OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor KCN ASX

Kingsgate Consolidated Limited

Producer · Gold · Silver · TH · CL Rating locked: sign in to view v8.1 · kcn-20261031t210323-full
Last 2026-11-06
A$4.22
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$1.1B
EV
A$1B
Cash
A$108.9M
Debt
A$24.2M

Portfolio detail

Assets

3 assets

Core asset

Chatree Gold Mine

TH

Producer100% ownedGoldSilver

Operating open-pit gold-silver mine with two CIL plants (~5.4-5.6 Mtpa); restarted 2023 after the 2017 government-ordered closure; Plant 1 ball mill repaired after a July 2026 failure; A-East cutback and A-West de-stack under way.

Producer · Producer
Production annualised (attributable)
59.2k ozd
Production (last FY, 100%)
86.1k oz
AISC (latest quarter)
A$3,608/oz
AISC margin at spot
38.9%m
Delivery vs guidance
95.6%d
Reserve life
13.9 yrsd
Head grade
0.47 g/t Au
Published study economicsIssuer or study metrics
Operating cost16.16USD/t NSR break-even cut-off
Discount rate9%Published study basis

JORC Table 1: positive NPV at US$1,950/oz; value not disclosed.

Resources & reserves7
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourcemeasured18.4 Mt0.68 g/t Au, 6.5 g/t AgGold · Silver2026-06-30
Mineral Resourceindicated69.1 Mt0.75 g/t Au, 5.6 g/t AgGold · Silver2026-06-30
Mineral Resourceinferred23.6 Mt0.63 g/t Au, 3.9 g/t AgGold · Silver2026-06-30
Mineral Resourcetotal111.1 Mt0.72 g/t Au, 5.4 g/t Ag (2.6 Moz Au, 19.3 Moz Ag)Gold · Silver2026-06-30
Ore Reserveproved8.1 Mt0.83 g/t Au, 6.9 g/t AgGold · Silver2026-06-30
Ore Reserveprobable38.2 Mt0.77 g/t Au, 6.3 g/t AgGold · Silver2026-06-30
Ore Reservetotal46.2 Mt0.78 g/t Au, 6.4 g/t Ag (1.2 Moz Au, 9.5 Moz Ag)Gold · Silver2026-06-30
Milestones3
  1. Updated Interim Mine Plan and EHIA submitted to DPIM

    Pending · High materiality

  2. Install new Plant 1 ball-mill discharge head (planned shutdown)

    Pending · Medium materiality

  3. Grant of 13 remaining Phichit Special Prospecting Licences

    Pending · Medium materiality

Permits & approvals3
PermitJurisdictionStatusExpiryCritical path
Interim Mine Plan (long-term mining, water and tailings)Thailand DPIMPending—Yes
TSF1 extension and new tailings capacityThailand DPIMRequired—Yes
Board of Investment promotion certificate (8-year tax exemption from March 2023)Thailand BOIGranted2031-03-20No
Economic studies1
StudyStageStatusDateSummary
Chatree Ore Reserve mine plan (operating plan)Operating PlanCurrent2025-10-10Reserve-supporting DCF at US$1,950/oz Au, US$26/oz Ag, 33 THB/USD, 9% discount rate; NPV not published; ~9-year reserve life.

Other

Chatree South-East Complex

TH

Resource Stage100% ownedGoldSilver

Inaugural resource (October 2025) 3 km from the Chatree plants; drilling paused pending licence approvals; no reserve.

Resource / scoping · Resource stage
Contained metal (attributable)
544.9k ozd
Resource grade
0.63 g/t Au
% Measured + Indicated
49.9%d
Resource tonnes
26.90 Mt
Our value per attrib. contained unit
Locked
Mining method
Open pit (RPEEE shell, 0.3 g/t Au cut-off)
Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated13 Mt0.65 g/t Au, 4.5 g/t AgGold · Silver2026-06-30
Mineral Resourceinferred13.9 Mt0.61 g/t Au, 5.1 g/t AgGold · Silver2026-06-30
Mineral Resourcetotal26.9 Mt0.63 g/t Au, 4.8 g/t Ag (0.5 Moz Au, 4.2 Moz Ag)Gold · Silver2026-06-30

Material

Nueva Esperanza Silver-Gold Project

CL

PFS Developer100% ownedSilverGold

Pre-feasibility stage (2016 PFS; reserve updated September 2026); royalties and water rights bought from Anglo American in May 2026; geometallurgical drilling under way; spin-out preferred; no development decision.

Developer · PFS developer
Study
Ore Reserve update (2026) on 2016 pre-feasibility study inputs
Post-tax NPV (study prices, attributable)
—
NPV restated at our deck (attributable)
Locked
IRR
—
Initial capex (100%)
—
Capital intensity
—
LoM AISC
—
Mine life
12.0 yrs
Published study economicsIssuer or study metrics
Operating cost21.5USD/t milled ore-based cost (Arqueros)
Discount rate8%Published study basis

Optimisation inputs only; NPV and capex not published.

Resources & reserves4
TypeCategoryQuantityGradeContained mineralsDate
Mineral Resourceindicated26.1 Mt0.34 g/t Au, 68 g/t AgSilver · Gold2026-06-30
Mineral Resourceinferred4.7 Mt0.48 g/t Au, 37 g/t AgSilver · Gold2026-06-30
Mineral Resourcetotal30.8 Mt0.36 g/t Au, 63 g/t Ag (0.36 Moz Au, 62.4 Moz Ag)Silver · Gold2026-06-30
Ore Reserveprobable23.7 Mt0.34 g/t Au, 68 g/t Ag (0.26 Moz Au, 51.9 Moz Ag)Silver · Gold2026-06-30
Milestones1
  1. Development or spin-out decision for Nueva Esperanza

    Delayed · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
Groundwater extraction up to 50 L/sChile DGAGranted—Yes
Environmental approval for constructionChile SEARequired—Yes
Economic studies2
StudyStageStatusDateSummary
Nueva Esperanza Pre-Feasibility StudyPFSSuperseded2016-04-132016 PFS at US$1,200/oz Au and US$19/oz Ag; costs and prices superseded by the 2025-2026 reserve updates.
Nueva Esperanza Ore Reserve update (Cube Consulting)PFSCurrent2026-09-10Probable reserve 51.9 Moz Ag, 0.26 Moz Au; updated mining and processing costs; 8% discount rate; NPV not published.

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)