94 of 94 developer assets

Developer

Core metrics for this asset type · click a row for detail and sources
BHP Construction 100% potash CA Locked ———Locked—US$15.3bd———
NXG Construction 100% uranium CA Locked 2021 FS with August 2024 interim cost trend updateA$4.9bd—Locked39.6%sA$2.2bd——10.7 yrss
NST DFS unfunded developer 100% gold AU Locked ———Locked—————
CMM PFS developer 100% gold AU Locked pfs——Locked124%sA$474.0msA$2,597/(oz/yr)dA$1,873/ozs19.2 yrss
PRU Construction 80% gold TZ Locked Updated feasibility——Locked—A$761.4md—A$2,402/ozd16.0 yrs
S32 Construction 100% zinc, lead, silver US Locked Updated feasibilityUS$3.1bd—Locked19%US$3.3bUS$29,730/(t Zn/yr)d—33.0 yrs
KP2 DFS unfunded developer 9,758.0% potash CG Locked Optimised DFS (Kola Optimisation Study Update)US$1.6bd—Locked1,800.0%sUS$2.1bsUS$941/(t/yr)dA$140/td23.0 yrss
GGP Construction 100% Au, Cu AU Locked DFSsA$2.9bd—Locked22.5%sA$1.1bdA$5,126/(oz/year/yr)dA$1,725/ozs17.0 yrss
DPM DFS unfunded developer 100% gold RS Locked DFSUS$782.0md—Locked36%sUS$448.0msUS$3,343/(oz/yr)dA$965/ozs10.0 yrss
PDI DFS unfunded developer 100% gold GN Locked DFS / reserve-only NI43-101US$1.4bd—Locked46%sA$665.1mdA$2,818/(oz/yr)dA$1,629/ozs11.5 yrss
BCI Construction 100% salt AU Locked Optimised feasibility study base case (June 2023), salt-first case restated in the February 2024 equity raising booklets——Locked—A$1.4bsA$270/(t/yr)dA$23.73/ts60.0 yrsg
INR DFS unfunded developer 10,000.0% lithium, boron US Locked DFS update, 1.5-day leach (Oct 2025)US$2.2bd—Locked1,800.0%US$1.7bUS$82,510/(t/yr)dA$10,170/t77.0 yrs
RSG Construction 90% gold CI Locked DFSA$3.3bd—Locked72%A$739.4mdA$4,375/(oz/year/yr)dA$2,109/ozd13.0 yrss
CSC DFS unfunded developer 100% copper, gold, iron_ore CL Locked Updated FeasibilitysUS$1.7bd—Locked24.1%sUS$2.3bsUS$35,519/(t/yr)d—19.0 yrss
BCM DFS unfunded developer 10,000.0% rare_earths BR Locked bfsUS$1.5bd—Locked105%US$74.0mUS$13,455/(t/yr TREO)dA$18,905/t20.0 yrs
HCH PFS developer 8,960.0%d copper, gold, silver, molybdenum CL Locked PFSUS$1.1bd—Locked19%sUS$1.3bsUS$17,162/(t/yr)dA$6,467/ts20.0 yrss
RRL PFS developer 100% Au AU Locked PFSA$1.1bd—Locked21.8%sA$1.1bsA$5,852/(oz/yr)dA$1,718/ozs9.4 yrss
BMC DFS unfunded developer 100% Ag, Zn, Cu, Au, Pb CA Locked Feasibility Study (October 2023 economic update, 2025 NI 43-101 report)——Locked42%sUS$492.0msUS$65.81/(oz/yr)dA$-23.17/ozs8.8 yrsd
TCG PFS developer 80% Au CI Locked Pre-feasibility study (PFS)US$1.7bd—Locked79%sUS$409.9msUS$2,091/(oz/yr)dA$2,136/ozs10.3 yrss
MI6 PFS developer 100% gold AU Locked PFSA$2.3bd—Locked43%sA$855.0mA$6,840/(oz/yr)dA$2,520/ozs19.0 yrss
SMI PFS developer 10,000.0% gold NZ Locked Updated pre-feasibility study (June 2025, 1.2Mtpa CIL)A$780.0md—Locked3,900.0%sA$277.0msA$3,063/(oz/yr)dA$1,660/ozs13.8 yrss
AKM DFS unfunded developer 10,000.0% coking_coal MN Locked Updated Project Cost Model with JORC reserve supported at least at pre-feasibility level (Glogex)sUS$1.5bd—Locked6,000.0%sUS$61.2msUS$12.24/(t/yr)d—31.0 yrss
