OREMAVEN
XMM 7,722.00 -2.63% YTD +5.6% OM ASX 450.55 -2.56% YTD +0.1% OM PRECIOUS 349.20 -2.24% YTD +2.5% OM EX-PREC 418.91 -2.72% YTD -1.1% XAU 4,115.59 +2.31% YTD -4.9% GLD 375.49 +0.81% YTD -5.2% GDX 85.75 +1.37% YTD -0.0% SIL 77.33 -1.00% YTD -7.3% COPX 70.23 -5.81% YTD -1.8% URNM 40.07 -2.79% YTD -27.0%
2026-11-06
◂ Monitor TAM ASX

Tanami Gold NL

Scoping Study Developer · Gold · Australia Rating locked: sign in to view v6.2
Last 2026-11-06
A$0.06
1D
—
1M
—
YTD
—
1Y
—
Upside
Locked: sign in to view
Mkt cap
A$141M
EV
A$55.6M
Cash
A$75.9M
Debt
A$0
1 newer ASX announcement not yet reflected in this valuation

Portfolio detail

Assets

1 assets

Core asset

Central Tanami Project Joint Venture

Australia

Scoping Study Developer50% ownedGold

TAM owns and funds 50% with MGX. A 14-month A$38 million Groundrush exploration decline contract was signed in August 2026; Jims drilling, metallurgy, processing studies and approvals continue before any 2027 development decision.

Project location

Approximate location

Loading location…

© OpenStreetMap contributors. Basemap imagery © Esri (Maxar, Earthstar Geographics). Dated overlays contain modified Copernicus Sentinel data. Visible surface changes do not establish production or completion.

Published study economicsIssuer or study metrics
Initial capexA$38MPublished capital estimate
Initial capexA$40MPublished capital estimate
Operating cost3.95AUD/t milled

Signed approximately A$38 million, 14-month contract on a 100% CTPJV basis; TAM funds 50%, or A$19 million before any variance. This is exploration access, not full mine capex.

Conceptual 100% CTPJV incremental flotation-circuit cost shown in the May 2026 presentation; it is not a feasibility estimate and is excluded from base valuation.

Resources & reserves3
TypeCategoryQuantityGradeContained mineralsDate
Mineral ResourceMeasured, Indicated and Inferred31M tonnes2.8 g/t AuGold2025-09-30
Mineral ResourceIndicated and Inferred11M tonnes3.3 g/t AuGold2025-09-30
Mineral ResourceMeasured, Indicated and Inferred2.6M tonnes2.7 g/t AuGold2025-09-30
Tenements11
el26925Granted— None · No expiry supplied
el26926Granted— None · No expiry supplied
el28282Granted— None · No expiry supplied
ela28283Application— None · No expiry supplied
el28474Granted— None · No expiry supplied
ela32149Application— None · No expiry supplied
ml22934Granted3,950 hectares · No expiry supplied
mls167Granted— None · No expiry supplied
mls168Granted711.9 hectares · No expiry supplied
mls180Granted— None · No expiry supplied
ml33760Granted— None · No expiry supplied
Milestones3
  1. Groundrush portal development start

    Pending · High materiality

  2. Updated Mineral Resource estimate

    Pending · High materiality

  3. Groundrush decline completion and underground infill drilling

    Pending · High materiality

Permits & approvals2
PermitJurisdictionStatusExpiryCritical path
CLC Mining Permit 97896Central Land Council, Northern TerritoryGranted—Yes
Environmental and government development approvalsNorthern Territory, AustraliaPending—Yes
Economic studies1
StudyStageStatusDateSummary
Central Tanami processing and development options reviewScoping StudyCurrent2026-05-08GRES work is assessing refurbishment versus replacement of the idle 1.2 Mtpa CIL plant and a possible 1.5 Mtpa configuration; no decision-grade NPV, mine plan or reserve has been disclosed.