia

PFS Developer0% ownedCopperGoldCobalt

Havilah-owned as of cutoff. Kantra has a binding earn-in right to 80% only at FID after PFS, Stage 2 consideration and conditions; Stage 1 payment completed.

Published study economicsIssuer or study metrics

No numeric study economics were published.

No published PFS NPV, operating cost or development capital as of cutoff.

Resources & reserves1
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceJORC sulphide resource12.5M t1.53% Cu; 0.20g/t AuCopper · Gold · Cobalt—
Tenements1
el6592Granted— None · No expiry supplied
Milestones2
  1. Mutooroo PFS Phase 1 logistics and metallurgy outcome

    Pending · High materiality

  2. Conditional Mutooroo final investment decision

    Pending · High materiality

Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Mutooroo future mining and transport approvalsSouth AustraliaRequired—Yes
Economic studies1
StudyStageStatusDateSummary
Mutooroo Pre-Feasibility StudyPFSCurrent2026-05-21Phase 1 metallurgy and ore logistics expected December quarter 2026; mine and tolling economics unproven.

Other

Regional South Australian exploration

Australia

Early Explorer100% ownedCopperGold

Kanappa and newly granted prospects are exploration stage; no resource or mine plan is attributed.

Tenements2
el7130Granted373.57 km2 · No expiry supplied
el7131Granted44 km2 · No expiry supplied
Permits & approvals1
PermitJurisdictionStatusExpiryCritical path
Kanappa E-PEPR exploration approvalSouth AustraliaGranted—No