WIA DFS unfunded developer 8,000.0% gold NA Locked DFSUS$971.2md—Locked4,100.0%sUS$474.8msUS$3,624/(oz/yr)dA$2,401/ozs14.0 yrss
ARU Construction 100% rare_earths AU Locked Definitive feasibility study (2019), updated mining study (2020), feasibility update (2021) and project update (2022); economics restated 17 Jun 2026US$1.9bd—Locked18.1%sUS$1.2bsUS$268,243/(t/yr)dA$65,723/ts38.0 yrss
SBM PFS developer 100% gold CA Locked PFS updatesA$1.7bd—Locked81.6%sA$315.0msA$2,972/(oz/yr)dA$1,563/ozs13.0 yrss
RXL Construction 100% gold AU Locked DFSA$965.0md—Locked55%A$383.0mA$3,274/(oz/yr)dA$1,978/oz6.8 yrs
PMT DFS unfunded developer 100% Li2O, Cs2O, Ta2O5 CA Locked Feasibility Study (CV5 lithium-only)C$1.6bd—Locked18.1%C$1.5bC$39,249/(t/yr)dA$15,961/td19.0 yrs
AUC DFS unfunded developer 10,000.0% gold AU Locked Updated DFS, Dec 2025 (life-of-mine case)A$1.0bd—Locked5,240.0%A$354.0mA$2,990/(oz/yr)dA$2,252/oz10.3 yrs
MC2 DFS unfunded developer 10,000.0% copper CL Locked DFSsUS$709.0md—Locked3,100.0%sUS$587.0msUS$13,651/(t/yr)dA$7,771/ts13.0 yrss
AAR DFS unfunded developer 100% gold AU Locked Pre-feasibility studyA$1.0bd—Locked86%sA$227.0msA$2,970/(oz/yr)dA$2,085/ozs18.5 yrss
MEI DFS unfunded developer 100% rare_earths BR Locked DFSUS$847.0md—Locked24%US$498.4mUS$39,872/(t/yr)dA$24,306/t23.0 yrs
VMM DFS unfunded developer 10,000.0% rare_earths BR Locked DFSsUS$1.2bd—Locked3,640.0%sUS$449.0msUS$100,990/(t/yr)dA$37,573/ts25.0 yrss
VUL Construction 7,270.0%d lithium DE Locked FID case (updated End of Validation Study), December 2025€837.5md—Locked1,370.0%s€1.5bs€69,953/(t/yr)d—30.0 yrss
TSO PFS developer 90.6% Au CL Locked PFS (Ore Reserve modifying factors)US$900.9md—Locked57%sUS$276.5msUS$3,023/(oz/yr)dA$2,208/ozs13.0 yrs
WC8 DFS unfunded developer 100% lithium AU Locked DFSA$1.5bd—Locked28.4%sA$774.0msA$25,917/(t/yr)dA$1,009/ts15.0 yrss
RMS Funded developer 100%r gold AU Locked dfsA$692.0md—Locked34%——A$2,625/oz9.0 yrs
SVL DFS unfunded developer 10,000.0% silver, zinc, lead, gold AU Locked Definitive feasibility study (DFS), Lycopodium, July 2026A$735.8md—Locked2,620.0%sA$454.5msA$142/(oz/yr)dA$32.91/ozs26.0 yrss
AZY PFS developer 100% Au, Cu, Ag, Co AU Locked Scoping studyA$598.0md—Locked46%sA$306.3msA$2,552/(oz/yr)dA$1,721/ozs11.0 yrss
SBM Construction 50% gold PG Locked feasibilitysUS$511.5md—Locked79%sUS$275.0msUS$1,674/(oz/yr)dA$2,013/ozs13.0 yrss
DYL DFS unfunded developer 95% U3O8 NA Locked Definitive Feasibility Study (2025 DFS, revised March 2025)US$548.1md—Locked19%sUS$474.0msUS$194/(lb/yr)dA$71.29/lbs30.0 yrss
SRL DFS unfunded developer 100%r scandium AU Locked Feasibility StudyA$1.3bd—Locked76%sA$462.5md——32.0 yrss
RIO PFS developer 70% copper, gold, silver AU Locked ———Locked—————
GMD PFS developer 100% gold AU Locked ———Locked—————
AEE DFS unfunded developer 85% uranium MR Locked Bankable Feasibility StudyUS$425.3md—Locked28%sUS$349.8msUS$197/(lb/yr)dA$59.28/lbs26.0 yrss
IPX DFS unfunded developer 100% REE, Ti, Zr US Locked DFSsUS$813.0md—Locked39.4%sUS$228.1msUS$1,285/(t/yr)d—14.0 yrss
CYM Construction 100% Cu AU Locked PFSA$756.0md—Locked23.6%sA$458.0msA$13,268/(t/yr)dA$8,110/ts20.8 yrss
KGL Construction 100% Cu, Ag, Au AU Locked Baseline Economic Model (pre-FID update of the 2025 Feasibility Study)A$839.0md—Locked31%sA$439.0msA$15,860/(t/yr)dA$7,745/ts10.0 yrss
BMN Construction 5,225.0% uranium NA Locked Definitive Feasibility Study (Etango-8, December 2022) with June 2024 FEED cost updateUS$320.8md—Locked2,670.0%US$353.0mUS$101/(lb/yr)dA$55.50/lb15.0 yrs
ELV DFS unfunded developer 6,000.0% Li2O CA Locked Definitive Feasibility Study (February 2024)sC$1.3bd—Locked3,440.0%sC$962.0msC$53,444/(t/yr)dA$855/ts21.1 yrss
BTR Construction 10,000.0% gold AU Locked DFS 2.0 updated definitive feasibility study——Locked7,400.0%A$188.0msA$2,507/(oz/yr)dA$2,998/ozs6.0 yrss
CHN PFS developer 10,000.0% platinum_group_metals, nickel, copper, cobalt AU Locked Pre-feasibility study (PFS), two-stage open-pit phasesA$1.0bd—Locked2,300.0%sA$820.0msA$3,680,431/(koz/yr)dA$17,911,538/ts23.0 yrss
MM8 Construction 100%r gold, copper, silver AU Locked feasibility studyA$443.0md—Locked8,700.0%A$138.0mA$1,792/(oz/yr)dA$2,279/oz5.7 yrs
A11 DFS unfunded developer 69.8%r lithium GH Locked Definitive feasibility studysUS$1.0bd—Locked105%sUS$185.0mUS$10,771/(t Li2O/yr)dA$15,984/td12.0 yrs
BML Construction 100% Ag, Pb AU Locked Project Delivery Plan — main22Mt pre-tax case——Locked97%sA$261.5msA$125/(oz/yr)dA$12.42/ozs10.5 yrss
AEU DFS unfunded developer 100% uranium ZM Locked feasibilitysUS$242.6md—Locked20.8%sUS$281.9msUS$134/(lb/yr)d—12.0 yrss
SFR PFS developer 8,689.0% copper US Locked PFS——Locked—US$474.0msUS$15,290/(t/year/yr)d—12.0 yrss
WHC PFS developer 100%d others AU Locked ———Locked—————
DVP Construction 100% Cu, Zn, Ag AU Locked June2026 FID based on October2025 UpdatedDFS with May2026 FEED costs——Locked37%sA$450.0msA$49,315/(t/yr)d—8.0 yrss
PLA Construction 85% others PG Locked —US$136.8md—Locked29.2%sA$129.0mA$356/(t/yr)d—30.0 yrss
LKE DFS unfunded developer 8,000.0% Li2O AR Locked DFS AddendumUS$808.8md—Locked1,970.0%sUS$1.2bsUS$46,280/(t/yr)d—25.0 yrss
VUL PFS developer 8,550.0%d lithium DE Locked Preliminary Feasibility Study (PFS), 3 September 2026€1.5bd—Locked2,020.0%s€1.3bs€59,763/(t/yr)d—30.0 yrss
SKY PFS developer 100% Sn, WO3, Ag AU Locked PFSA$309.3md—Locked57.2%sA$138.8msA$68,025/(t/yr)dA$8,003/ts7.2 yrss
PLA DFS unfunded developer 98%d others PG Locked —US$278.3md—Locked—————
FRS PFS developer 100% Au AU Locked PFS——Locked—A$98.0msA$2,616/(oz/yr)dA$3,293/ozs10.0 yrss
DVP Construction 100% Li2O AU Locked StageI DSO Final Investment Decision——Locked55%sA$40.0msA$3,922/(t/yr)d—1.0 yrsd
ELV PFS developer 10,000.0% Li2O US Locked Definitive Feasibility Study (December 2021, integrated mine and hydroxide plant)sUS$2.0bd—Locked2,700.0%s————
TVN DFS unfunded developer 79.9%d others AU Locked feasibility study (2026)A$274.8md—Locked28.9%sA$301.3msA$2,022/(t/yr)dA$513/ts10.0 yrss
CIA PFS developer 51% iron_ore CA Locked pfsA$309.8md—Locked9.8%A$4.3bdNMNM25.0 yrs
HCH PFS developer 8,000.0% water CL Locked PFS (stage 1 seawater supply)US$97.6md—Locked19%sUS$151.0ms——20.0 yrss
KCN PFS developer 100% Ag, Au CL Locked Ore Reserve update (2026) on 2016 pre-feasibility study inputs——Locked————12.0 yrs
DPM PFS developer 100% gold RS Locked NMNM—LockedNM————
AMI Funded developer 10,000.0% copper, gold, silver AU Locked Feasibility Study (approved April 2025)A$51.0md—Locked—A$91.8mA$8,743/(oz Au/yr)d—8.0 yrs
BCI PFS developer 100%r SOP AU Locked Salt plus SOP base case (February 2024 equity raising booklet); SOP plant not approveds——Locked—A$186.0mdA$1,329/(t/yr)dA$363/ts60.0 yrsg
DPM DFS unfunded developer 100% gold, silver, copper EC Locked NMNM—LockedNM————
GLN DFS unfunded developer 10,000.0% lithium AR Locked DFSUS$2.0bd—Locked4,300.0%sUS$278.0msUS$13,238/(t/yr)d—40.0 yrss
SMR PFS developer 100% others AU Locked ———Locked—————
KP2 PFS developer 9,758.0% potash CG Locked Updated PFS and production target (DX)US$268.3md—Locked2,730.0%sUS$315.7msUS$786/(t/yr)d—12.0 yrss
FRS PFS developer 100% Au AU Locked PFS——Locked—A$16.1msA$504/(oz/yr)dA$3,609/ozs2.0 yrss
AMI PFS developer 10,000.0% gold AU Locked Pre-feasibility study (June 2026)A$42.0md—Locked25,800.0%A$3.3mA$1,031/(oz Au/yr)d—10.0 yrs
FRS PFS developer 100%r Au AU Locked PFS——Locked—A$8.0msA$304/(oz/yr)dA$2,905/ozs1.0 yrss
SMR PFS developer 100% others AU Locked PFS——Locked—A$202.3md———
IG6 DFS unfunded developer 49% graphite IT Locked Technical and financial evaluation (June 2026)——Locked—————
RHI PFS developer 100% Fe AU Locked PFS (April 2014, historical; not refreshed)——Locked—————
FRS PFS developer 100%r Au AU Locked PFS——Locked—A$11.5msA$590/(oz/yr)dA$3,849/ozs0.7 yrss
AII PFS developer 100%d tungsten, tin ES Locked ———Locked—————
AIS PFS developer 10,000.0% copper, zinc, gold, silver AU Locked ———Locked—————
CIA PFS developer 100% iron_ore CA Locked ———Locked—————
DVP DFS unfunded developer 20% Cu, Zn, Ag AU Locked ———Locked—————
ILU DFS unfunded developer 100%r REE AU Locked ———Locked——NMNM—
LYC DFS unfunded developer 0%d rare_earths BR Locked DFS——Locked—US$498.4msUS$39,872/(t/yr TREO)dA$23,853/ts23.0 yrss
PLA DFS unfunded developer 100% others PG Locked ———Locked—————
RIO PFS developer 50% iron_ore AU Locked ———Locked—————
RIO Construction 53.9% lithium CA Locked ———Locked—US$2.0bd———
WAF Construction 85% gold BF Locked ———Locked—————

d derivedr our researchg guidances study forecastm daily marketNo marker: as reported— / NM missing or not meaningful (hover for why)

Rows are ranked by our attributable value. Assets of different types are never ranked together. Resources, reserves, grades, study capex and study NPV are reported or missing, never estimated.